Document QJnppbn1evpwkMbg75OaXpX1E
Chmtea/t
PUT IT IN WRITING Data 19 March 1974
To T. W. HerbipSubject VCM STATUS - WEEK ENDING 18 MARCH
Prom ft. W. McGinnis______________
( ) Take Action
( ) For Your Approval
( ) For Your Comments { ) As Requested
( )ForYourlnfo ( ) Discuss With Me
I ) File
( ) Note & Return
ns-cr^z?
SUMMARY
MAR 251974
K RIM1NS, V. F.
1. Low VCM exposure of reactOT cleaners using Mr. G, B. H. Speed's boilout procedure is verified with this week's personal monitor samples. Four out of five total samples show 9-17 ppm VCM; one
sample analysed about 52 ppm.
2. The reactor building chromatograph is now calibrated; however, indications are tha-t it is still reading too
low.
3. The reference gas supplied by Allentown confirms the Calvert Lab calibration procedures.
4. The four chromatograph monitor points on the third floor are satisfactorily located.
5. Reactor building VCM levels increased somewhat this
past week over the previous week. The increase appears to be within the normal scatter of VCM levels.
6. Two major reactor building improvements are scheduled
for completion by 25 March: activation of first and second level fans and blend tank ventilation. At
the completion of these two projects, an intensive four day surveillance comparable to the initial survey will be done.
7. The exhaust fans on the third floor tend to pull up vapors from heavy releases on the bottom floor, when the exhaust fans on the bottom two floors are not
operating.
PERSONAL MONITOR - REACTOR CLEANING
Personal monitor data for the past week continued to show low levels of VCM exposure. The low exposure to the reactor cleaners using Mr. G. B. H. Speed's reactor boilout
procedure was maintained. Four of the five samples taken showed 9-17 ppm, although a higher value of 51.5 ppm was observed once. All personal monitor data taken to date are summarized by areas in Table I.
AP00005887
Mr. T. W. Herbig 19 March 1974 Page 2
Subject: VCM STATUS - WEEK ENDING 18 MARCH
FIXED CHROMATOGRAPH INSTALLATION - REACTOR BUILDING
Receipt of calibration gas from Allentown permitted our reactor building chromatograph to be properly aligned in the instrument response to vinyl chloride. The chromatograph was calibrated at the factory for VCM. Upon installation its readings were roughly 30% of the comparable Century OVA values. Presumably the circuitry was affected by shipment. The chromatograph is now properly calibrated for VCM. However, I question the accuracy of the total system, as the excessively low readings of the chromatograph in comparison to the Century OVA Analyzer C29 ppm average difference), indicates that a small leak is present somewhere in the maze of fittings, pump, etc. Previous comparisons between the laboratory chromatograph and the Century OVA, and also the amounts of VAc and propylene indicated by the reactor building chromatograph, show a difference of about 10 ppm is a reasonable contribution by vinyl acetate, propylene and miscellaneous organics. The accuracy of the chromatograph sampling system will be further scrutinized this week.
COMPARISON OF LABORATORY CALIBRATION WITH REFERENCE GAS CALIBRATION
The cyclinder of calibration gas was received. The analysis of this gas (100 ppm) agrees within 3 ppm of our Laboratory chromatograph. This is within the accuracy of the analysis. The independent preparation and analysis of this calibration gas, and confirmation of its content by our Laboratory, both corroborate Mr. M. H. Stermon's analytical method and also verify the calibration gas supplied by APCI at Allentown.
CHROMATOGRAPH MONITOR LOCATION
The suitability of the chromatograph sampling points on the reactor building third floor was investigated. The objective of specifying these sampling locations was to obtain fairly representative samples of the room contents. Four monitors are available for the third floor, or approximately one monitor per 1500'feet, excluding the nineteenth reactor.
VCM levels at the monitor locations are found to be reasonably representative of the levels on the third
Mr. T. W. Herbig 19 March 1974 Page 3
Subject: VCM STATUS - WEEK ENDING 18 MARCH
floor, without excessive deviation from surrounding VCM levels. This is best seen by noting the VCM levels on a plot plan, and visually comparing the readings. Figure I illustrates two such comparisons.
The monitor locations will be checked for the other two floors when the exhaust fans are activated. This does not indicate that stagnant areas are not present that could have excessively high or low concentrations - such stagnant areas will be identified in future work. It also does not judge whether or not monitors should be located in stagnant areas. The conclusion is reached, however, that the locations selected'have VCM levels comparable to most of the third floor.
REACTOR BUILDING VCM LEVELS
VCM on all three floors is somewhat higher than last week, largely because of leaks and maintenance.
Table II lists the Century OVA readings taken on each . shift this past week.
REACTOR BUILDING IMPROVEMENTS
The next anticipated improvements are scheduled for this week. The absence of conduit has held up activating the exhaust fans foT the first and second floors. Conduit arrived as this report is being written and wiring will immediately start. These fans are expected to be turned on within several days.
The blend tank ventilation system is likewise scheduled for completion by 25 March.
VCM VAPORS RISING FROM LOWER FLOORS
The exhaust fans on the third floor do tend to pull up vapors from lower levels. Two known instances of monomer venting on the first floor, and one other period of high VCM levels on the first floor, were accompanied by corresponding rises in VCM on the third floor. A central location on all floors was
AP00005889
Mr. T. W. Herblg 19 March 1974 Page 4 Subject: VCM STATUS ` WEEK ENDING 18 MARCH
selected for comparison (Figure 2).
R^W. McGinnis RWM:sc Attachments cc: A. R. Adams/Valley Forge
J. T. Barr/Valley Forge T. L. Carey/Valley Forge W. D. Draffen
K. E. Dunning
R. Fleming/Trexlertown/Valley Forge (2) J. D. Kramer D. V. Lowe A. K. McMillan/Pensacola J. C. Novak/Valley Forge E. A. Primeau/Pensacola E. A. Ray/Pensacola W. M. Smith/Allentown Labs G. B. H. Speed E. M. Spurlock/Valley Forge M. H. Stermon H. L. Watson/Valley Forge
AP00005890
p
AP00005891
ANALYSIS OF MONITOR LOCATIONS
READINGS
IN
PPM VCM
TABLE X
PERSONAL MONITOR DATA (1)
DATE
SHIFT
Reactor Building Operators
2/22/74 2/23/74 2/23/74
3
1 2
2/23/74 2/24/74
3
1
2/27/74 2/28/74
3 2
2/28/74
2
3/ 3/74 3/ 3/74 3/ s/74
1
3 2
3/ s/74
3
3/ 8/74 3/X0/74 3/11/74
2
2 2
3/11/74
3
3/1S/74
2
Reaotor Cleaners (3)
3/ 7/74
2
3/12/74 3/13/74
3 1
3/13/74
3
3/14/74
.3
m.QR
3 2 2 2 2
1
3' 2 2 3
1
3
1 2
3
1 1
PPM VCM
10.82
5.66
9.20
16.67
9.69 24.66
23.11
36.79 5.7
57.5 (2) 15.3
16.4
6.95
11.06 9.18
15.6
9.6 16.1
51.5 15.4
16.1
AP00005893
DATE Dryer Building
3/ 6/71).
Maintenance
3/ 1/lbr
SHIFT
i 1
FLOOR
pfm vcm
6.5
3.6
(1) Lists all data obtained to date* including that listed in two earlier reports.
(2) High readings obtained with Century Analyzer on day shift.
(3) Was wearing monitor while cleaning reactor.
AP00005894
TABLE II VCM LEVELS - CENTURY OVA ANALYZER
i
DATE/ TIME
Outside Main Lab
PVC Lab Aisles (Low-High)
Reactor Building
First Floor - Compressor Area (Low-High) Center Aisle - West End Center Aisle - Center Center Aisle - East End
Second Floor
South Aisle - East End South Aisle - Center South Aisle - West End Stripper - Oper*s Desk Middle Aisle - Center Middle Aisle - East End
"'bird Floor
Operator*s Desk N* Middle Aisle - West End N. Middle Aisle - Center N. Middle Aisle - East End S. Middle Aisle - East End S. Middle Aisle - Center S, Middle Aisle - West hd
3/11/74 1520
14 31-79
79-150 150-292 150-292 107-150
150-221 . 150 150-292 292 150-292 150
121-135 150 121-135 107-121 107-121 135-150 135-150
3/11/74 __ 2200_
CO
CO-22
14-31 22 57 31
14 64 -40 40 31 40
50 50 40 40 31 31 50
3/12/74 0645
CO CO-17
79-121 57 50 31
14 79 50 64 64 22
35 40 31
a
31-107 40
3/12/74 1510
CQ 22-50
3/12/74 2230
14 CO-22
22-31 31 22-31 31-50
64-150
93 79 40
31 31-40
31 31-64
31 31-40
40
71
64 79 64 79
64-79
85
50-64
107
50-64
121
79-93 150-221
93 64
50-79
93
50-79
79
Pipe broken !
Maint. repairing
i
3/13/74 0600
14
CO-14
CO-14 150 221 107
135 150 135 135 107 79
221 221 221 221 221 221 292 Vac. PUIfap Leak
AP00005895
VCM LEVELS - CENTURY OVA ANALYZER
DATE/ TIME
Outside Main Lab
PVC Lab Aisles (Low-High)
Reactor Building
J'irst Floor - Compressor Area (Low-High) Center Aisle - West End Center Aisle - Center ' Center Aisle - East End
Second Floor
South Aisle - East End South Aisle - Center South Aisle - West End Stripper - Opera's Desk Middle Aisle - Center Middle Aisle - East Ehd
Third Floor
Operator^ Desk N* Middle Aisle - West End N Middle Aisle - Center N* Middle Aisle - East &id S. Middle Aisle - East End S, Middle Aisle - Center S. Middle Aisle - West End
3/13/74 1445
12.5
22-31
3/13/74 2200
34
17-18
150-2,850
107-135 107-135 50-57
40-135 221
57 22
5o-64 79-93 79-93 64-79 79-93
79-93
27 46
-65 72
67 31
150-292
107-135 79-107 64 64-79
79-93 150-292
Maint. working on
compressor
76 60 60 58
58 93 57
3/14/74 0515
17
14-22
292 50 79 40
50 71 57 31 64 31
93 107 93 50 50 57 71
3/14/74 . 1500
1422-31
150-577 79-121 107-150 79-107
107 121-135 79-93 79 79-107 64-79
64-79 57-64 64 64-79 50-64 5o 5o
3/14/74 2130
12.5
31-107 <
150-292 22 79-93 46
27 79-93 43 27 27-40 107-121
33 46 50 39 35 43 31
3/15/74 0445
CO
22-31
150-292 107 79 31
22 79 79 64 79 57
40 50 64 40 50 50 31
AP00005896
AP00005897
VCM LEVELS - CENTURY OVA ANALYZER
DATE/ TIME
Outside Main Lab
PVC Lab Aisles (Low-High)
Reactor Building
First Floor - Compressor Area (Low-High) Center Aisle - Vest End Center Aisle - Center Center Aisle * East &id
Second Floor
South Aisle - East End South Aisle - Center South Aisle - West End Stripper Oper.'s Desk Middle Aisle -- Center Middle Aisle - East End
'^hird Floor
Operator's Desk N. Middle Aisle - West End N. Middle Aisle - Center N. Middle Aisle - East End S. Middle Aisle - East End S. Middle Aisle-Center S* Middle Aisle - West Ehd
3/15/74 2130
17 22-50
79-150 50-64 85 46
57 85 57 57 76 4
79-107 64 64 40 % 61
3/16/71; 0430
4.0
CO-14
3/16/74 1330
<L0
22-31
50-292
64 150 50
22-31 64
79 22
79 14 64 22 107 50 150 31 150 50 50 27
150 31 150 31 107 50 50 1 . 31
85 25 150 31 150 22
3/16/74 2200
12.5
12.5-40
79-121 12.5 64-79 79
71 79 40 22 93 93
25 35 64 93 107 64 24
3/17/74 . 0615
ao
14-22 *
31-107 22 64 27
31 40 57 107 64 31
50 50 50 64 64 50 50
3/17/74 1400
CO
14-22
31-50 40 71 22
17 31 57 50 57 31
40 46 57 40 57 50 40
i
VCM LEVELS - CENTURY OVA ANALYZER
DATE/ TIME
3/17/714. 2100
Outside Main Lab
<10
PVC Lab Aisles (Low-High)
14-79
Reactor Building
First Floor - Compressor Area (Low-High) Center Aisle - West Bid
Center Aisle - Center Center Aisle - East Ehd
64-107
12.5 5o 22
Second Floor
South Aisle - East End South Aisle - Center South Aisle - West End Stripper Oper.'s Desk Middle Aisle - Center Middle Aisle - East End
20
57 35 17 50
24
""-ird Floor
Operator's Desk N. Middle Aisle - West End
N. Middle Aisle - Center N. Middle Aisle - East End S. Middle Aisle - East End S. Middle Aisle - Center S. Middle Aisle - West Bid
20
31 40
35 35 5o 22
3/18/74 0630
14
ao
22-292
22-79 64 31
31 107 150 93 93 64
31 40 50 31 40 40 31
i
AP00005898