Document OzKGBm3xGyo0jYm5K0MgQJpjM

PLAINTIFF'S EXHIBIT DUP-16S4 September 13, 1979 TO: FROM: ALL SUPERVISION - LIST "A" S F DIVISION VICTORIA PLANT CENTRAL SAFETY COMMITTEE MINUTES OF MEETING HELD WEDNESDAY, SEPTEMBER 13, 1979 Membe rs Present: Members Absent A. D. 0. A. R. M. C. R. F. W. D. J. G. R. J. V. B. L. D. J. P. N. W. T. B. W. D. G. W. R. H. W. M. A. W. P. H. F. J. H. B. W. C. E. J. E. J. M. D. R. C. A. Cyphers - Chairman Sampson Robertson Steele Farnsworth Logan Ehrman Woodrick Sutphen Logan Costello Dodson Hardy Jentsch Stevens Anderson Ervin Ledet Charlton Heck (for R. E. Keith) Culpepper Bunn Borden Kavser Bommer - Grodahl (for S. V. Hinson - R. E. Keith H. W. Shahan S. V. Hinson Visitors: E. A. Maeker J. H. Heck L. H. McArthur J. H. Hook R. D. Oakley W. L. Reimann J. P. Veldman Construction) DU 007970 DUP 0801503 Victoria Plant Central Safety Committee Minutes of Meeting Held Wednesday, September 13, 1979page 2 I. The Monthly Safety and Jiousekeeping Audits and Injury Summary for August were reviewed. One common item noted was Cleco fittings on water hoses at well water locations. Hoses without Cleco fittings should be in these locations. A contractor job gave indication of the need for clarifica tion of a "standby man" assigned by DuPont to follow outside contractor work on the plant. Lack of guards on river pump motors prompted the question of why this was overlooked. Unlabeled liquid containers continue to be noted. Several unprotected syringe needles were noted. Asbestos material continues to appear. Liquid Wrench containing "Benzol" should be disposed of. The Committee was impressed with the excellent work practices, safety check status, and overall condition of the DNB Area. The four high potential injuries is the highest monthly total this year. Congratulations to the following Housekeeping Award winners: Bldg. 10-Electronic Shop, Diamine Maint. Shop, Diamine Synthesis T/F, Acids Power Water Treatment and 516 517 T/F. Ill Incident Reports Incident Reports Nos. 79-43 through 79-55 were reviewed. The following additional comments were made: 79-47 - Areas having work line breathing masks equipped with the "break away" coupling should ensure that this type fitting has been eliminated. The use of the Plant gas escape alarm is encouraged for all gas releases. Recommendation No. 6 is in error as S F does not routinely inspect work equipment. Inspection of this equipment should be done by the proprietor. DU 007971 DUP 0801504 BaTiiinirTi r`nj-*L-m- A Victoria Plant Central Safety Committee Minutes of Meeting Held Wednesday, September 13, 1979Page 3 III. IV. V. VI . VII. 79-49 - A committee is working on Recommendation No. 2. A special note has been sent to the Departmental Engineer's office for publicity. 79-50 - Hugh Charlton is to consult with construction to evaluate methods of observation and truck move ment during loading. 79-55 - Unusual unplugging operations should be done only after a procedure has been developed to do the job safely. Safety Activities - W. T. Dodson See attachment No. 1. The Central Safety Committee expressed pleasure, and ex tends congratulations to all plant people upon winning the 12th Board of Director's Award. All plant people should be pleased and are encouraged to keep up the good work. I/H Procedures - J. M, Kayser I/H No. 4 - Purchasing New Chemicals was approved. I/H No. 19 - Radioactive Materials was approved. I/H No. 16 - Hearing Conservation was returned to committee for clarification, condensation and a requirement that an engineering study be done on each noise source over 87 dBA to determine if an engineer ing change would be feasible. S F 20 - Vessel Entry - Revisions - E. A. Maeker A production person will be appointed to work with Maeker's committee. The committee should address contractor entry, and should cross reference the vessel entry procedure with the radiation procedure. S F 45 - Hydrostatic Testing - Revisions - H. F. Charlton The revised procedure will be circulated and presented for approval at the next Central Safety Meeting. Vehicle Safety Check List-s - H. F. Charlton New safety check lists are being installed in all plant ve hicles. Everyone is encouraged to use the check list. DUP 0801505 DU 007972 Victoria Plant Central Safety Committee Minutes of Meeting Held Wednesday, September 12, 1979 Page 4 VIII. IX. X. Breathing Air Facilities - H. F. Charlton A committee will conduct a process hazards survey of this facility. Fire Incident Report Statistics - C. E. Bunn See Attachments 2 and 3. Key Safety Data The Incident Frequency Rate trend is upward at a fierce rate. Total high potential incidents are running about 40% ahead of 1978. This trend is of great concern to the Central Safety Committee. CEB/kms DUP 0801506 DU 007973 ATTACHMENT 1 SAFETY ACTIVITIES SEPTEMBER, 1979 ON PLANT 649 Safe Days 1979 Goal Status 3 MM Safe Hours 4 MM Safe Hours BOD Award 5 MM Safe Hours 2 Years' Injury Free Achieved Feb. 6 Achieved June 29 Achieved September Possible Nov. 19 - Possible Dec. 2 Tape and Slide Safety meeting on Railroad Safety near completion. CPR Training for I&E mechanics underway. Preparation of Plant Traffic Safety meeting (Vehicle and Pedestrian) underway. Goal completion - October Safety tips issued on Information Sources for Toxicity. OFF PLANT 58 Safe Days -- 9 injuries year to date. Seat Belt Campaign underway with questionnaires out this week.. Home safety handout due early October. Safety General Store to open October 1. Details to be covered at Division Superintendents' Meeting on September 17. 9/12/79 DU 007974 DUP 0801507 Mail :ii:kMMfc.^LgLaaHii MIlffliiiBiBi ATTACHMENT 2 INCIDENT ANALYSIS 1976 - 1979 Incidents Basic Causes Design Procedures People Training Performance Judgment 1976 104 No. i 29 30 17 17 52 53 125 26 26 27 1977 108 No % 29 27 23 22 56 51 10 9 24 20 27 22 1978 76 No. % 29 38 10 13 37 49 23 23- 30 12 16 1979 49 No. 0. 'O 15 31 14 28 20 41 11 7 14 12 25 DUP 0801508 DU 007975 DUP 0801509 9yy > DU 007976 fLfcl L U \ *)tW 5Lb> U.V>I