Document QJgmnywxx8rBROxRQ5vNgRbno

I Section 212.306 Traffic Areas All normal traffic pattern-access areas surrounding storage piles specified in Section'' 212.304 and all normal traffic pattern roads and parking facilities which are located on mining or manufacturing property shall be paved or treated with water, oils or chemical dust suppressants. All paved areas shall be cleaned on a regular basis. All areas treated with' water, oils or chemical dust suppressants shall have the treatment applied on a regular basis, as. needed, in, accordance with the operating program required by Sections 212.309. 212.310 aind 212.112.. (Source: Amended at 3 111; Peg. 100. effective October 26. 1979) Section 212.307 Materials Collected by Pollution Control Equipment All unloading and transporting operations of materials collected by pollution control equipment shall be enclosed or shall utilize spraying, pelletizing, screw conveying or other equivalent methods. .. (Source: Amended at 3 111. Reg. 100. effective October 26. 1979) Section 212.398 .Spraying or Choke-Feeding Required i . Crushers, grinding mills, screening operations, bucket elevators, conveyor-transfer points.conveyors, bagging, operations.- storage bins and '' ftneJ product truck-and railcar-loading operation's shall- be sprayed with water or a surfactant solution, util ize-choke-feeding or be ' treated by an equivalent method ;1n accordance with an operating program. (Source: Amended at 3 111. Reg. 100. effective October 26, .1979) Section 212.309 Operating Program The sources described in Sections- 212:304 through 212.308 shall be operated under the provisions of an operating-program prepared by 'the owner or operator.and submitted to the Agency for its review. Such operating program shall be designed to significantly reduce fugitive particulate matter emissions. (Source: Amended at 3 111.. Reg. 100. effective -.October 26. 1979) Section 212.310 Minimum Operating Program As a minimum the operating program shill include the following: a) The name and address of the facility; b) The name and address.of the owner or operator responsible for execution of the operating program; c) A map or diagram of the facility showing approximate locations of storage piles, conveyor loading operations, normal traffic pattern access areas surrounding storage 'piles and all normal traffic patterns within the facility; d) Location of unloading and transporting operations with pollution control equipment: r e) A detailed description of the best management practices utilized to achieve compllance with .this .Subpart. -including an engineeringspecification of particulate, collection equipment, application systems for wats*-. oil. chemicals-and dust-suppressants andequlvalentmethodvutitized;..... . i f) Estimated frequency of application of dust suppressants by location of materials: and . g) Such.other information as.may be necessary to '.. facilitate, the Agency's review of the operating program. " '(Source:.` Amended at. 3 Ml. Reg. 100. effective `October-26; 19797- ........ ' Sectloa il2.1.12, ... Amendment .to Operating, Program, The operating program shall be amended from time to XU^.by the- owner or operator -so thal the - operating program is.current. Such amendments shall be:consistent with-^this Subpart and shall be submitted to the Agency.for its review. r' > . . ('Source: Amended at 3 Hi. Reg. 100. effective October 26. 1979) Section 212.313 Emission Standard for ' Particulate Collection ' Equipment If particulate, col lection equipment is operated pursuant to Sections-212.304 through 212.310 and 212.312. emissions from such equipment shall not exceed.68 mg/dscm.(0.03 gr/dsef). (Source: Abended at 3 111. Reg. 100. effective October 26.1979) Section 212.314 Exception for Excess Wind ! Speed Section 212.301' shall not apply and spraying pur.suaaL,ta-Sectt<M\s.,2l2.1.a4 .through 212.110 and 2t2.312 shall .not be required when the wind speed is greater than 40.2 kilometers per hour (2$-miles per Hour). Determination of wind speed for the purposes of this rule shall be by a one-houf average or hourly recorded value at the'nearest official station of the U.S. Weather Bureau or by wind speed instruments operated on the `site. In cases .where the duration of Operations. subject to. th i s .cule.. 1 s i ess than one hour', wind speed may be averaged over the duration of the operations on the basis of on sitejwind speed instrument measurements. - 54