Document OzM8O7xo6zdRYKY50qD2JdMzK

CONTRACT CONTRACT NUMBER C"15-010-69 ^ Chevron Oil Company ~ Western Division /dba/ standard Oil Company Of Taxes a corporation, hereafter referred to as COMPANY, and the undersigned, hereafter identified as CONTRACTOR, hereby mutually agree on July 24 1^9 , that CONTRACTOR shall perform for COMPANY, at or near 41x0 E1 Paso Ha finery County of B1 Paso State of Ikxas the work set forth and entitled Schedule of Work Attachment #1 dated 24, 1969 as an improvement to real property of COMPANY by affixing thereto whatever materials are involved therein so as to become an integral part of such real property, under the Terms and Conditions, pages 2 through 5 hereof, and in accordance with the above Specification, which Terms and Conditions and Specification, attached hereto, are part of this agreement. .... COMPANY shall pay CONTRACTOR, in accordance with statements prepared by Contractor a compensation^* as outlined in Attachment #1. The work shall be commenced July 24* 1969 diligently prosecuted, and completed August 24* 1969 A payment and performance bond in terms and executed by a surety company satisfactory to COMPANY shall be furnished to COMPANY in the sum of (No bond required unless an amount is entered above.) The Equal Opportunity Clauses attached hereto are part of this Agreement. (Line out the preceding sentence if Equal Employment Opportunity Provisions do not apply to this contract.) CONTRACTOR R* L. Vbigt-Demolitloa Contractor By And Witness Contractor's State License No. (Where required by State Law) COMPANY Qievron Oil Company - Wastarn Division /dba/ Standard Oil Company of Texas By And Communications to CONTRACTOR should be directed to the attention of Voigt at P. Of Box 994 Luling, Texas 78648 Communications to COMPANY should be directed to , thfi Attention of,., P. S. Gates at P. O. Box 20002 ET Paso Texas--7999B----- Note: -- If CONTRACTOR is incorporated, execution shall be by an authorized officer of the corporation and corpor ate seal affixed and attested to by the Secretary. If CONTRACTOR is not incorporated, signatures should be witnessed by an employee of COMPANY, if practicable; if not, by a disinterested party. Qjarge to 48421-001 GO-279-GEN-CW (CDD 2/69) CHEV BB 0000607 ATTACHMENT #1 SCHEDULE OF WORK CONTRACT C-15-010-69 JULY 24. 1969 1. Remove one pipeway stanchion and one davit south of Hydrofiner:, columns. Remove concrete footings and patch flush with existing concrete-slab. Hot $ 55.00~ ;. 'vscz-tT. ,;r s; . -rr-. is;?.-?..-.- - ........ i 2. Remove two (2) steel brine pits and one (1) concrete brine pit, one (1) pump, one (1) small open top tank and associated piping. Backfill and rake level. .. i. : : $ 1100.00 r... v; . Cold $ 1400.00 3. Remove concrete slab near brine pits - ' . .;a*_ $ 155.00 4 4 Remove tank D-2636, pump and related piping to outside of retaining wall., -Plug sewer. Hot $ 525.00v :, : Cold $ 605.00 5. Remove three (3) concrete foundations and one (1) 10* x 10* grade beam in the Treating Plant. Backfill and rake. $ 75.00 6. Remove concrete basin on the north side of the Treating Plant Control House and three (3) concrete foundations in the same area. Backfill and rake. $ 45.00. 7. Remove two (2) concrete foundations under D-2608. Backfill :and rake. Hot $ 120.00^ Cold $___145.00 8. Remove tank D-2637 and haul to Company's storage area. Remove related piping to area south of adjacent building. Remove concrete footings and backfill and rake. > - -.r- , " : >, Hot. $___ 675.00^.,. . * Cold $ 715.00 9. Remove concrete acid trench south Alky Acid tanks. Backfill and rake. - ' ... $2.)53 0- /-slia- e/i a'/}ljf* o.Q oO t 10 Remove three (3) concrete foundations in "D:< tank basin. $ 45.00 11. Remove loose 6" pipe in "D" tank basin Hoti) $ Colc. $ 6.00 ^ > 12.50.,, I i CHEV BB 0000608 ATTACHMENT pi Schedule of Work Contract C-15-OlU-rby July 24, 1969 * " I -:`Ji "s. : i'.l wv- i'M.f x,nr ; " / ` : vi i*y rr.utJci; > *- - * ,4 - / * , ' V j . .*` i vr, v. ~ . * * 1 it.of & u.. 12>'.Ropove two (2) concrete foundations in south Alky area near SE corne^qjj; Control House. Remove below-gradeand patch to existing slab. . . ,, Hof ' -v.aV.--V Cold $ 145.00^ / 13. Remove daadman for old Thermal Cracker stack. Backfill. $ 40.00 14. : :c Remove, two (2)r.pipee, two'- (2) electrical outlets'an'dr twbrdmall pipe5 a'Eancftidns bdcSfct?.?- tank,. u-.; *.. : --.j..-n-ry. 5 mr-yJ. :.A jcsc.'..Vi'..*, t-:* f &<>-:. ;.sr.:> Tsn'is /*- -oV,:'-.'-; ,< Snw.Ucstivn :^.Vjciv;-1$,fi-~.-i125vOQ "*' 15.`'!Eem6v6'! concrete foundation, electrical outlet and guard post at .07..Tank. Backfill f.C~8ttd=*raka.;: r*<y CC'"T. -\~7U(i-tcr.-roRo-s-u. s- p/eo^s?<' ".; *3 -la *1. $ 50.00 e ' 16. Remove two (2) small pipe stubs in Main Pipeway North, south of 87 Tank, t c>-V.: Hot $____ 5.00 y Cold $ 7.50 17. 'Rembve deirrick on #5 water well Hot $ 150.00 18. .,;.s ^mpye. iottadatipu.at #5- water . well Hot $ 75.00 19. Remove foundation north''of #1 substation.' Backfill and rake. $ " 30.00 20. Remove concrete slab adjacen t to 4 acre storage area. Backfill and rake. , -, sJCf"'! `-.'k.i -.s.g-.Wrwar?(9i"0.,0'<? -0.; , 21. ' Remove clndarBl&ck guard house' and concrete'__sXah.ia.sTlop-area gate--and-backfill and rake. Furnish and replace fence. Anu. " -- ............ T "3WM~....... 22. -'. Remove. caus.tic,,loading .rack, backfill and rake. Hot $ 50.00 23. l'Remove deirfick oh #6 water wall. Hot $ 175.00 - -v - % ..... Contractor will :.retain all. salvage and scrap with the,; exception of- D-2637. which he will haul to; Company*s storage area. Contractor, will. haul.di^.con^ete...`>r|a>i'l^ to dump^are* desi'gnated'by 'Company Representative,__________ .4. . 6090001 aa ' s.-r-- ' vO >'( j ' 4- -'4- -"31: #*4 S11 ?/*=: ' 2 2 0- *' ' " f- 2. , cfc -1C ~ j. 2-0 f .! I ' 5/ authorization for change in the work Contract number C--15-010-69____ Authorization Humberi_______ Date (of this authorization) July 31 1969_________ Chevron Oil Company - Western Division, d/b/a Standard Oil Company of Texas Company R. L. Voigt - Demolition Contractor_______________________________________ Contractor CONTRACTOR is hereby authorized to make the following CHANGE IN THE WORK in connection with the above-designated contract, all applicable provisions of which shall apply to the work as thus changed: DESCRIPTION OF CHANGE: Furnish labor and equipment to, demolish two concrete slabs south of the chemical warehouse in the sales area. Grade the area and remove all extraneous material. chg: 48421-001 Agreement as to adjustment in price S220.00______ increase (Two hundred twenty and no/100 dollars)_______________________________________________________________________________ Date accepted Date authorized for Contractor for Company CONTRACTOR - Pleaaa sign duplicate copy and return to Company. Above change In the work completed - (Date)____________ (Signed! Remarks___________________________________________________________________________ G0-283-GEN. (CD-8-64) paints* la u.i.A. h e v b b: )000610 authorization for change in the work Contract Number. C--15-010-69 Authorization Number 2 Date (of this authorization) August 6, 1969 Chevron Oil Company - Western Division, d/b/a Standard Oil Company of Texas Company R. L. Voiet - Demolltlan Contractor_________________________________________________________ Contractor CONTRACTOR is hereby authorized to make the following CHANGE IN THE WORK in connection with the above-designated contract, all applicable provisions of which shall apply to the work as thus changed: DESCRIPTION OF CHANGE: Furnish labor, equipment and material to remove did concrete foundation for K-1204 to below floor level of compressor house and fill in with new concrete to a smooth finish. chg! 48421-001 j Agreement as to adjustment In price ^40 QH Ingrpaap____ (For^y and nn/lflO dollars) Date acceptedDate authorized for Contractor for Company CONTRACTOR - Pleaae lgn duplicate copy and return to Company. Above change In the work completed - (Date)____________ (Signed) Remarks____________________________________________________________________ GO-283-GEN. (CD-8-64) PSINTIB IN U.i.A. CHEV BB 0000611 ' authorization for change in the work C-15-010-69 Contract Number_______ Authorization Number ^ Date (of this authorization) AugUBt 13, 1969 ______ Chevron Oil Company - Western Division, dba/Standard Oil Company of Texas Company S. L* Voigt - Demolition Contractor____________________________________________ ___________ Contractor. CONTRACTOR is hereby authorized to make the following CHANGE IN THE WORK in connection with the above-designated contract, all applicable provisions of which shall apply to the work as thus changed: DESCRIPTION OF CHANGE: Furnish labor and equipment: to remove concrete foundation inside tool shed at Gas Recovery No. 1 Compressor House. Charge: 1-5105 Agreement as to adjustment in prtr. $20.00 Increase (Twenty and no/100 dollars) Date accepted Date authorized for Contractor for Company CONTRACTOR - Plcaso sign duplicate copy and return to Company. Above change in the work completed - (Date)____________ (Signed) Remarks G0-283-GEN. (CD-8-64) .MINT.. IM U.t.i- CHEV BB 0000612 authorization for change in the work Contract Nimher C-15-010-69-- Authorization Number______ ^_______ Date (of this authorization) August 15 X969 _________________ Chevron Oil Company - Western Division, dba Standard Oil Company of Texas Company R. L. Voigt - Demolition Contractor______________________________________________ _______ Contractor CONTRACTOR is hereby authorized to make the following CHANGE IN THE WORK in connection with the above-designated contract, all applicable provisions of which shall apply to the work as thus changed: DESCRIPTION OF CHANGE: Furnish labor and equipment to remove abandoned 6" lead lined waste acid line from the north plot limit of the Isomerization Plant to the north end of mBm pipeway overhead. Charge: 48421-001 Agreement as to adjustment in Prir.a $300.00 increase (Three Hundred and no/100 dollars) Date accented Date authorized for Contractor for Company CONTRACTOR - Please eign duplicate copy and return to Company. Abova change in the work completed - (Patel (Signed! - authorization for change in the work Contract Authorization Number. Date (of this authorization) August 21, 1969 CHEVRON OIL COMPANY-WESTERN DIVISION, d/b/a STANDARD OIL COMPANY OF TEXAS Company R. L. VOIGHT - DEMOLITION CONTRACTOR_______ '__________________________ _ Contractor . CONTRACTOR is hereby authorized to make the following CHANGE IN THE WORK in connection with the above-designated contract, all applicable provisions of which shall apply to the work as thus changed: DESCRIPTION OF CHANGE: Furnish labor and equipment to remove excess soil from the west side o the chemical warehouse. CBS: 3-5152 t Agreement as to adjustment In price $90.00 (increase) Ninety and no/100 dollars Date accepted Date authorized for Contractor for Company CONTRACTOR - Please sign duplicate copy and return to Company.____________________________________________ _____________________ kbove change In the work completed - (Date)____________ (Signed) _ Remarks______________ ___________________________________________________________________________________. GO-283-GEN. (CD-8-64) raixTia la u.s.a. :hev bb )000614 August 28, 1969 Standard Oil Company of Texas vj), Sox 2000? El Faso, Texas 79993 Attention* Kr. Tom Ksnsfield itef: ?ayKent of corole led `Contract ;S'o. r- / /'in - <v? I respectfully request payment of completed contract as follows: Total amount of contract including change orders less actual draw requested August 11, 1969 i|821.00 1275.00 Total anount due and payable 5-3516.00 Thank you for the work. Sincerely, ?.C. Sox 99U Lulinr, Texas 7361*3 H.L. Voigt CHEV BB 0000615 August 11, 1969 Standard Oil Company of Texas P.0. Box 20002 EL Paso, Texas 79998 Attentions Mr. Tom Mansfield Ref: Draw on Contract No. C 0 / O*- f I respectfully request a draw against contract stated above in the amount of Fifteen Hundred Dollars ($lfjOO.OO). Respectfully, P.0. Box 99h Luling, Texas 786I4.8 R.L. Voigt CHEV BB 0000616