Document Ozdm7Z79NpO5wqrpMRQv60NRM
ABDOO110239
VISTA CHEMICAL COMPANY ABERDEEN PLANT
SEPTEMBER 2, 1992
PROCESS HAZARD ANALYSIS FOR
VCM TANK FARM COMPRESSOR UPGRADE PROJECT
ABDOO110240
VCM TANK FARM COMPRESSOR UPGRADE PROCESS HAZARD ANALYSIS COMPLETION REPORT
TABLE OF CONTENTS
SUBJECT
PAGE
I. SCOPE..................................................................................................1
II. TEAM. MEMBERS............................................................................... 2
III. DOCUMENTS UTILIZED............................................................... 3
IV. SUMMARY OF POTENTIAL HAZARDS..................................... 4
V. P&ID
5
t ABDOO110241
VISTA CHEMICAL CO., ABERDEEN PLANT VCM COMPRESSOR UPGRADE - PHA COMPLETION REPORT SEPTEMBER 2, 1992 I. SCOPE
This Process Hazard Analysis was completed specifically for the VCM Tank Farm Compressor Upgrade project. This Safety and Health project installs instrumentation and DCS interlocks for the compressors to provide safer operation during VCM unloading. The PHA does not cover the overall operations of unloading VCM from the railcars to the sphere. A separate PHA has already been completed for the unloading operation. The PHA addressed instrumentation failures and reviewed DCS interlocking schemes for the equipment.
1
ABDOO110242
VISTA CHEMICAL CO., ABERDEEN PLANT VCM COMPRESSOR UPGRADE - PHA COMPLETION REPORT SEPTEMBER 2, 1992
II. TEAM MEMBERS
The following is a list of the team members assembled to perform the PHA on this project. All are employees of Vista at the Aberdeen plant.
NAME
TITLE
Larry Frye Berlin Genetti Dean Honeycutt Jerry Roberts Joe Shackelford Rory Sneed Jim White
General Mechanic "A" Co-op Process Engineer Yard Supervisor Safety Inspector Instrument Technician Senior Process Engineer Project Engineer
2
ABDOO110243 VISTA CHEMICAL CO., ABERDEEN PLANT VCM COMPRESSOR UPGRADE - PHA COMPLETION REPORT SEPTEMBER 2, 1992
III. DOCUMENTS UTILIZED The following documents were made available to each team member prior to and during the PHA. 1. Class "A" Design 2. Piping and Instrumentation Diagram 3. Mechanical Drawings
3
ABDOO110244
VISTA CHEMICAL CO., ABERDEEN PLANT VCM COMPRESSOR UPGRADE - PHA COMPLETION REPORT SEPTEMBER 2, 1992
IV. SUMMARY OF IDENTIFIED POTENTIAL HAZARDS
1. CAUSE:
Failure or accidental closing of the VCM vapor valve (00HV103) from the sphere, the liquid VCM valve (00HV102) to the sphere, or the railcar isolation valve (00XV120).
CONSEQUENCE:
Cavitation or dead-heading of the VCM
compressors.
This could potentially
damage the compressors and subsequently
cause a VCM leak.
RECOMMENDATIONS:
Include the inputs for these valves in the compressor interlocking, such that the compressors are shut down when any of these valves are closed.
RESOLUTION:
The above recommendation has been implemented into the electrical design and operating procedures.
RISK RATING:
4
4
A-ti
Oo P617.
EMMISSIONS RECOVERY
SYSTEM KNOCK
OUT POT
I
SPHERE KNOCK
OUT POT
ABDOO110245
T fm
J___ t+m CTH^CMORJ
ISU JATE DESCRIPTION
BY . CKD API
wtota Vista Polymers
V i\J 1 n Aberdeen, MLsstsstpp<
VCM TANK FARM COMPRESSOR
UPGRADE PU D
APP& DATE*
SCALD No.