Document OzBGJGe6ojzVpgwOrQJ486JKQ
CEA 2080
PROJECT MANUAL
Central Engineering Department
TOWOLDMONOQ48719
CEA 20 80 SOLID AROCLOR EXPANSION
Anniston. Alabama CONFIDENTIAL
PROJECT MANUAL
Central Engineering Department
0613152
TOWOLDMONOQ48720
PROJECT ORGANIZATION AND PROCEDURE CEA 2080
SOLID AROCLOR EXPANSION - 20M LBS/YEAR ORGANIC DIVISION Anniston, Alabama
Project Manager - R. S. Yates
EIC
DISTRIBUTION
0. A. Bremer/P. K. Nunn R. Q. Brown/M. Kaye L. R. Burchfield J. W. Campbell/R. B. Degenhardt F. W. Enoch W. C. Geil/T. W. Jackson B. B. Hedleston R. C. Herman R. E. Howard/R. M. Kountz 0. A. Klingler J. L. Mathews/R. R. Cook
C. L. Parish J. B. Phifer L. H. Todd H. E. Waldrep - Anniston R. B. West/K. J. Johnston R. S. Yates Central File
Organic Division
W. E. Voss - Anniston (2)
RETURN TO: CENTRAL FILES
c Not
G DEPT.
--.
- NV
this file.
0613153
TOWOLDMONOQ48721
TABLE OF CONTENTS
1. INTRODUCTION 2. DESCRIPTION OF FACILITIES
2.1 General Description 2.2 Specific Description 3. PROJECT ORGANIZATION 4. SECURITY 5. CED-PLANT RELATIONSHIPS 6. REVIEW AND APPROVAL 7. DISTRIBUTION 8. PROCUREMENT 9. CONSTRUCTION 10. ACCOUNTING 11. PROJECT COMPLETION
APPENDICES PROJECT ORGANIZATION CHART REVIEW AND APPROVAL RESPONSIBILITIES DISTRIBUTION OF DESIGN INFORMATION
FOR COMMENTS DISTRIBUTION OF PROJECT INFORMATION DISTRIBUTION OF VENDOR PRINTS AND
DRAWINGS FOR APPROVAL DISTRIBUTION OF VENDOR FINAL PRINTS,
DRAWINGS, DATA PROJECT DISTRIBUTION LIST
POP, CEA 2080 2/24/69
Page No. 1 1 1 1 1 2 3 3 4 4 5 5 6
Appendix 1 "2 "3
"4 "5
."
*' "
6 7
0613154
TOWOLDMONOQ48722
POP, CEA 2080
2/24/69 Page 1
1. INTRODUCTION
This document describes the organization and procedure for the design, procurement, construction and start-up of manufacturing facilities at Monsanto's Anniston, Alabama, Plant. Communication channels for approval and distribution of documents are established.
Any suggested corrections to this procedure shall be sent to the Project Manager and all revisions will be issued by him.
2. DESCRIPTION OF FACILITIES
2.1 General Description
This project provides for the expansion of the Solid Aroclor facilities of the Organic Chemicals Division at its Anniston, Alabama, Plant from the present 9.6M lbs/year to 29.6M lbs/year. The estimated costs are:
Capital Expense Total
$1,100,000 90,000
$1,190,000
Target completion date is January, 1970. Low capital cost is important to this project; however, a December, 1969, or earlier start-up even at some increased capital cost is desirable.
2.2 Specific Description
Aroclors are reaction products formed by the chlorina tion of biphenyl or terphenyl using an iron catalyst. The by-product HCl gas is absorbed in water. Crude Aroclors are produced in chlorination reaction vessels, air blown and distilled. Solid Aroclors are produced in chlorinator reaction vessels, air blown and dis tilled. They are drummed, flaked, or flaked and milled and packaged for shipment. Distillation resi dues are discarded as waste or sold as Montars. This pioject, to simplify control, will be considered as Area 1 in its entirety.
3. PROJECT ORGANIZATION
3.1 Process design and engineering design of all facili
ties are being done by CED.
._
6^55
TOWOLDMONOQ48723
POP, CEA 2080
2/24/69 Page 2
3.2 procurement will be by CED. See Section 8 - Procure ment .
3.3
All construction at the plant site will be done by construction contracts--either on a lump sum or cost basis. See Section 9 - Construction.
3.4 Cost accounting will follow CED procedures. See Section 10 - Accounting.
3.5 All project participants within CED should communi cate freely with each other and should keep the Project Manager informed by copies of communications of significance.
Communications involving decisions, approvals or other action shall be through the key individuals named below:
Between CED and Organic Division
See Section 5 - CED Plant Relationships
Between Monsanto and Construction Contractor H. E. Waldrep
SECURITY
4.1
Monsanto employees shall maintain the security of proprietary information in compliance with CED Procedure No. 27, "Security of Information." Members of CED, when visiting the plant site, shall comply with security requirements of the plant.
4.2 Arrangements for admission of contractor's employees connected with execution of this project will be made by Anniston, Alabama, management and the Field Construction Superintendent.
4.3 Permission to visit the plant site can be obtained from the following:
H. E. Waldrep, Field Superintendent - All visitors W. E. Voss, Manufacturing Liaison - All Visitors
4.4
Drawings, specifications, etc., will be issued to the contractors for construction by the Field Superinten dent only. Reclaiming all such data from' the con tractors at the end of construction wilj-.be the respon sibility of the Field Superintendent.
06X3156
TOWOLDMONOQ48724
POP, CEA 2080 2/24/69 Page 3
5. CED-PLANT RELATIONSHIPS
5.1
Communications involving decisions, approvals or other action between CED and the Organic Division shall be through the key individuals named below:
R. S. Yates and W. E. Voss
5.2 Trips to the Anniston Plant should be kept to a minimum to conserve travel costs.
Trip itinerary copies shall be sent to the Project Manager and ACM Design Coordinator so that maximum information can be obtained on each trip.
Use the Plant Representative, W. E. Voss, or H. E. Waldrep, the Field Superintendent, to obtain field information as much as possible to minimize the number of trips to the field.
Trips to the plant should be cleared through the Project Manager, who will clear with the Plant Representative. After return to the office, a brief trip report should be issued summarizing accomplishments. Copies should be sent to the Project Manager, Design Coordinator, and Plant Representative and any others who need to know.
6. REVIEW AND APPROVAL
6.1
To prevent delays of project execution, comments arising from review of drawings or other documents must be transmitted to the Project Manager within five working days from receipt of material for plant personnel and three working days for CED personnel. Comments may be made by telephone, followed by written confirmation.
6.2 On documents requiring review or approval from the Organic Division, initials of W. E. Voss will indi cate that concurrence of appropriate operating and maintenance personnel has been obtained.
6.3 Review and approval responsibilities for this project are shown in Appendix 2.
6.4
The originating design engineer will transmit copies of design information for design review in accordance with Appendix 3.
0613157
TOWOLDMONOQ48725
POP, CEA 2080 2/24/69 Page 4
7. DISTRIBUTION
7.1
The originator of specification data sheets, process data sheets or drawings will be responsible for the final distribution.
7.2 The Project Manager will issue approved documents to Project Manual holders only.
7.3 Distribution, including the number of copies of information generated for this project, is shown in Appendix 4.
7.4 Vendor prints for initial approval are distributed according to Appendix 5.
7.5 Vendor prints and data for final distribution are issued according to Appendix 6 and 7.
8. PROCUREMENT
8.1
The appropriate design engineer will initiate bid solicitations and purchase requisitions. Bids are generally solicited before design review is complete. However, design review shall proceed simultaneously with the bid solicitation.
8.2 All purchase orders for numbered equipment items will require the signature of the Project Manager. All other purchases will require his signature unless he specifically delegates this responsibility.
8.3
Instrument and electrical items will be purchased by the instrument and electrical engineers after approval of the respective design bases by the Project Manager. Exceptions will be for major items which will require the signature of the Project Manager.
8.4 The Material Control System for piping, instrument, and electrical material will be used on this project. The Materials Control Engineer for piping and for instruments and electrical will coordinate the activities involving the Materials Control System. Procurement of the following will be handled by CED at St. Louis:
8.41
All numbered equipment items
8.42
All instruments, including panel boards
8.43
All major electrical items, including feeder cables (if required), lighting' fixtures, thermocouple wire, motor control center,
transformers
0613158
TOWOLDMONOQ48726
POP, CEA 2080 2/24/69 Page 5
8.44
All structural steel, grating, floor plate, handrail and stair treads
8.45
All pipe, valves and fittings
8.46
Permanite waste disposal piping materials
8.5 Bill of materials for piping and electrical items will be furnished by the AC&M and EI&U design sec tions to the purchasing section.
8.6
Procurement of the following will be handled by the selected contractors subject to approval of the Construction Superintendent, H. E. Waldrep, and the CED Purchasing Manager:
8.61
Concrete and reinforcing steel
8.62
All building items
8.63
Backfill
8.64
Thermal insulation materials
8.65
Waste disposal piping materials other than Permanite
8.66
Sheet metal ductwork
8.67
All carbon steel pipeand fittings less than lh"
9. CONSTRUCTION
9.1 Supervision of contract construction personnel will be exercised exclusively by H. E. Waldrep, Field Construction Superintendent. Contact with the Con struction Contractor or their employees must be through H. E. Waldrep or his representative.
9.2 Shutdowns for tie-ins to existing equipment, steam mains, relocating instrument control panel shall be scheduled by agreement with Mr. Waldrep and Mr. Voss. Any delays in this area should be brought to the attention of the Project Manager.
10. ACCOUNTING
10.1
All field invoices, approved by the construction Superintendent, shall be forwarded to the Project Accountant for payment by Monsanto.
10.2
Accounting procedures shall be those specified by C. R. Becker, Project Accounting Supervisor at St. Louis.
0613159
TOWOLDMONOQ48727
POP, CEA 2080 2/24/69 Page 6
11. PROJECT COMPLETION
11.1 Mechanical Completion
CED Procedure No. 125 outlines the general procedures and responsibilities for determining when facilities are mechanically complete to release to the Division for start-up.
Punch list procedures and records of mechanical test ing to assure the facilities are mechanically complete will be developed jointly by the Project Manager and Construction Superintendent.
11.2 Process Simulation and Project Demonstration
The Organic Division has the primary responsibility for planning and performing the process simulation ("water batching") and for proving accomplishment of project objectives.
R. S. Yates will review these plans, participate in the process simulation and arrange for participation of other CED personnel as required.
11.3 Initial Operation
The Organic Division is responsible for the initial operation of the facility. This is the early chemical operation of the facility in which each unit of the plant is operated, debugged if necessary, and put on stream. R. S. Yates will represent CED during this phase and will work out an agreement with W. E. Voss on correction of deficiencies made evident by initial operation.
11.4 Project Demonstration
The Organic Division will carry out the project demon stration which is a planned operational run of pre determined duration. The objective is to produce material at the quality, yield and rate as specified in the Process Manual and Project Manual and in com plete accordance with safety standards.
R. S. Yates and W. E. Voss will work out an agreement on termination of CED participation. This will occur when progress toward meeting the project objectives has reached the point where further joint effort is not warranted. W. E. Voss will make th formal report.
0613160
TOWOLDMONOQ48728
POP, CEA 2080 2/24/69 Page 7 11.5 Project Closing R. S. Yates will notify C. R. Becker, CED Accounting, when project demonstration has been completed and work out details of fiscal closing with Mr. Becker. Partial closures will be made when facilities are completed and placed in service.
0613161
TOWOLDMONOQ48729
appenl. A 1 PROJECT ORGANIZATION CHART
POP, CEA 2080 2/24/69 Page g
ORGANIC DIVISION <W. A. Kuhn
----- PD&PM
R. E. Howard R. K. Kountz
A
ORGANIC DIVISION
rW. E. Voss
Ed Smith
Project Manager
DIVISION REPRESENTATIVES
PROJECT MANAGEMENT
.Field Construction Suot.
H. E. Waldrep
T
Design Coordinators-----
CEP Construction O. R. Bailey L. R. Burchfield
--> CED Design
R. C. Herman*^__
L. H. Todd R. R. Cook
L. Parish
Instrument Enqr. Mike Kaye
Electrical Enqr.
K. J. Johnston roject Purchasing <
Purchasing Specialists
tProject 'Expediter *
W. D. Shelton Project Accountant <_
R. W. Meinhardt
*I ProiectTControl 4_____
R. B. Degenhardt P. K. Nunn PROJECT EXECUTION
CED Procurement F. W. Enoch O. A. Klingler H. W. Persons
CED Accounting R. W. Kaltenrieder C. R. Becker
. CED Control R. E. Emling J. W. Campbell O. F. Bremer ADMINISTRATIVE CONTROL
0613162
TOWOLDMONOQ48730
POP, CEA 2080 2/24/69 Page 9
APPENDIX 2
REVIEW AND APPROVAL RBSPOSIBILITIES
A - Approve R - Review 0 - Originate
GENERAL
Design Basis Arrangement Drawings Scope Changes
P~ CESS_____________________
Engr. Flow Diagram Perf. Data Sheets Inst.r. Per Data Sheets
MECHANICAL & STRUCTURAL
Equip. Specs. Equip. Brewings Foundation Drawings Structural Drawings Undergr. Util. Drawings Piping Drawings
ELECTRICAL
Electrical Drawings Electrical Specs
. INSTRUMENTATION
Instrument Drawings . Instrument Specs
. PROJECT EXECUTION
^instrument Purchases 'Electrical Purchases
ACM Purchases Cost Status Reports Project Schedule Procur. Status Reports Construction Specs Construction Contracts
A, 0 A,0 A,0
A, 0 A, 0 A
A A A A A A
A A
A A
R R A R A,0 R A A
AR
R
R ' A, 0 R A, 0 R A, 0 R A,0 R A,0 R A,0
R R
R R
R R R R R'
0.
R R R R R
P ro je c t
Manager
R .S .Y ates ACM D e s ig n C o o rd in a to r
R, C. Herman
1
ACM D e s ig n E n g in e e r jEIU D e s ig n jC o o rd in a to r
I'R. C . H erm an
Instrum ent E n g in e e r
M ike Kaye
E le c tric a l
E n g in e e r K. J . Johnston
C' >
H
4-> 4-' 0m. cc 0 0H CV>) > KH 0V. U> f,'< H C- a t: :*:
R R
R
R R, 0
R R R
RR RR
R R R R T.'
A, 0 A, 0
R R
A,0 A, 0
R R
A, 0
A, 0
R
0613163 1
TOWOLDMONOQ48731
POP, CEA 2080 2/24/69 Page 10
APPENDIX 3
DISTRIBUTION OF DESIGN INFORMATION
FOR COMMENTS
.
'
Design Engineer Instrument Engineer
Completes Spec Sheets, Drawings, Sketches
Design Changes
ACM \Design EI&U) Coordinator
.. he--(i)--
Approves Reviews
(3)
Comments
Hah* Project Manager Reviews & Approves Receives Comments
*Division Mfg. Liaison-
Reviews
Comments -----------
Number in parenthesis is the number of copies distributed 0613164
TOWOLDMON0048732
Central Engineering Department Project Scope Report
Solid Aroclor Expansion
CEA 2080 New 20 M lbs./year Plant
Anniston, Alabama Plant
By: R. S. Yates _ Central Engineerin January 14, 1969. -
Department
06131<>5
TOWOLDMONOQ48733
distribution
Organic Division 1. J. M. Smith 2. W. A. Kuhn 3 . H. L. Williams 4. W. E. Voss
Central Engineering 1. R. M. Kountz 2. R. S. Yates 3. 0. F. Bremer/P.K. Nunn 4. J. W. Campbell/B. W. Steketee/R. B. Degenhardt 5. L. R. Burchfield 6. F. J. Ho.lzapfel 7. Central File 8. R. C. Herman 9. R. C. Herman 10. R. C. Herman 11. R. C. Herman
0613166
TOWOLDMONOQ48734
CEA 2080 Date: 1/16/69 By: R. S. Yates
TABLE OF CONTENTS
Page Ho.
1.1 Project Scope Summary
1.11 Title 1.12 Synopsis and Project "Tone"
1.2 Process Technology
1.21 Process Description
1.211 1.212 1.213
Details of Process Yields and Raw Material Usage Process Documents
1.22 Raw Materials
1.221 Specifications 1.222 Sources
1.23 Products and By-Products
1.231 1.232 1.233 1.234
Quality Considerations Specifications By-Products Packaging and Shipping
1.24 Waste Streams
1.25 Personnel, Property and Public Hazards
1.3 Manufacturing Facilities
1.31 Description
1.311 General 1.312 Manufacturing Facilities
1.32 Design Capacity
1.33 Flexibility Requirements
1.34 Future Expansion
1.35 Physical Appearance
1.36 Storage and Shipping Requirements 1.4 Utilities
_ ''
1.41 Utilities Summary
1.42 Utilities Facilities
1
1 1
3
3
3 3 4
4
4 5
5
5 5 6 6
7
7
9
9
9 9
10
10
11
11 11 12
12
12
0613167
TOWOLDMONOQ48735
Appendices A. Equipment Information Summary B. Process Flow Diagram C. Equipment Arrangement Study D. Building and Site Requirements E. Description of Work by Code of Accounts F. Preliminary Schedule G. Project Loss Prevention Report
0613168
TOWOLDMONOQ48736
Page 1
1! Project Scope Summary
1.11___Title
Aroclors - Increase Solid Arocloir Capacity - Organic ' " Division at Anniston, Alabama Plant
CEA 2080
1.12 Synopsis and Project "Tone"
The objectives of this project are to
a. Provide new facilities t<3 increase solid Arojclor plant capacity from 9.6 M lbs./year to 29.6 M lbs./year.
b. Provide an overall production capacity for solid Aroclors of up to 30/ more than indicated in the latest sales forecast.
c. Provide for an orderly expansion of the solid Aroclor facilities.
d. Complete these facilities by December, 1969.
New facilities to be added are:
1. Two batch chlorinator systems consisting of a single terphenyl feed tank, two chlorination tanks with heat removal systems and one inter mediate storage and blow tank.
2. An off-gas recovery system consisting of heat exchanger and surge tank to recover entrain ment lossss from both chlorinator systems.
3. One batch distillation system consisting of still pot, external circulating system through a gas-fired heater, condensing and receiving equipment, and a h.gh vacuum ejector.
4. Sufficient piping tie-ins to insure good oper ating flexibility with the existing batch
' system.
5. Expand the existing control room to provide
sufficient space for instrumentation for the
new facility.
._
6. Expand the existing Therminol heating system to provide proper distribution of hot fluid to the new facility.
7. Add drowning facilities at the HC1 plant to
drown the extra TIC 1 gas produced from the
chlorinators.
..-a
TOWOLDMONOQ48737
Page 2
.8 A new elevator in Building 27.
9. A flaker for Aroclor 1268.
Sales forecasts indicate that we will be out of solid Aroclor capacity in 1969. The plant is carrying out a debottlenecking program which will allow us to meet most of our 1969 requirements. The new facilities should be operational by December 1969 or earlier if possible. A preliminary schedule shows that if we can start definitive engineering in January, these new facilities will be available for start-up in December 1969.
Full design capacity will not be necessary until after 1973. It is divisional policy in certain product
groups to provide excess capacity over and above sales forecasts and we are providing a 3154 excess capacity in these new facilities for 1973 based on the sales forecast of December 6, 1968.
Low capital cost is important to this project, however,
schedules must be met for a December 1969 or earlier
start-up even at some increased capital cost. There
are no items that could be deferred from this project
to a later date.
-
It is estimated that the cost of these new facilities will be:
Capital Expense Total
$ 950,000 50,000
$1,000,000
0613170
TOWOLDMONOQ48738
Page 3
1,2 Process Technology
1.21 Process Description
1.211 Details r" Process
Aroclors are the reaction products formed by the "chlorination of biphenyl and/or terphenyls using an iron catalyst. The by-product HC1 gas pro duced is absorbed- in water to produce muriatic acid. Solid Aroclors are produced in chlorinaior reaction vessels, air blown and distilled. They are drummed, flaked, or flaked and milled and packaged for shipment.
Distillation residues are discarded as waste or sold as Montars.
Aroclors, when used as plasticizers and that crystallize at ambient temperatures are con
sidered solid Aroclors. Below is a list of the Aroclor grades that are considered solid Aroclors:
Aroclor
Starting
Dosiqnatfori Raw Material
Chlorination Level_____ Distilled
1268
Biphenyl
68%
Yes _
2 56 5
2 5% Santowax c
7 5% Biphenyl
6 5%
No
4065
40% Santowax R 60% Biphenyl
65%
NO
4465
40% Santowax R 60% Biphenyl
6 5%
Yes
5060
100% Santowax R
60%
No
5460
100% Santowax R
60%
Yes
5042
100% Santowax R
42%
No
5442
.100% Santowax R
42%
Yes
We intend to make only Santowax R based Aroclors in this new equipment.
1.212 Yields and Raw Material Usage
Yields are calculated for both chlorine and Santowax and/or Biphenyl. Based on cost standards of January 1, 1969 these are (% theory to standard) :
0613171
TOWOLDMONOQ48739
Page 4
Aroclor
On
On
On
On
Designation Chlorine Biphenyl vSantowax C Santowax 1
1268
73 73
2565
96 96.2 96.2
4465
73' 73 '
73
5060
96
96
" 5460
' 82
85
5442
80.2
73
The yield on 5460 has not been demonstrated. Last year the standard yield on chlorine and Santowax R was 73.5%
Lime and Ferric chloride are added to all products as follows:
Lime Ferric Chloride
Lbs./lOO Lbs. Aroclor 1.000 0.020
1.213 Process Documents
"Standard Manufacturing Process for Arocloirs
~'
Anniston Plant" September, 1966, M. J. Williams
"Standard Operating Instructions for Aroclors Anniston Plant" November, 1968, M. J. Williams
1.22 Raw Materalls
1.221 Specifications
Raw material specifications, as listed below, are appended.
. Material
Code
Date
Material
33500
2/26/57 Ferric Chloride Anhydride
83601
11/18/65 Biphenyl
82910
3/9/66
Santowax "C"
82602
3/2/66
Santowax "R"
82638
8/31/66 Chlorine Gas
38800
7/20/66 Lime Hydrate '
0613172
TOWOLDMONOQ48740
Page 5
1.222 Sources
Biphenyl
Biphenyl is stored in horizontal tanks in the Biphenyl Area and pumped on demand into the Terphenyl Mix Tank.
Ferric Chloride
Received from the warehouse in 100 lb. kegs.
Chlorine
Received from tank cars and the chlorine plant. In 1969 the chlorine plant will be shut down and the entire supply will be from 44, 55 or
90 ton tank cars shipped into the plant. Liquid chlorine will be vaporized and trans ferred as a gas to the department area.
Lime Hydrate
Received from the warehouse in 50 lb. bags loaded on palettes.
Santowax "C"
..
-.
Received from the continuous biphenyl stills on demand through a transfer line.
Santowax "R"
Received from a 50,000 gallon storage tank, heated west of the HB40 department, on demand, through a transfer line. Santowax "R" is ob tained from the continuous Santowax still in the Biphenyl refining area.
1.23 Products and By-Products
1.231 Quality Considerations
Aroclor 5460 has a color and softening point specification which because of the nature of the process gets out of control on occasion. Color is more of a problem than softening point.
1.232 Specifications
'
Finished goods specifications, as listed below, are appended.
0613173
TOWOLDMONOQ48741
Page 6
Product Code 82616 82618 82619 82620 82622 82621
Date 3/11/66 3/11/66 3/11/66 3/11/66 3/11/66 3/15/66
Product Aroclor 1268 Aroclor 2 56 5 Aroclor 4465 Aroclor 5060 Aroclor 5460 Aroclor 5442
By-Products
HC1 gas is a by-product of the chlorination re action and can be absorbed in water to produce muriatic acid or sewered and neutralized with limestone.
Residues from the distillation are drawn off to drums and sold as Montars or discarded. Listed below are data on the Montars.
Montar No.
Aroclor
Softening Point Range
Calcium Oxide
5 5460 6 4465 7 1268 8 5442
155-195C 135-190C
200 C
1.6% 2.0%
The plant is considering the flakering of Montars in order to change the product form.
Latest sales forecast, November 27, 1968, in dicates sales requirements for the solid Montars as follows for the year 1969:
Montar 5 Montar 5 crushed, Montar 5 crushed, Montar 6
180,000 dom. 400,000 inter . 80,000
50,000
lbs. lbs. lbs. lbs.
1.234 Packaging and Shipping
iterial .1268 2 505 446 5 5060 5460 5442
Container Weights
Weight - lbs. 200
50 and 500 50 and 500 50 and 100 50 and 100 50 and 450
Container
Form
41 gal. fibre drum
Flakes
5 and 40-g-nl. drums
Solid
5, 40 and 55 gal. drums; Solid
paper bags
Flakes
paper bags
Flakes
5 and 40 gal. drums
Solid
0613174
TOWOLDMONOQ48742
Page 7
1.24 Waste Streams
Approximately 2200 gallons of Montar 5 will be produced daily with an approximate composition as follows:
--
Chlorine Iron Calcium Oxide
57-59% 0.12% 1.6%
Some of this material is sold, the remainder is put in drums and taken to the toxic dump. The plant has a project to pump these waste materials to Cleghorn's lake, a sump used for residue disposal.
An additional 70,000 lbs. of HC1 gas will be produced daily from this new plant and will have to be absorbed and sewered at the acid plant. If additional absorption capacity is required, a separate project will be sub mitted .
1.25 Personnel, Property and Public Hazards
Chlorine Gas
Causes eye, skin and mucous membrane irritation. Maximum allowable concentration is 2 ppm. Concentra tions in the order of 15 ppm will cause throat irri tation. Cannister gas masks, Scott Air Paks or other similar equipment is required in strong concentra tions .
Biphenyl
A toxic organic chemical. Breathing fumes or vapors should be avoided. During processing the material is usually hot (100C or above) and can cause serious thermal burns in contact with the skin. Protective garments should be worn to aboid contact. Flash point of biphenyl is 235 F.
Ferric Chlori.de
Not toxic but presents an eye hazard. Normal pre cautions of wearing safety glasses should be followed.
HC1 Gas
Fumes are toxic and hazardous to teeth, skin, eyes and mucuous membranes. In strong concentrations, rubber protective equipment should be worn. Maximum allowable concentration of HC1 gas in air is 10 ppm.
0613175
TOWOLDMONOQ48743
Page 8 Santowax R
Relatively non-toxic, however, the vapors are irritat ing to the bronchial tract. Prolonged breathing of vapors should be avoided. Material is generally hot (150C or above) and can cause serious thermal burns _ in contact with the skin. Crude Aroclors Crude Aroclors are hot since all are handled in Therminol heated jacketed lines. They can cause serious thermal burns in contact with the skin. Still Bottoms or Residue Fumes from still bottoms are toxic. They are ex tremely irritating to the mucous membranes, eyes and respiratory tract and should be avoided. They are hot (above 150C) and can cause serious thermal burns. Hydrated Lime Dust is irritating to the eyes and skin and any material on the skin should be washed off with water.
061317b
TOWOLDMONOQ48744
Page 9
1..3 Manufacturing Facilities
1.3.1 Description
1.311 General
The following information is included in the Appendix of this report:
Equipment Information Summary Process Flow Diagram Equipment Arrangement Study Building and Site Requirement Description of Work by Code of Accounts Preliminary Schedule , Project Loss Prevention Report
,1.312 Manufacturing Facilities
A 2000 gallon mix tank for terphenyls with charge lines and supported on a 40,000 lb. hopper scale. Two 3100 gallon chlorination tanks with circulation pumps and heat removal systems consisting of two ' shell and tube heat exchangers and a Therminol surge tank and pump. An off-gas system consisting of heat exchanger and 2000 gallon storage tank to recover entrain ment losses from the chlorinator off gases with tailings pump. A 6500 gallon batch intermediate storage and blow tank with scrubber and transfer pump. A 7300 gallon still pot, 3500 gallon receiver with entrainment separator, still condenser and ex ternal gas fired heater with submerged centrifugal pump. A condenser control system consisting of two shell and tube heat exchangers and a Therminol surge tank and pump. A three-stage ejector with intercondenser, and aftercondenser and catch tank and sump tank. Additions to the present control room to provide space for additional instrumentation.. A two-stage HC1 gas drowning system. A new freight elevator for Building 27. Additions to the present Therminol system.
0613177
TOWOLDMON0048745
Page 10
1.32 Design Capacity
Chlorination:
Basis OST Hate
Producing Aroclor 5060. 6350 hrs./year 27.6 M lbs./year
Distillation:
Basis OST Rate
Producing Aroclor 5460 6350 hrs./year 20.0 M lbs./year
'
After these additions are complete, plant capacity will be as follows:
Present Capacity New Capacity Total Capacity
9.6 M lbs./year 20.0 M lbs./year 29.6 M lbs./year
Basis:
OST 6350 hrs./year OAY 73%
-
Based on the December 6, 1968 Sales Forecast, (HD to RY) , excess capacity will be as follows:
New Capacity Required Excess Capacity Excess Capacity
1970 29.6 M lbs./yr. 17.1 M lbs./yr. 12.5 M lbs./yr.
73 %
1973 29.6 M lbs./yr. 22.6 M lbs./yr.
7.0 M lbs./yr. 31 %
1.33 Flexibility Requirements
Two complete and separate solid Aroclor systems will allow flexibility in our production runs. We will pro duce the larger volume requirement, Aroclor 5460 (82%) in the new units with the remaining solid Aroclors being produced in the smaller unit. Consideration will be given to incorporating the chlorinators into a continuous chlorination system at some future date. Both units will have the flexibility of being able to produce any of the solid Aroclor products. If fractionation is required to meet FDA standards, a separate distillatio'n'unit can be added to the existing system.
0613^8
TOWOLDMONOQ48746
Page 10A
1.32 Design Capacity
,
As a supplement to the Design Capacity statements on Page 10, the following is added to show excess capacity of Aroclor 5460 only in the new facilities (based on the December 6, 1968, Sales Forecast, HD to RY):
1970
1973
New Capacity Required Excess capacity Excess Capacity
20.0M lbs./yr. 14.1M lbs./yr.
5.9M lbs./yr. 42%
20.0M lbs./yr. 18.5M lbs./yr.
1.5M lbs./yr. 8%
0613179
TOWOLDMON0048747
Page 11
1.34 Future Expansion
The present expansion will occupy an 18 foot wide area directly to the north of Building 27. There is suf ficient area .to the north of this expansion to provide for two additional chlorination-distillation systems. In the.meantime, work should proceed toward developing a continuous chlorination system which long range should provide greater flexibility in labor and equipment.
1.35 Physical Appearance
We propose to make the top roof deck concrete, a contin uation of the surface we installed to the west of Build ing 27 on project OEA 4-488. Additional weather protec tion will be provided in the form of a panel enclosure on the north wall of the structure.
1.36 Storage and Shipping Recfuirements
No additional storage facilities are contemplated. Re
cently completed project CEA 1430 provided a 5500 gallon
day tank for finished solid Aroclors. In addition, a
new 6900 lb./hr. flaker with a 5500 gallon flaker feed
tank has also been installed in a separate flaking and
packaging building.
._
Raw material storage for Santowax R and Biphenyl are adequate.
0613180
TOWOLDMONOQ48748
Page 12
.4 Utilities and Services 1.41 Utilities Summary The approximate utility requirements are as follows:
' For ejector, lbs./hr.
450
For tracer and tank heating, lbs./hr. 250
Power, Installed HP
245
Cooling Tower Water, GPM
600
Potable Water, GPM
.
50
Natural Gas, Cu.Ft./hr.
2000
1.42 Utilities Facilities
No additional utility facilities are required for this project.
0613181
TOWOLDMONOQ48749
Monsanto
I MOM iNAMt ft LOCATION)
General Offices - St. Louis
OAT ' January 24, 1969
RU0JCCT tLNCt
Project Loss Prevention Report 69-7 CEA 2080
TO : Mr. R. S. Yates
cc R. E. Howard G. 0. Hunt P. K. Ward - Anniston S&PP Project File S&PP Location File
COPIES TO THOSE PRESENT
R. J. Green W. B. Howard R. M. Kountz W. E. Voss - Anniston R. S. Yates
DATE AND PLACE OF MEETING Missouri.
January 23, 1969, Creve Coeur,
CEA 2080 Alabama.
Expand Solid Arochlors, Anniston Plant, Anniston,
This project is increasing the plant: capacity for manufacture of solid arochlors from 9.6 to 29.6M ppy. The project capital is approximately $1.03M. Completion target is December 15, 1969.
PERSONNEL
1. Chlorinated Biphenyl Content of Product
An overall
project objective is to minimize chlorinated biphenyl
content in the solid arochlor 5460. This is needed for
FDA approval of the material, since it is used in hot-
melt adhesives in food packaging. It is also used in
plasticizers.
2. Elevator
It is planned to install an elevator to
handle both freight and passengers. The elevator will
have the capacity for 5000 pounds and will likely be
hydraulically operated. It was agreed that the project
manager will review the elevator design and safety con
trols with Mr. George Gorbell.
--
Lime Addition
Lime is added to the still pot from
50 pound bags. This size bag is considered safe for
personnel handling.
4WiT/V.!
0613182
TOWOLDMONOQ48750
R. S. Yates
2 January 24, 1969
MECHANICAL
An external gas-fired heater is used for the
still pot. Combustion safeguards are planned by the project;
these will include a Honeywell protecto-glow unit. There will
also be a pilot- interlock. - The combustion safeguards should
be reviewed with Mr. George Ostroot when the heater design is
further along.
.
In addition, some process safety provisions will be incorporated in the heater. A high temperature sensing unit on the process material coming out of the furnace will shut down the burner on high temperature. If the circulation through the heater stops, an alarm will sound. Standard instrumentation will be employed for these functions.
PROCESS1
1. Alarms and Interlocks
The operation of the chlorinators
will be sequence controlled. Chlorination starts at a
temperature of about 150C. As the batch progresses the
sequence controller steps, the temperature upward so that,
at the conclusion of chlorination of a batch, the tempera
ture is in the range of 250-255C. The temperature will _
be recorded in the chlorinator; an alarm will be actuated
at high temperature. It was agreed that the project will
consider use of a differential temperature alarm, based
on the desired temperature at any stage of the batch, rather
than a high temperature a'larm which must function at a
temperature higher than the maximum batch temperature. It
was believed that this type of alarming would be a better
investment of money than the addition of a second high
temperature alarm on the reactor, and located in the vapor
discharge from the reactor.
There will also be temperature detection in the arochlor
circulating line on the chlorinator. A high temperature
in this line will give an alarm and will also close the
chlorine supply valve. The complete closure of the
chlorine supply valve will not be possible because chlorine
will come from tank cars rather than from the chlorine
unit.
,
If flow should cease in the arochlor circulating line
there will be an alarm and the chlorine valve will be
closed.
.
There will also be an alarm if the therminol circulation ' should stop.
n
0613183
TOWOLDMONOQ48751
R. S. Yates
3 January 24, 1969
Other alarms include the following: a scale alarm to prevent overcharge of the weigh tank; a low temperature alarm on the chlorinator at 120C; water coolant to the therminol cooler to prevent too low a water temperature; a signal when the batch is 00% chlorinated in order to signal the time to initiate sampling; high (80C) and low (60c) temperature on the circulating therminol. The project is also considering installation of a nuclear instrument on the process circulating line at the chlorinator to determine density; it is hoped that this density figure can be correlated with softening point. If the correlation works out on a present plant test, the equipment will be installed.
2. Operating Time
The operating time of the present unit
is only about 74%. Downtime on a chlorine plant has been
a part of the problem; the new purchased chlorine arrange
ment should help this. Another part of the problem has
been maintenance. It is also hoped that this can be im
proved in order to improve the on-stream factor.
3. IICl Scrubber
In order to minimize the HCl venting to
the atmosphere the project will add equipment for improved
HCl absorption and scrubbing.
4. Gas Fired Heater Operation
The firing rate on the heater
is manually indexed on a flow controller on the gas to the
burner. This type of control has proved adequate with the
present plant installation and is believed to be adequate
for the new heater. The project will also try to design
the heater coils in such a manner as to simplify coil re
moval for the furnace. The furnace coils can be expected
to burn out approximately annually. This is considered a
normal maintenance item and presents no major problems.
5. Residue Removal
If the residue is removed from the
system in the manner used at present, the fume hood venting
provisions will be improved over those at present. The
project also plans to try to develop a system for flaking
the residue.
BUILDING AND FIRE PROTECTION
An 18' x 901 x 2 level bay
will be erected adjacent to the north wall of Building No. 27.
The construction will be open steel frame with reinforced fiber
glass polyester wind-breaks, concrete slab roof and steel grate
flooring at the first level above ground level. . ,
Hydrant #13 with hose house and hydrant #19 with attached monitor nozzle are adequate fire protection. No sprinklers or fire proofing are needed.
0613184
TOWOLDMONOQ48752
R, S. Yates
4 January 24, 1969
A 20' x 30' extension to the existing control room will be
erected at the 16 ft. level. The construction will be con
crete block walls and non-combustible roof. No fire protection
is needed.
.
LOSS EXPOSURE
The maximum probable loss was considered to
come from loss of the heater for the still pot as a result of
explosion in the fire box. It was considered that approximately
six days will be required to re-brick and repair the heater. A
spare coil will be kept in stock.
It was estimated that the repairs would cost about $10M. Six days were estimated to be sufficient for the repairs. The business interruption loss during this period of time would be approximately $45M.
LOSS PREVENT I ON REVIEW CHECK LIST
Attached to R. S. Yates'
copy of this report is a copy of Form G-1425, Loss Prevention
Review Check List, which can be used as a safety check list
for this project.
LOSS PREVENTION REVIEW BY PLANT
The S&PP Branch of CED can
not review design prints and" construction steps in detail as
this project progresses. S&PP requests plant personnel, in
cluding plant safety personnel, to hold additional safety
reviews at the plant, to follow the development of design
prints, and to check the progress of construction in order to
make maximum contributions from their experience with these
operations to the CEO personnel involved in execution of this
project.
SAFETY MANAGER
G. O. Hunt will be Safety Manager for this
project. Please contact him for additional safety reviews
needed during design.
.i
t.
R. j. Green
'
bjr Attachment
'./'
' / .
( . . / a
/ -v
W. B. Howard .-
/
:'
0613185
TOWOLDMONOQ48753
"3^
>
B IB
#
nasi be F5T1 ?nS?
i
tsa ._ i_.
SHOUMP LtYti- (ei.*4^.fl`)
iTrlYtinf^ *rw
<.|Q
CgA-iOe Sc*-t l-=(0,--' s^ **y rWf 1 S*.
Hf-m*
0613186
TOWOLDMONOQ48754
'$
gauipHevr wmtmvr stub?
iuo
Ryrof-n^
UA-Ulg
"ioW
H t1 r I'l.t-H ri -
<U4-1 ^a.
0613137
TOWOLDMONOQ48755
'i TOWOLDMONOQ48756
6*rest Oftax/r/Amt. Creuf
77*je -rtc OSO
zeeo * 3eoo
<>
</k">
/.OO
/oo 900 a-so
/e-&c>0*3
&trzt/ $rnj- rij Crti \Axe-/rXa
Tmtxfnu (a?> oso
zfc*r u? Conti. Gtrrr
(/^>
2-00 G-SO /OO
7ort-
/2-OOWiS
0613169
TOWOLDMONOQ48757
1 TOWOLDMONOQ48758
PROCESS DESCRIPTION SOLID AROCLOR MANUFACTURING FACILITIES
PROJECT CEA 2080
T ABLE
0F
C0
Section I
- Synopsis of Aroclor processes
Page No. 1
Section II
- Terphenyl Feed Tank
3
Section III - Chlorinators No. 10 and No. 11
5
Section IV
- Intermediate Storage and Blow Tank
11
Section V
- Off-Gas Purification
13
Section VI
- Distillation
16
Section VII - Still Heater
23
Section VIII _ Therminol System
25
0613191
TOWOLDMONOQ48759
Project Manual Sections 2.11 Dates December 29, 1969 Bys R. S. Yates Page s 1
Section I - Synopsis of Aroclor Process
Aroclor is a tradename used to designate the chlorination products of biphenyl, biphenyl high boilers or a mixture of the two. Solid Aroclors are produced by chlorinating the biphenyl or Santowax R to a high level of chlorine content. The process here described is for the Solid Aroclor system using Santowax R or a mixture of biphenyl high boilers as the starting material. They are identi fied by a four digit number. The last two digits represent the chlorine content (percentage by weight) and the first two numbers represent the chlorine condition. If the first digit is "5," it signifies that the Aroclor has been made from Santowax R. If the second digit is "0," the product has not been distilled. If it is "4," the product is a distilled grade. As an example, Aroclor 5460 is a distilled chlorinated terphenyl containing 60% chlorine.
The first process step in the manufacture of Solid Aroclors is a chlorination step. Santowax R and chlorine gas in the presence of ferric chloride catalyst react to form a chlorinated aromatic compound. Hydrogen chloride gas is liberated during the reaction and either recovered or drowned in a scrubber and sewered. The main reaction is a simple replacement of hydrogen by chlorine, but the product of the chlorination contains trace amounts of halogen containing by-products which are less stable than the direct ring-substituted products. Many isomers are formed. A schematic representation of Santowax R chlorination is as follows:
+ 10 cl.2
Terphenyl
Chlorine
10 Cl
Aroclor 5460 Hydrogen Chloride
Molecular Heights: Terphenyl
230.3
Chlorine
= 70.9
Aroclor 5460
= 574.8
Hydrogen chloride = 36.5
0613192
TOWOLDMONOQ48760
page 2 The second process step is aeration. The material is held at a high temperature, 200C, and then blown with dry air in an aera tion tank to remove trace amounts of HCl gas and other gaseous impurities. The third process step is a flash distillation. This is carried out under vacuum conditions at an absolute pressure of 5-10 mm , at the still pot and a temperature of 260-360C. Heat for the distillation is supplied by an external source. The distilla tion must be carried out in the presence of lime. The residue product, which contains lime, ferric chloride, and tars, is generally drawn off to drums for discard or for sale as Montar. The fourth process step is flaking. The distilled Aroclor is flaked on a drum flaker and the flakes bagged or placed in fiber drums for shipment to our customers.
0613193
TOWOLDMONOQ48761
page 3
Section II - Terphenyl Feeff Tank
A. Routine Operation
1. Design Consideration
a. FeCl3 is mixed with Santowax R in an agitated tank. Minimum catalyst concentration is 0.13% by weight or 15 lbs/charge.
b. To provide the correct charge to the chlorinator, the tank is set on a hopper scale.
2. Terphenyl Feed Tank Operation
a. Check that steam is on the coil in the tank and the temperature controller is operational. Set at 150C in automatic.
b. Close valve under feed tank.
c. Set scale pointer to 11,200 lbs and start Santowax R charge pump. At this weight, the charge valve will shut off and an alarm will sound. The charge valve will not open if the transfer pump is operating.
d. Start agitator.
e. Add 15 pounds of ferric chloride.
f. Charge to chlorinator is made on demand. When tank is empty, pump will stop and an alarm will sound.
B. Safety Features
1. A temperature controller controls the temperature in the tank by throttling a steam control valve. This will prevent the tank from overheating.
2. The charge valve to the tank cannot be opened when the
transfer pump is running. The pump cannot be started if the charge valve is open.
3. if the weight in the tank reaches the first set point, the Santowax R charge valve will close and an alarm will sound. If the weight exceeds the normal charge, a switch on the scale set at 12,000 lbs will shut the Santowax R charge valve and sound an alarm.
4. A steam jacketed vent with flame arrestor is installed
on the tank.
--
c
0613194
TOWOLDMONOQ48762
page 4
C. Emergency shutdown 1. Shut off steam to steam coil.
2. Shut down agitator.
D. Control Loops. Interlocks and Alarms
1. There are two major control loops in this system.
a. Terphenyl Feed Tank Temperature Control - TIC-101
The function of this loop is to provide temperature control for the Santowax R in the mix tank. This is accomplished by measuring the Santowax R temper ature and controlling the steam supply to the coil through a control valve. Set point is 150C.
b. Terphenyl Feed Tank Weight Control - WV-101
The function of this loop is to permit a fixed charge of Santowax R to pass through a charge valve into the feed tank. As soon as the correct weight is attained, the valve will close and an alarm will sound.
2. Interlocks
a. If the feed tank overfills, a second cutoff on the scale will sound an alarm and attempt to close the charge valve.
b. When the feed tank is empty, the charge pump to the chlorinator will stop and an alarm will sound.
c. When the chlorinator charge pump is operating, the charge valve cannot be opened. Likewise, when the charge valve is open, the chlorinator charge pump cannot be started.
3. Alarms
The following alarms exist through the system:
a. Correct charge in the mix tank.
b. An overcharge in the mix tank.
c. When the mix tank is empty and the chlorinator charge pump stops.
r
0613X95
TOWOLDMONOQ48763
Page 5
Section III - Chlorinators No. 10 and No. 11
A. Routine Operations
1. Design Considerations
a. Based on the demonstrated Solid Aroclor chlorinator system at Anniston, The chlorinator was designed 1) at the same apparent vapor velocity of the_No. 9 chlorinator unit at a demonstrated rate of 10M lbs/yr and 2) the material level at least equal to the level
in No. 9 chlorinator.
b. Allowance was made for a volume expansion of 50% with a minimum of 36 inches for vapor disengaging at the end of the chlorination.
c. The heat removal system is based on a heat evolution of 510 BTU/hour/pound of chlorine added. Normal evolution at the input rate of 3M pounds/hour of chlorine is 1,530m BTU/hour. With a radiation and convection loss of 735M BTU/hour, the net heat evolu tion is 795M BTU/hour. Design rating of the external Therminol heat exchangers is 1.400M BTU/hour. This external heat removal system is similar to the system on No. 9 chlorinator which has worked successfully for the past 5 years.
d. The flow of chlorine to the chlorinator is controlled by a flow controller which allows manual adjustment of chlorine feed rate with automatic control by means of a batch sequence controller. This allows the batch to be controlled as follows:
1) Three feed levels of chlorine input.
2) Eight time periods for the regulation of batch temperatures since the batch temperature has to be increased during the chlorination period to prevent high pumping viscosities. The batch temperature will vary between a beginning tem perature of 160C to an ending temperature of 250C.
e. The system is designed so that hot Aroclor can be put on the following items:
1) Circulating lines at the chlocinator.
2) Chlorinator coolers.
'
Normally, hot Aroclor will be kept on the circulat ing lines at the chlorinators to prevent blockages.
obm'Jb
TOWOLDMONOQ48764
Page 6
f. Entrainment separators are installed at the top of each chlorinator to prevent Aroclor from being lost from the chlorinator. The Brinks-Monsanto unit will eliminate 99% of all particles 3 microns and smaller from the vapor stream and return the entrained liquid to the chlorinator.
g. Chlorine sparger design is based on a chlorine veloc ity of 50 feet per second, a chlorine rate of 3,000 pounds per hour with 3/16 inch hole size.
2. Chlorinator Operation
a. Check that the 2 inch chlorine valves on the header at the chlorine distributor are closed.
b. Align vent valves to the muriatic acid area.
c. Check that hot Aroclor is on the transfer line from the terphenyl charge tank and that steam is on the tracer around the transfer pump.
d. Check that the external Aroclor system is operating in the normal manner. Water should be going into the Aroclor coolers (Item 116, or Item 123). Pumps (Item 115 or 122) should be circulating Therminol through the chlorinator coolers (Item 106 or 119).
e. The control system should be set for the desired chlorinator program. For Aroclor 5060, settings should be:
1) For chlorine input. flow recorder controller:
First Hour
Second Hour Third Hour Subsequent Hours
1,500 lbs/hour 2.000 lbs/hour 3.000 lbs/hour 3,000 lbs/hour
Note: This is based on 100% available chlorine.
2) For temperature control, temperature recorder controller:
First Hour Second Hour Third Hour Fourth Hour Fifth Hour Sixth and Seventh Hours Eighth and Nineth Hours Tenth and Eleventh Hours
190C 200C 21C 220C 230C 240C 250C 255C
r
0613197
TOWOLDMONOQ48765
Page 7
f. Set the chlorine integrator for 80% of the calculated input, which is 24,400 pounds. By setting the inte grator to 80% of the calculated flow, an alarm will sound giving the operator a signal when the batch is 80% chlorinated. The chlorine integrator will con tinue to totalize the flow of chlorine into the chlorinator until the batch is complete.
g. Align valves from terphenyl feed tank to chlorinator and transfer Santowax to chlorinator.
h. Set selector switch of the temperature controller (TRCA 106-1 or TRCA 119-1) to automatic position with set point at 190C.
i. Align chlorinator valves and circulate mass through external cooler.
j. Align chlorinator valves in chlorine line to chlorina tor and set flow controller (FRC 104-1 or FRC 117-1) to the manual position. Set flow controller to 1,500 pounds/hour. Open chlorine valves at the inlet to the sparge pipe.
k. When the chlorine feed stabilizes at 1,500 pounds per hour, put flow controllers in automatic with set point at 1,500 pounds/hour.
Note; Chlorine control valve should be open before the manual valves are opened.
l. Take softening point measurements at regular inter vals during the chlorination. As soon as the batch reaches the finished softening point, then:
1) Shut off the chlorine hand valves.
2) Set temperature recorder to manual. Leave set point at 255C until batch is transferred, then reset to 190C.
3) Align valves for transfer to the blow tank.
m. A density recorder is provided in the chlorinator circulating line to record the de isity of the crude product. Density correlates with the soften ing point of the crude Aroclors.
B. Safety Features
1. A high temperature alarm is set at 275C on the individual chlorinators to prevent excessive carryove-r-of material into the HCl off-gas header. Temperatures above this will cause excessive carryover of Santowax R or crude solid Aroclor.
0613198
TOWOLDMONOQ48766
Page 8
2. A low temperature alarm is set at 120C on the individual chlorinators to prevent a too low starting temperature for the process.
3. If the chlorinator temperature gets too high, a high temperature switch will cut off the flow of chlorine to the chlorinator. Likewise, if the circulating pump into the chlorinator coolers shuts down, the chlorine flow into the chlorinators will be cut off.
4. The circulating loop through the chlorinator coolers contain the control system for removing heat of reaction. These units (TRCA 106-1 or TRCA 119-1) will sound an alarm if the temperature in the circulating loop is 120C or 275C.
5. The circulating Therminol loop through the water Therminol exchangers contains flow controllers (FICA 115-1 or FICA 122-1) which control the flow of Therminol to the water Therminol exchangers. In the event the flow stops, an alarm will sound. Normal flow of Therminol is 250 gallons per minute. A temperature control system on the water Therminol exchangers will control the output temperature of the Therminol coming back to the chlorinator coolers. High temperature for the Therminol leaving the water Therminol exchanger is 90C. Low temperature for Therminol leaving the water heat exchanger is 50C.
6. Rupture discs are installed on each chlorinator to pro tect against over-pressurization, but not failures which may result from explosions. Set pressures for the rup ture discs are 50 psig.
C. Emergency Shutdown
1. Close block valves to the chlorine distributor to the chlorinators. Reset chlorine feed control valves to zero with instrument in manual.
2. In the event of a prolonged shutdown, greater than 2 hours, the batch should be circulated through the chlorinator cooler and Therminol put on the Therminol cooler in order to maintain a minimum batch temperature of 150C.
D. Control Loops, Interlocks and Alarms
1. There are five major control loops in this system.
0613199
TOWOLDMONOQ48767
Page 9
a. Density Recorder, DR-104-4, 117-4
The function of this loop is to provide an estimate of what the softening point of the distilled product will be. A correlation exists between density and . softening point which may eliminate the time-consuming softening point determination.
b. Chlorinator Flow Control and Totalizer. FRC-104-1, FQS-104-2, FRC-117-1, FOS-lP^I
The function of this loop is to control the chlorine flow to the chlorinators and regulate the rate of chlorination. This is done by measuring the chlorine flow with an orifice and controlling this flow with a control valve in the chlorine feed line. This system can be operated manually or automatically. The flow of chlorine is altered in three steps, 1,500 lbs/hour for the first hour, 2,000 lbs/hour for the second hour, and 3,000 lbs/hour for each of nine subsequent hours. The integrator readout is total pounds of chlorine. This instrument has two dials, one is set at 80% of total batch poundage of chlorine and figures are not affected by increas ing figures on the second dial which indicates the total flow. When the integrated flow equals the pre-set flow (80% of total), an alarm rings in the control room. Totalizing continues until chlorine flow stops. A reset button on the integrator returns the integrated flow dial to zero. The chlorinator circulating pump must be running and normal tempera ture must exist in the chlorinator before the flow control valves can be opened. A high chlorinator temperature, 275C, or circulating pump shutdown automatically stops the flow of chlorine.
c. Chlorinator Temperature Control - TRCA-106-1. TRCA119-1
The function of this loop is to provide temperature control for the batch in the chlorinator. This is done by measuring the temperature of the crude Aroolor in the circulation line a: the discharge of the Thexminol heat exchanger aid controlling the flo'f of cool Therminol to the heat exchanger. The temperature system has a low temperature alarm at 120C, a high temperature alarm at 275C. Chlorina tion temperature is controlled through a series of discreet time dependent steps. This is accomplished through a controller mounted on the pane.l board and pre-set with the control conditions.
0613200
TOWOLDMONOQ48768
Page 10
d. Therminol Plow to Chlorinator Cooler, FICA-115-1, FICA-122-1
The function of this loop is to control Therminol flow to the Therminol coolers. This is done by measuring flow with an orifice plate and splitting the flow into two streams. One stream is modulated by a temperature control valve. The other stream contains the flow control valve, which is modulated
by a control signal from the temperature controller and carries the difference in flow between set point and fresh stream. In this way, the total flow
always continues through the Therminol water heat exchanger. If the flow is too small, an alarm will sound. Set point is 250 gpm. Normal flow is 300 gpm.
e. Therminol Temperature Control. TICA-116-1, TICA123-1
The function of this loop is to control the temper ature of Therminol leaving the water-Therminol heat exchangers. This is done by measuring the tempera ture out of the cooler and controlling the flow of tower water with a control valve in the tower water line to the heat exchanger. An alarm will sound if
the temperature in this line is 90c or 50C.
2. Interlocks
a. If the temperature in the chlorinator at the sparge ring reaches 260C, the chlorine control valve will close and an alarm will sound.
b. if the chlorinator circulating pump motor shuts off, the chlorine control valve will close and am alarm will sound.
3. 3. Alarms
The following alarms exist through the system:
a. High temperature at the chlorine sparge ring, 275c.
b. High temperature in the chlorination circulation mass, 275C.
c. Low temperature in the chlorination circulation mass, 120C.
d. Low flow of Therminol through the chid ripator-cooler
and water-Therminol heat exchanger, 250 gallons per
minute.
--
e. High outlet Therminol temperature from waterTherminol heat exchanger, 90C.
f. Low temperature of Therminol out of water-Therminol heat exchanger, 50 C.
0613201
TOWOLDMONOQ48769
page XI
Section IV - Intermediate Storage and Blow Tank
A. Routine Operations
1. Design Considerations
a. The blow tank is designed to accommodate two batches from the chlorinator. This amounts to 4,320 gallons. A free board of 2,166 gallons has been allowed.
b. The tank is equipped with an air sparger system so that trace amounts of hydrogen chloride can be removed before a charge is made to the still system. The amount of air that will be blown through the batch is 300 pounds.
c. A sparger pipe is in the tank to distribute the air through the batch. It is designed for a rate of 50 ft per second through the sparge holes.
2. Blowing Tank Operation
a. Check that hot Therminol is on the plate coils of the blow tank. Normally, once this is energized,
it will remain energized. Temperature is set at 240C.
b. Check that hot Therminol is on the transfer line from the chlorinator transfer pump to the blowing tank.
c. Align valves in transfer line from Chlorinator No. 10 or No. 11 circulating pump to blowing tank.
d. Energize scrubber system for blowing tank by open ing water valve at the s&K eductor.
e. Check that vilve at bottom of blow tank is closed. Transfer batch from chlorinator to blowing tank.
f. As soon as the batch is transferred, realign valves at the chlorinator and shut down the transfer pump.
g. Start air blower and open valve into the blowing tank sparger. Sparge for 60 minutes.
B. Safety Features
1. A rupture disc is installed on the blowing tank to
protect against over-pressurization. Set pressure for
the rupture disc is 50 psiq.
.,
0613202
TOWOLDMONOQ48770
page 12
2. The blowing tank has a level indicator to show the level of material in the tank. An alarm will sound when the
level reaches 90%.
C. Emergency Shutdown
,
1. Shut down the blow tank air pump and the hot Therminol input to the heating coils.
D. Control Loops, Interlocks and Alarms
1. There are two major control loops in this system.
a. Blowing Tank Level Indicator - LIA-125-2
The function of this loop is to indicate the blow tank level in the control room and in the field. It also alarms on high level. This is done by dip tubes which extend into the tank. These tubes are purged with air and the differential pressure, sensed by a d/p cell, is transmitted to a locally mounted and panel mounted receiver gauge graduated 0 to 100%. A high level will sound on the annunciator cabinet when the level is 90%.
b. Blowing Tank Temperature Control - TIC-125-1
The function of this loop is to control the tempertture of crude Aroclor 5060 in the blowing tank during the tank filling, pump-out and hold periods. This is done by measuring the tempera ture of the batch in the tank and controlling the flow of Therminol into the plate coils on the tank through a control valve. Set point is 240C.
2. Interlocks
a. An interlock exists between the blowing tank
transfer pump and the still pot. If the level in the still pot reaches a higher than normal level, a swtich in a level device at the still pot will prevent the transfer pump from starting.
3. Alarms The following alarm exists in the system: a. High level in the blowing tank, 90% full.
0613203
TOWOLDMONOQ48771
Page 13
Section V - Off-Gas purification
A. Routine Operation
1. Design considerations
a. HCl gas from Chlorinators No. 10 and No. 11 gill be cooled from 225C to a temperature of 130 c in a gas cooler. Entrained Santowax and Aroclor, condensed by the gas cooler, will be stored in an off-gas storage tank. The cooled gas will pass into the transfer line to the HCl purification plant.
b. HCl gas can be vented through the blow tank into the local scrubbing system.
c. It is expected that the tank will be pumped empty at approximate five-day intervals.
2. Off-Gas Storage Tank Operation
a. check that steam is one the plate coil of the storage tank and the temperature controller is operational. Set at 130c in automatic.
b. Close valve under tank.
c. Align valves to circulate Therminol through air cooler, off-gas condenser, and return to surge tank.
d. Set the Therminol controller in automatic with set point at 130_C.
e. Start the Therminol circulation pump.
f. Align valves to direct HCl gas from the chlorinators into the off-gas condenser.
g. Align valves to direct HCl gas to the HCl depart ment .
h. Check level in the off-gas storage tank. The material can be pumped to the existing terphenyl charge tank by aligning valves and starting pump. The tank will hold 2,000 gallons of material.
B. Safety Features
1. A temperature controller is located at the' tank to control the temperature in the tank and .prevent the tank from overheating.
061320i
TOWOLDMONOQ48772
Page 14
2. A level instrument is located at the tank to indicate level of material in the tank.
3. A rupture disc, with a bursting pressure of 50 psig, is located on the off-gas storage tank.
C. Emergency Shutdown
1. Close the chlorine valves to the chlorinators. This will prevent HCl gas from entering the off-gas conden ser.
2. Shut down temperature control system.
D. Control Loops. Interlocks and Alarms
1. There are three major control loops in this system.
a. Off-Gas Storage Level Indication, LI-109-2
The function of this loop is to provide an indica tion of level of material in the off-gas storage tank. This is done by dip tubes which extend into the tank. One tube senses tank internal pressure, the other extends to the bottom of the tank. The dip tubes are purged with air, and the differential pressure is sensed by a d/p cell. The signal is transmitted to a locally mounted receiver gauge graduated 0 to 100% which indicates tank level in the field.
b. Off-Gas Storage Tank Temperature Control - TIC-109-1
The function of this loop is to provide temperature control for the material in the off-gas storage tank. This is done by measuring the temperature and controlling the heat input by throttling a control valve in the steam line to the plate coils on the storage tank. Set point for controller is 130C.
c. Off-Gas Condenser Temperature Control - TIC-111-1
The function of this loop is to :ontrol the temper ature of the circulating Therminol to the off-gas condenser. This is done by measuring the Therminol temperature in the surge tank and transmitting a signal to a controller in the control room. The controller compares this signal with the set point and transmits a control signal to each of two positioners. One positioner is mounted on an air cooled heat exchanger and operates louvers, the second positioner operates a steam control valve in a steam line to heating coils of the sugue tank. Set point for the controller is 130
0613205
TOWOLDMONOQ48773
page lb 2. interlocks
There are no interlocks in this system. 3. Alarms
There is a low flow alarm which is activated if the Therminol circulation pump motor stops.
r
0613206
TOWOLDMONOQ48774
Page 16
Section VI - Distillation
A. Routine Operations
1. Design Considerations
a. Time cycle:
Charge Heat-up Distill Empty
Total
0.5 hours 3.0 hours 7.5 hours 1.0 hours
12.0 hours
Distilling Rate
5,050 lbs/hour
Capacity for Aroclor 5460
5,050 lbs/hour x 7.5 hours/ba x 8,750 hours x 72.5% divided by 12.0 hours = 20K lbs/year
b. The charge to the still pot is 4,180 gallons. The still pot has a capacity of 6,550 gallons, which leaves a free board of 2,370 gallons or 38 inches.
c. Heat for distilling is provided by an external gasfired heater. Calculated loading for the external
still heater is:
Heat-up Vaporize
1.4M/BTU/hour 1.IH/BTU/hour
The design absorption rating of the heater is 2.0H/BTU/hour. The batch will circulate through the heater coil at 250 gpm.
d. The distillation rate is controlled by a flow controller mounted on a panel board and controlling the gas flow to the heater.
e. The calculated vapor load for the still vapor con denser is 5,050 lbs/hour. The design loading is 5,560 lbs/hour. The heat balance for the condenser
is :
Condense Cool Total
556,000 BTU/hour 695,000 BTU/hour 1,251,000 BTU/hpur
Th^ condenser was designed for a gas flow velocity of 159 feet per second, which is less than 50% of tne critical velocity of 348 feet per second.
0613207
TOWOLDMONOQ48775
Page 17
f. Heat removal from the condenser is accomplished by circulating Therminol through the shell side of the condenser and cooling the Therminol in a waterTherminol exchanger.
g. two batches will be distilled through the still system before Montar or residue is withdrawn from the still pot. Lime will be added to the still pot before each distillation.
h. The still receiver is designed to hold 4,100 gallons of finished material at a gravity of 1.5 at 200C. This represents a yield of 98% on the still charge.
i. During distillation, the material in the still pot decomposes and HCl gas is formed. The ejector system is designed to handle an HCl gas load.
2. Still Operation
a. Align valves to charge from blowing tank.
b. Start blowing tank pump and charge 4,180 gallons into the still pot. This will leave 38 inches of
free board for disengaging height. A high level cutoff is on the still and will shut off the trans fer pump.
c. Add 400 lbs of lime directly to the still pot. Close still and still receiver.
d. Energize the steam ejector.
1) Close main valve in vacuum line to still above receiver.
2) Start steam to fourth stage. Start water into , second barometric condenser.
3) Start steam to third stage and readjust water flow to second barometric condenser.
4) Start water into first barometric condenser. Start steam to second stage and readjust water into first barometric condenser.
5) Start steam to first stage.
6) Open water valve to the after-condenser and adjust to a point where no steam is escaping from the after-condenser vent.
'
r
7) vacuum should pull down steadily.to about 1 mm mercury absolute and hold steady.
0613208
TOWOLDMONOQ48776
Page 18
e. Align valves at still receiver from ejector to con denser.
f. Energize the Therminol circulating system to the condenser.
1) Align valves to circulate Therminol through the still condenser and water-Therminol exchanger and return.
2) Set TRC-131-1 at a temperature of 150C.
3) Start the Therminol circulating pump.
g. Align valves in still pump line to circulate through external gas-fired heater and back into the still. Start pump.
h. Increase the flow of gas to the external gas-fired heater by adjusting the flow controller, FRCA-128-1. This is the control over the rate of distillation and also the heat-up rate of the batch.
When the still is under proper operating conditions, the following data can be expected:
1) Proper operating temperatures for Aroclor 5460:
Begin Distilling
End Distilling
Temperature Profile Through Heater
At Beginning
Into Coil Out of Coil
200C 212C
At End
Into Coil Out of Coil
388C 400 C
2) Vacuum 5 mm mercury absolute at the still pot.
3) Distilling rate 5,560 lbs/hour.
4) Still condenser. Forward flow temperature at 155C.
5) Still pump. Output pressure at 65.psig and flow at 250 gpm.
r
0613209
TOWOLDMONOQ48777
Page 19
j. As the distillation continues, the temperature in
the still pot will rise and flow through the heater coil will remain steady. When the flow drops to 125 gallons per minute, an alarm will sound. This should be the time to cut the gas flow to the heater. As an additional aid, a cutoff switch will stop the flow of material through the coil when the level in the still pot reaches the bottom dish.
k. At the end of the distillation, the batch is checked for color and softening point and is transferred to the flaker hold tank. Check that space is avail able in the flaker hold tank before transfer is made.
l. Clear heater coil by opening vent valve in line at still pot and allowing vacuum to suck coil dry. The jet should be isolated from the still receiver when this is done.
B. Safety Features
1. A low flow through the external heater coil will activate an alarm.
2. A low gas flow to the external heater will sound an alarm.
3. If the level in the still pot is too high, the transfer pump from the blowing tank will not operate.
4. A rupture disc, with a bursting pressure of 50 psig, is installed on the still pot and on the receiver.
5. If the temperature in the still pot gets too high or too low, an alarm will sound.
6. A site glass has been placed in the return leg from the cyclone. Some flow is necessary for satisfactory operation.
C. Emergency Shutdown
1. Shut off feed to the still pot.
2. Shut off gas flow to the external heater.
3. Shut off still pot circulating pump and drain coil through heater.
4. Release vacuum by closing the block valve to the jet
and venting the receiver or still pot.
.
D. control Loops, Interlocks and Alarms
--
There are nine major control loops in tht still pot system.
0613*10
TOWOLDMONOQ48778
page 20
a. Fuel Gas Flow to Still No. 5 Heater - FRCA-128-1
The function of this loop is to control the flow of fuel gas to the heater. This is done by measuring the gas flow with an orifice and controlling this flow with a control valve in the gas feed line.
b. Low Flow Still No. 5 Heater. Alarm and Shutdown FIA-128-2
The function of this loop is to measure the circulating flow through the still heater coil and to shutdown the heater if the flow becomes too low. This is done with a target meter in the transfer line to the still heater. If the flow decreases below a previous set point, an alarm will sound and the main burner will shut down. The low flow alarm switch is set at 125 qpm.
c. Still No. 5 Heater Control BCA-128-9
The function of this loop is to provide a safe start-up and shutdown facility for Still No. 5 heater and to provide a safe, automatic heater shutdown in case of emergency. The complete details of this system are con tained in the instrument function outline. Loop No. 1BCA-128-9.
d. Still Pot No. 5 Level System - LS-129-3
The function of this loop is to prevent overcharging of the still pot and to alert the operator that the batch distillation has continued to a point that endangers the flow requirements of the still circu lating pump. This is done by gamma radiation operat ing through the batch from a single source mounted at high level to activate the high-level switch. The low-level switch is mounted on the circular part of the bottom dish. The high-level switch will shut down the blow tank pump and extinguish the run light. The low-level switch will activate an alarm.
e. Still no. 5 Condenser Temperature Co itrol - TRC-131-1
The function of this loop is to maintain the tempera ture of the Aroclor 5460 from the condenser at a suitable level. This is done by measuring the tem perature in the outlet line from the condenser ind controlling the cool Therminol flow to the condenser with c control valve. Set point for the controller is 15C C.
0613211
TOWOLDMONOQ48779
page 21
f. still No. 5 Receiver Temperature control - TIC-132-1
The function of this loop is to control the tempera ture of Aroclor 5460 in the receiver during filling and pump-out to storage. This is done by measuring the temperature in the tank and controlling this temperature by throttling a control valve in the steam line to the tank coil. Set point for the controller is 130C.
g. Still No. 5 Receiver Level Indication - LI-132
2.1/2.2
'
The function of this loop is to indicate the level of Still No. 5 receiver, both in the field and in the control room. This is done by a displacementtype level transmitter. A 0 to 100% dial indicates level in the field and a similar dial indicates tank level at the control panel.
h. Therminol Flow to Still No. 5 Cooler - FICA-140-1
The function of this loop is to control the Ther minol flow to the water-Therminol cooler. This is done by measuring the Therminol flow with an ori fice. One stream is modulated by a temperature control valve in the line to the still condenser. The other stream contains the flow control valve and carries the difference in flew between sut point and the first stream. Normal flow is 200 gpm. An alarm is activated if the flow drops
below a set point of 160 gpm.
i. Therminol Temperature Controller - TICA-141-1
The function of this loop is to control the tem perature leaving the water-Therminol exchanger. This is done by measuring the temperature of the Therminol leaving the water-Therminol exchanger and controlling this temperature by throttling a control valve in the water line to the exchanger. An alarm will sound if the outlet Therminol temper ature is too high or if the outlet Therminol temper
ature is too low.
High Temperature Alarm Low Temperature Alarm
-
90C 50C
2. Interlocks
a. Low flow of circulating Aroclor through the exter nal fired heater will shut the heater down.
b. Low fuel gas pressure, PS-128-10, 2.5 psig.
c. High fuel gas pressure, PS-128-11, 25 psig.
d. High furnace coil outlet temperature, ITSUI-128-6, above 800F.
, 0613212
TOWOLDMONOQ48780
page 22 e. Failure of pilot flame, DCA-128-9. f. An electric power failure will shut the furnace
down. g. A high level in the still will shut the blow tank
pump down to prevent overfilling. h. A low flow to Still No. 5 condenser will cause an
alarm to sound in the control room, 160 gpm. i. A low or high-temperature Therminol stream leaving
the water-Therminol exchanger will activate an alarm in the control room. 3. Alarms The following alarms exist through the system: a. A low flow of Aroclor through the external heater will stop the flow of fuel gas to the heater and sound an alarm. b. A complete shutdown of the external heater.
c. High or low-temperature in Still Pot No. 5. d. Hign temperature in the circulating loop through
the external fired heater, above 800F. e. High or low temperature of Therminol from the
water-Therminol exchanger. f. Low flow of Therminol through the water-Therminol
exchanger. g. Low level in the still pot.
c
0613213
TOWOLDMONOQ48781
Section VII - Still Heater
A. Start-up Operations
1. Design Considerations
a. The still heater is designed to provide enough heating for distilling and with a skin temperature low enough to prevent carbonization. Tests in the Anniston Lab on Aroclor 5060 show the following:
Temperature
11 Mins.
Condition
12 Mins.
15 Mins.
60 Mins.
437C (819F) No Decomp. No Decomp.
No Decomp.
No Decomp.
455C (851F) Si. Decomp. Si. Decomp. Rap. Decomp. Rap. Decomp.
471C (880F) Si. Decomp. Rap. Decomp. Rap. Decomp. Rap. Decomp.
The above information shows the importance of keep ing the skin temperature below 440c (824F).
b The furnace is equipped with a Juhn Zink-VBM-16 burner. Heat release:
Maximum: 3.240M BTU/Hr Normal: 2.700M BTU/Hr
Heat release of the pilot:
Normal: 0.05M BTU/Hr
c. The pilot flame must be proven by the "purple peeper" before the main gas burner can be started.
2. Start-up Operations Prior to The Initial Batch
a. A three (3) day dryout cycle should be considered the minimum time required for drying the furnace refractory.
b. Block off valves in line from circulating pump and into still. Open vent in line from heater. Inject 100 psig steam into the coil. Pressure should be about 30 psig. This can be done by removing TJRI-128A, a 1%" connection. Put this thermocouple temporarily into a side furnace opening. A dial thermometer can be used instead of the thermocouple (opening Tl on Dwg. 91287-4-Al).
c. Open damper in furnace stack.
0613*1*'
TOWOLDMONOQ48782
Page 24
d. Open manual valves in main gas line to the furnace and pilot line.
e. Gas test the atmosphere inside the heater. Use a 3 foot length of copper tubing bn the end of a rubber hose. If test shows dangerous, stop and correct the condition before lighting the burner. When the heater is cold, there is no natural draft to carry away gas or fumes. After the unit is hot, a natural draft is always present.
f. It is now necessary to "jumper out" those connec tions in the circulating system Which require a positive liquid flow through the coil.
g. Activate the main burner system and hold wall temper ature to 204 C (400f). Hold for 48 hours.
h. Increase firing rate and temperature to 371C (700F). Hold for 24 hours.
i. Firing rate can be increased to 482c (900f) during the fourth and subsequent days. Temperature recommen dations are subject to a tolerance of plus, or minus, 38C (100F).
j. After the furnace is dry, leave the pilot light operating and remove "jumper" connections. Return furnace to original condition.
B. Other Features - Safety, Alarms, Interlocks For these features, see Section VI - Distillation.
0613215
TOWOLDMONOQ48783
page 25
Section VIII - Therminol System
A. Start-up Operations
X. Design Considerations (Refer to Dwg. 2080, D2)
a. The existing heater has a design capacity of 6M BTU/hr of which only 2.8H BTU/hr is being utilized at present.
b. A new surge tank, of 3,500 gallons working volume, is provided for the storage of hot Therminol.
c. Flow rates from the surge tank will be:
Design
Normal
Item 1-150 To Existing System
1,000 GPM 1,000 GPM
Item 1-158 To New System
350 GPM
300 GPM
Item 1-159 To Existing Furnace
450 GPM
400 GPM
d. Estimated heat requirements:
New System
2H BTU/Hr
Existing System
3M BTU/Hr
A heat balance across the system will show the following temperatures based on the heat require ments as listed above:
Into Furnace
Out of Furnace
Into Existing System
Out of Existing System
Into New System
Out of New System
Flow Rate
lb/hr
GPM
Temperature
232,000
400 275C (527F)
232,000
400 310C (590F)
583,000 1,000 275C (527F)
Loading 5.0M BTU/Hr 3.0M BTU/Hr
583,000 1,000 267c (512F)
175,000 175,000
300 300
275C (527F) 256C (493F)
2.OH BTU/Hr
--
0613216
TOWOLDMONOQ48784
Page 26
2. Start-up Operations
a. Pill Therminol surge tank. Item 1-149, with 2,500 gallons of Therminol FR-2. Heat the material to 100-110C with the steam coil. It may take 24-36
hours to do this since the coil was not designed for a large heat-up requirement.
b. Start Therminol into the suction of Pump 1-158. Be careful in opening valve, not to thermal shock the system.
c. Check that cooling water is on the stuffing box gland and pump bearings.
d. Align valves through new system and start pump. Check for leakages and flow.
e. Start Therminol into the suction of Pumps 1-150 and 1-159. Be sure discharge valves are closed.
f. Make proper tie-ins to the existing system and at the existing heater.
g. Put existing Therminol heater on low heat. Align valves and start Pump 1-159.
h. Align valves and start Pump 1-150.
i. Activate "Seal-Guard" system.
B. Routine Operation
1. The system in normal operation will require the periodic check of the pump systems to make certain they are operating correctly and not leaking.
2. The temperature cogtroller in the existing heater will be adjusted to 310C or to the desired operating temper ature.
C. Safety Factors
1. A level gauge is located on the side of the surge tank, and the surge tank is vented to the atmosphere.
D. Control Locps. Interlocks, and Alarms
1. Control Loops
.
Control loops exist at the existing Therminol heater, and these are covered in the Department Operating Instructions.
0613217
TOWOLDMONOQ48785
page 27 2. Interlocks
Interlocks exist at the existing heater and are covered in the Department Operating Instructions. 3. Alarms When the Therminol pumps are shut down, an alarm will sound.
0613218
TOWOLDMONOQ48786
'h
A GOOD BRAND
SERIES VBMR
VERTICAL GAS BURNER
HIGH CAPACITY BURNER
The John Zink Company pioneered floor-firing to give furnace designers and operators a completely satisfactory floor-fired burner. Especially designed t<j burn any gaseous fuel, the vertical-firing VBMR simplifies furnace operation.
PRINCIPAL FEATURES:
Highest heat release per cubic foot of furnace volume. Maximum duty with minimum draft. Even distribution of heat in furnace. Burns high sulphur content gases without port stoppage.
The VBMR burner is fired vertically upward when located in the floor of the furnace. This arrangement makes FULL USE of all available combustion volume. Since the maximum draft is at the lowest point in the furnace, this burner can provide the greatest heat release through a given size opening.
Removable orifice bushings are provided in all burners. By operating as a premix burner, the gas stream draws in a large percentage of the total air for combustion.
Controls for both primary and secondary air are provided. A shutter-type air register provides
even distribution of air to the combustion zone at all times. Secondary air may be closely con
trolled from a point remote from the burner. It is not necessary to go beneath the furnace.
A patented radiating-armed spider, made as only John Zink can make it, discharges the mixture
of gas and primary air evenly over the secondary air stream to distribute heat according to the
requirements of the furnace being fired.
,
Burners may be furnished with standard pilots or with pilots suitable for use with any electronic flame safe-guard system.
. ~ 0613219
JOHN ZINK COMPANY
4401 South Peoria
Riverside 7-1371
Tulsa 5, Oklahoma
In: N#w Yo k -- Chicago - Hewl'on -- Philadelphia -- Lot Angolet -- London -- Mcni
TOWOLDMONOQ48787
TOWOLDMONOQ48788
NET HEAT RELEASE (MM BTU/HR)
>HN Zl K
A GOOD GRAND
SERIES VBMR
VERTICAL GAS BURNER
INSTALLATION & OPERATING INSTRUCTIONS
JOHN ZINK COMPANY
4401 South Peoria
Riverside 7-1371
Tulsa 5, Oklahoma
' TH
0613221
TOWOLDMONOQ48789
PART SECTIONAL ELEVATION
t-S/*'MOUNTINS HOLTS / M/S* PROJECTION NOT ST B CO (VSWR-SO REQUIRES S-HTS SOlTS)
THIMBLE DETAIL
- DIMENSION LEGEND-
nr BURNER
VBMR- 12
A 13 c
nr II
D 4*
r 4*
H Jit-
VBMR- 14 VftMR- 16
|\yM|*'
tp il If P IS
pP
14 *
P sP 1* 21* IB *
1VBMR- 16,
VBMR- gQ
ipP
2?)'
17 11
bP $P 2* ?P 1? ' el1 7P ? ?,y jo'
teMR^iF gsj* ?! p 2J 6 j * B* # ?
22 *
iMR-24 [VBMR-ge JrP p ?s
tr P
?'
24* 26J.
kypMR-?e
51 P gr
VBMR SO 51V P 1
14 P
if P
g' ?6 ILL 50*
06132Z2
TOWOLDMONOQ48790
OPERATING INSTRUCTIONS FOR JOHN ZINK VBMR GAS BURNERS
GENERAL
The VBMR burner consists of the following parts: (1) mixer; (2) mixer air door (primary air door); (3) gas air tube; (4) spider; (5) secondary air register; (6) floor mounting thimble.
The mixer enables the fuel gas to lnsplrate a portion of the air required for combustion as "primary air". This air quantity Is controlled by means of the mixer primary air door (2). The spider (4) distributes the air-gas mixture to the burning zone. The secondary air register (5) controls the flow of secondary air to the burning zone.
The burners are designed for the particular duty and gas condition which they are to serve. Gas limiting orifices are sized for a specified heat release and fuel gas pressure up to 30 psig maximu. The efficiency of a furnace Is dependent upon the amount of excess air In the combustion chamber. A nomograph Is available from the John Zink Company for determining the excess air volume from Orsat Analysis. If the tester Is provided with correct analysis of the flue gases and stack temperature he can, through the use of the nomograph, determine the net or gross loss In the stack gases and arrive at the thermal efficiency of the furnace. Full directions for the use of the nomograph are provided. The proper excess air condition will be dictated by the design of the furnace and the process served by the furnace. Manufacturer's recomoendatlons should be followed without exception.
DIRECTIONS FOR LIGHTING BURNERS
1. Check all gas valves to see that they are CLOSED.
2. Open all air registers wide and allow the furnace to purge for not less than 5 minutes.
3. Open the main gas supply valve to make gas available up to the individual burner valves which are still CLOSED.
4. Prepare a torch which will make a flame at least 18" long and light It In an area away from the gas lines.
5. Insert the torch through the openings of the register In such a manner as to cause the torch flame to play freely over the spider.
6. See that the primary air door is at least partially open.
7. Turn on the gas which will light off instantly then adjust the primary air door to provide the required flame condition.
8. Walt until the heater is in operation then adjust the secondary air doors to
provide the proper excess air condition.
-.
JOHN ZINK COMPANY - TULSA, OKLAHOMA
0613223
TOWOLDMONOQ48791
CAS CHART
DIRECTIONS:
Connect 002 reading to 02 reeding with straightedge. The 002 and 02 are taken by Oraat. If the analysis la accurate and if com bustion Is complete the straightedge will fall over the Hydrogen Carbon ratio for the fuel being burned regardless of whether It be solid, liquid or gaseous fuel. Proper Hydrogen Carbon refer ence for the fuel Indicates complete combustion. The Hydrogen Carbon ratio represents the weight percentage of hydrogen to carbon In the fuel. The straightedge will also fall across the line giving the per cent of excess air In the flue gas. Flue gas samples should be taken from the furnace proper to avoid air leakage.
EXAMPLE: Fuel: Natural gas Sp. Gr. 0,6
Hydrogen/Carbon - 0.315 (N2 & 002 free) Orsat Data: 00 2 9.0% 02 * 5.27. Excess Air 1 29.5%
u
Average Hydrogen/Carbon Ratio for Fuels
Fuel Gas
Fuel Oil
Sp. Gr.
0.6 * 0.315
Bunker "C" 0.11
1.0 0.250
#6 Fuel Oil : 0.11
1.5 * 0.222
Distillate Fuels * 0.13
2.0 0.208
100 i
I
F8
CENT CO* 6Y VO LU*.* PER CENT O , OY VOLUME
06132 2A
TOWOLDMON0048792
INSTRUMENT DESIGN BASIS CEA-2080
SOLID AROCLOR EXPANSION ORGANIC DIVISION ANNISTON, ALABAMA
INSTRUMENT DESIGN SECTION CENTRAL ENGINEERING DEPT.
WRITTEN BY APPROVED BY
REV.
DATE
BY
DESCRIPTION . ,
0613225
TOWOLDMONOQ48793
INSTRUMENT DESIGN BASIS CEA-2080
INDEX
1. Introduction 2. Design 3. Units of Measurement 4. control Room instruments
4.1 General 4.2 Controllers 4.3 Recorders 4.4 Annunciators 4.5 Indicators 4.6 Density Instruments 5. Field Mounted Instruments 6. Valves 7. instrument Process Piping 8. Pneumatic Signal Piping 9. InstrumentAir Supply 10. Electrical Signal Wiring 11. instrument Installation 12. Control Room & Panels 13. instrument Numbering 14. Documents 15. Preferred Vendor (Tentative)
0613226
TOWOLDMONOQ48794
CEA-2080
Page 1 of 11
INSTRUMENT DESIGN BASIS
1. INTRODUCTION 1.1 The project objective is the construction of additional solid aroclor capacity to increase yearly output to 29.6M pounds from existing capacity of 9.6M pounds. All equip ment will be located at the existing plant facilities at Anniston, Alabama. 1.2 The project will have one process area (01).
2. DESIGN SUMMARY
2.1 On all instruments, close contact will be maintained with
plant personnel. There are two technical reasons for this
(a) To learn what difficulties they have experienced
with instrument application & materials on the
existing plant and to avoid such difficulties
(as far as possible) on the expansion plant,
(b) The plant has experimented with additional instru
ments to minimize downtime. Such successes as
they may have had will be duplicated from the out
set on this project.
2.2 No existing or rebuilt instruments will be used, only
new instruments & devices will be purchased.
2.3 All panel mounted instruments & devices will be mounted
on a new panel board. Panel mounted instruments will be
of the pneumatic type.
2.4 Field pneumatic controllers will be used on variables
whose set points require little changing.
2.5 The existing chlorinator panel will be relocated. Scheduling
of this work will have to be worked out with construction
and plant operators in order to minimize production down
time .
UNIT OF MEASUREMENT
3.1 GENERAL
VARIABLE
UNITS
'
Flow-Liquid
G.P.M.C. 60F
Flow-Gas
#/HR or S.C.F.H.
Pressure-Gauge
PS I
Pressure-Vacuum
mmHg
061322 7
Temperature
c
TOWOLDMONOQ48795
CEA-2080
Page 2 of 11
3. UNITS OF MEASUREMENT (CON'T.)
3.2 Scales and charts for all flow, temperature, pressure,
level will be similar to that used on existing panel instruments for convenience of operating personnel.
3.3 FLOW INSTRUMENTS
All flow instruments shall have 0-10 sq. root charts unless
a manufacturer's standard chart is available which is graduated in exactly the flow range measured. Scales will correspond to flow range being measured (either square
root or linear). Linear flow measurement devices will
have 0-100 uniform chart.
3.4 TEMPERATURE INSTRUMENTS All temperature instruments shall have charts & scales
that match the measuring transmitters in calibration and
span.
3.5 PRESSURE INSTRUMENTS All pressure instruments shall have charts and scales that
match the measuring transmitters in calibration and span.
3.6 LEVEL INSTRUMENTS All level instrument charts and scales shall be 0-100
uniform.
4. CONTROL ROOM INSTRUMENTS
4.1 GENERAL All control panel mounted controllers, indicators and
recorders (except multipoint) will be pneumatic type
instruments.
4.2 CONTROLLERS
4.3
4.2.1
Controllers for temperature will not have rate action as standard. Level controllers will not have reset action. All controllers will have automatic/manual switching with provision for balancing.
RECORDERS
.
Continuous recorders will be used on density measurements.
A multipoint recorder will be used for temperature.
4.4
ANNUNCIATORS 4.4.1 Alarm circuits are to be normally open.
type annunciators are to be used.
Relay
4.4.2 Where both high and low alarms are required for
a single variable, a single common annunciator
TOWOLDMONOQ48796
CEA-2080
Page 3 of 11
4. CONTROL ROOM INSTRUMENTS (CON'T.)
4.5
4.4.2 point may be used.
INDICATORS
______ _
Pneumatic indicators will be an integral part of controllers
when controllers are specified. Separate indicators will
!*
be 4%" circular receiver gauges.
5. FIELD MOUNTED INSTRUMENTS 5.1 FLOW 5.1.1 GENERAL 5.1.1.1 Primary elements for flow measurement will be of two types; orifice flange meter tube, and target meter. 5.1.1.2 Flanges shall have a minimum rating of 300#, shall be tapped & will be pur chased with upstream & downstream straight runs attached. 5.1.2 ORIFICE PLATES 5.1.2.1 Orifice plates will generally be the square edge, concentric type. ' 5.1.2.2 Orifice to pipe diameter rations (d/D) shall lie in the range 0.3 to 0.7. Plate material shall be 1/8" thick type 316 stainless steel unless process conditions dictate otherwise. Weep holes will not be provided. 5.1.2.3 The following identifying information shall be stamped on the tab of each orifice plate on the inlet (upstream side): INLET Orifice Diameter Instrument Item Number Orifice Plate'Diameter
0613229
TOWOLDMONOQ48797
CEA-2080
Page 4 of 11
5. FIELD MOUNTED INSTRUMENTS (CON'T.)
5.1.3
METER RANGES
,.....
Meter ranges shall, in general, be 100 inches of
water. Low pressure gas will have a differential
in inches of water which approximates the pressure
(in psia) of the gas. The d/D ratio requirements
will be a factor in selecting the differential.
5.2
5.1.4 METER RANGEABILITY Metering rangeability for d/p instruments shall not exceed 3 to 1 full scale.
5.1.5 d/p TRANSMITTERS All d/p transmitters shall be of the dry force balance type, with 1500 psi cadmium plated steel body, type 316 stainless steel diaphragm, 1/2" NPT process connections, universal 2" pipe mounting bracket and will have a continuously adjustable range.
PRESSURE INSTRUMENTS 5.2.1 INDICATING PRESSURE GAUGES
indicating pressure gauges shall be of the Bourdon tube type, bottom connected, with 4*s" nominal dia meter dial. Dial shall be white with black numerals and pointer. Accuracy shall be 1%.
5.2.2 5.2.3
Diaphragm seal gauges will have a valve installed between the seal and the main process line. PRESSURE TRANSMITTERS All pressure transmitters shall be of the force balance type. Process connections are to be V NPT or manufacturer's standard. Blind transmitters will have a pressure gauge connected to the trans mitter process connection. Materials used for pres sure elements shall be selected for compatibility with the process stream.
0613230
TOWOLDMONOQ48798
CEA-2080
Page 5 of 11
5. FIELD MOUNTED INSTRUMENTS (CON'T.)
5.3 5.4
5.2.4 Pressure switches are to have adjustable set points and will be suitable for weatherproof classification (Nema 3).
LEVEL INSTRUMENTS Bubbler type level transmitters will be used for level transmission. Rod out facilities will be provided, where level alarm only is required nuclear type alarm switches will be used. There is no application on this project for bouyancy type transmitters or float type switches. TEMPERATURE 5.4.1 PRIMARY ELEMENTS
5.4.1.1 All thermocouples which are tied to multi point recorder will be iron constantan.
5.4.1.2 Certain temperature alarms will have chromel-alumel thermocouples in keeping with previous project.
5.4.2 THERMOWELLS Thermowells shall be type 304 stainless steel not withstanding that most thermowells on existing plant are carbon steel. Thermowells will have 1" NPT screwed or minimum 14" flanged process connections.
5.4.3 DIAL THERMOMETERS Dial thermometers will be of filled type and generally will be back connected. Dial size will be manufacturer's standard but not less than 4" diameter. Separate thermowells will be provided.
6. VALVES 6.1 CONTROL VALVES 6.1.1 Diaphragm operated control valves will be flanged with 1" minimum body size. Piping, specifications will be followed on body materials and flange rating.
0613231
TOWOLDMONOQ48799
CEA-2080
Page 6 of 11
.6 VALVES (CON'T.)
6.1 CONTROL VALVES (CON'T.)
6.1.2 Standard trim will be type 316 stainless steel
unless process conditions require otherwise.
6.1.3 POSITIONERS
Valve positioners will generally be side mounted,
direct acting type with three gauges and a by
pass, except that the bypass will be omitted
on valves in split range service.
6.2 SAFETY RELIEF VALVES
6.2.1 CONSTRUCTION
Flanged relief valves, in general, shall be en
closed spring, bolted bonnet, screwed cap, full
nozzle type with stainless steel nozzle, disc,
guide & spindle, and cast steel bodies. Body
pressure ratings for all flanged valves shall be
the same rating as valve inlet flange. Screwed
valves (thermal relief) may have screwed bonnets
. and may be used where small orifice areas are re
quired and if allowed by piping specifications.
6.3 RUPTURE DISCS
6.3.1 SAFETY HEAD FITTINGS
Generally, the safety head shall be the type with
a diameter that fits inside the bolt circle.
6.3.2 RUPTURE DISCS
All rupture discs will be interchangeable with all
safety head fittings for a particular size.
Maximum bursting pressure of disc shall not exceed
the maximum allowable working pressure of the pro
tected system.
6.4 SOLENOID VALVES
Solenoid operated valves shall be of the continuous duty
type with encapsulated coils and shall meet Nema 3.
7. INSTRUMENT PROCESS PIPING
Process instrument piping shall match process piping
specification in material of construction. Other ma
terials may be used when required due to process condi
tions.
, 0613232
TOWOLDMON0048800
CEA-2080
Page 7 of 11
8. PNEUMATIC SIGNAL PIPING 8.1 OUTISDE OF PANEL BOARD 8.1.1 Single tubes outside of the panelboard will be high density polyethylene in thin wall conduit. 8.1.2 Multitube bundles will be 4 tube number coded high density polyethylene inside pvc sheath. Assembly is then wrapped with asbestos and whole covered with heavy poly-vinyl sheath. 8.1.3 All tubing fittings will be Swagelock or equal.
9. INSTRUMENT AIR SUPPLY 9.1 Air supplies to individual instruments shall be 1/2" pipe size with block valve at header and 1/4" Flolok valve at supply side of filter regulator. Connections, from the instrument filter regulator to the instrument will be tubing. Connections into air header to be from top of pipe. 9.2 An air supply pressure gauge will be supplied at the filter regulator.
10. ELECTRICAL SIGNAL WIRING 10.1 GENERAL Thermocouples and other low energy signals will be seperated from 115 vac wiring. All wires and cables will be tagged with their assigned number. 10.2 THERMOCOUPLE EXTENSION WIRE Single twisted pair #16 awg solid conductor with pvc or fiberglass wire insulation and overall insulation depending on maximum expected ambient temperature.
11. INSTRUMENT INSTALLATION 11.1 All field instruments shall be mounted at grade or on plat forms. I'orce balance transmitters will be mounted on 2" pipe stands, and shall be accessible from grade or platform. 11.2 All field mounted indicating or recording .instruments shall be mounted so that chart or scale centerline is 5' above grade or platform and shall be located as near primary connection as possible, consistent with instrument accessbility. 11.3 Dial thermometers, pressure gauges, test wells, etc. that are line mounted, shall be located so as to be plainly
0613233
TOWOLDMONOQ48801
CEA-2080
Page 8 of 11
11. INSTRUMENT INSTALLATION (CON' T, )
11.3 seen and accessible from grade or platform.
11.4 All instrument leads to vessel, line or equipment will be
properly supported to relieve strain on connections at
equipment and instrument.
12. CONTROL ROOM AND PANELS
12.1 GENERAL
12.1.1 The existing control room will be enlarged to the
south to accomodate the new control panel.
12.1.2 The existing chlorinator panel will be relocated
to a new position in existing control room. This
relocation will be scheduled after new plant start
up.
12.2 ELECTRIC POWER
Electric power for the control panel will be supplied from
breaker panels for this purpose only.
12.3 CONTROL PANEL
12.3.1 A new control panel with straight vertical front
will be installed in expanded control room. Mounted
on the front of this panel will be the followings
Pneumatic Recording controllers Multipoint Recorders Annunciators Indicators Pushbuttons and "Run" Lights for Electric Motors
Mounted behind panelboard will be the following:
Sequencing Instruments Pressure Switches
Power Supplies for Chart Drives
12.3.2 Panel will be light green (enamel) outside and white
inside.
12.3.3 All panel layout drawings will be by Monsanto ex
cept detailed steel drawings by the panel fabrica
tor.
.
13. INSTRUMENT NUMBERING
_,
Instruments will be numbered and shown on flow sheets and engi
neering flow diagrams as per new Monsanto Procedure Standard No.
Rl.l Std. 2 titled "IDENTIFICATION OF LOOPS AND COMPONENTS".
14. DOCUMENTS
The following schedules and drawings will be prepared:
06132 34
TOWOLDMON0048802
CEA-2080
14. DOCUMENTS (CON'T)
DRAWING TYPE
I I I E I I I E I I I
Page 9 of IX
DESCRIPTION Instrument Design Basis Instrument List Instrument Schematics Annunciator Schematics Instrument Installation Details Instrument Specifications Layout-Instrument Tubing Wiring-Instrument Panel Tubing-Instrument Panel Nameplate List Instrument Function Outlines
0613235
TOWOLDMONOQ48803
CEA-2080
Page 10 of 11
15. PREFERRED VENDOR:
INSTRUMENT
Annunciator Non.Indicating On-Off T/C Switch (Purnaoo Outlet)
Temperature Recorder-Multipoint
Dial Thermometers
Thermocouples & Extension Leadwire
Thermowells
Pneumatic Temp. Transmitter with T/C Input
blind
.
.
Indiaatang Temperature Transmitters
Pressure and Temperature Switches Orifice Plates, Flanges and Meter Runs Sight Feed Bubblers
Pressure Gauges (1% Accuracy) Diaphragm Seals
Manometers Instrument Air Filter/Regulator Insyrument Air Precision Regulator Absolute Pressure Transmitters Indicating Pressure Transmitter
Tank Level Transmitter Blind Differential Pressure Trans mitters
Gauge Glasses Relief Valves Diaphragm control Valves
Piston Operated control Valve
VENDOR Scam Model #51;Sequence AF.
Tr-aa-emation L---o--o---d--o--... &---U---o---m---t-a--h--r--u- Bl- ehloencetyRwOHeIKl. lIS Palmer model sor ThermoElectric Alloy Engineering
Taylor 721T Series - Solid State Foxboro Model 4S Mercoid model daw Daniel Meriam esiss Ashcroft Model 1020, Jj"NPT Mansfield & Green type ja Meriam imsio Fisher Governor 67FR Moore Model 41 Foxboro Model UAL Foxboro Model 45 FinffVina IWAMr F01B.0R0 TYFE I3FE
Foxboro Model 13 Jerguson series iz. Lonergan t j[ ltc-ii Fisher Governor Jamesbury d isof
061323b
TOWOLDMONOQ48804
CEA-2080
Page IX of 11
15. PREFERRED VENDOR (CON'T.)
INSTRUMENT
VENDOR
Solenoid Valves
Skinner; ASCO
Receiver Gauges
Ashcroft 12.11 ljc
Set Point Receivers
Fischer Porter model 1303
1 Pen Recording Controllers
Taylor Series 91JF
Indicating Controllers
Taylor Series 91K
Integrator
Foxboro Model
ks-eb
Horns and Bells
Federal;Benjamin
3 Valve Manifolds
Anderson-Greenwood mivc-4
Rupture Discs Stepping Switches
Falls Industries; B.S. & B. S'JtCVL
Taylor Model 1B.D Jt-Z *z-r.;
Pneumatic Tubing
Dekoron High Density FB
Junction Boxes
Brockmeier
Combined Chlorinator & Still Panel Board
Competitive Bids
SPECIAL INSTRUMENTS DESCRIPTION & LOCATION
PROBABLE VENDOR
Flow measurement on inlet to still furnace.
Previous experience indicates problems with
Taylor volumetric D/P cell. Target type
transmitter
work.
stro'S Woe
Density measurement of 5460 may be corre lated with softening point and it is de
sired to eliminate quesswork in deciding
when a batch has been distilled. A
nuclear device for low still level alarm & for receiver density recording will be purchased.
Ohmart/iNDLiiTcmL / NULL EONIC S
Density of chlorinated product is consi dered to be correlated with 5060 formation. Nuclear gauges for density recording will be purchased.
Ohmart/ Indus tool ' nucleonic3
0613237
TOWOLDMONOQ48805