April 14, 1972
I 1
E. M. Fenner - Denver
SPECIAL DUST SURVEY TRANSITE PIPE FIELD OPERATIONS
Personal dust samples on several field operations that are performed on TRANSITE pipe have been re-tested. Samples taken on April 10, 1972 were obtained outside between PD #1 Building and New Business Building, Strong drafts were present blowing dust away from the operator.
Due to rain, those taken on April 13, 1972 were inside the walkway connecting PD #1 and PD #2. The large doors on both sides of the walkway were opened and a moderate draft was blowing away from the operator.
Bob Anderson performed the operations and Joe Macko and Tom Bordas con ducted the sampling.
Pipes used for testing were 4 in. Telephone Duct, 6 in. CL150 Water Pipe and 8 in. CL2400 Sewer Pipe. All samples were of 20 minute duration. The test results are as follows:
Operation Manual Machining
Power Machining
Hand Rasping
Harrcner and Chisel (Tapping for Sewer Saddle)
Skill Saw Cutting
C . I u.J.A^
E. (]. Bui ava
Date 4-10-72
4-10-72 4-10-72 4-10-72
Pipe Size
4 in. 6 in. 8 in.
6 in. 8 in.
6 in. 8 in.
8 in.
F/cc
0.4 1,2 0.4
0.6 0.4
1.6 1.2
1.2
4-13-72
4 in.
4.1
6 in.
2.9
8 in.
4.5
MTB004041
cc: 6. L, Swallow - Denver R. S. Anderson - Manville