Document QJ7b7yNmnN6kb94wMv1we6Xz8
MOn&dlllO
"*"- C . F. Buckley - W. 0. * Krummrlch Plant
TO J. R. Savage - B2SL
" 0. L. Bratsch
W. C. Engman
M. R. Foresraan
P E -Helsler O. A. Hippe
P. B. Hodges - E1S7
A. E. Lelsy/Q. Johnson
A. Qalllon
W. B. Papageorge - B2SL
W. R. Richard
- T3A
J. A. Munoz
I. PCB Losses in Sewers
June losses at .9 lb/day from operating departments and the incinerator oompared to A.5 lb/day of last
month.
A. Aroclor Department. PCB losses at .8 lbs/day compared to A.A lbs/day of last month.
B. Incinerator losses remained low at .10 lbs/day.
C. Waste Treatment Influent. Losses averaged 2.5 lbs/day compared to A lbs/day of last month.
D. Waste Treatment Effluent. Losses averaged 2 lbs/day compared to 3 lbs/day of last month.
II. Program Status
The HC1 pressure control valve opened 9 times for very short periods during the month indicating that a good balance between HC1 production and consumption has been maintained. The duct leading from the demister haB been kept clear and the benefit has been reflected in the results. There have been no measur able losses from the HC1 using areas and the amount reaohlng the treatment plant is much closer to that measured at the department.
The estimate for Project 8AA0 to provide flow measure ment and proportional sampling at the incinerator has been submitted for approval.
/ghw
C. F. Buckley
MQNS 030271
COa-fpe/
MONS 030272