Document Oz4eEBJmxGmZ33aQ7DJQmkkZw
pq*
OwcjAtV
*tIi-
IT
WORK PROPOSAL WGK PLANT TECHNICAL SERVICES
iNifulCb r
D. R. Middleton IYC6MLtTtO
D. R. Middleton
BE FT.
M6BUBT
VO -=r CM
AROCLOR
OATC
8/19/65
OATf
JAI8h/51. 9/65 91370:3494
ORIQINAL TO T. 9 0 JO* tOOK CC ASST Ino SHAT, 0CS0N
D. B. Hosmer -DHOSM J. A. Mul lend ore-JMtn
E. Harris P. E. Helsler V. Brawley H. B. Patrick
FOLDER' 246(3^9^ )
W. J. Gresham
AROCLOR: IMPROVE SAFETY OF BOTTOMS DROPPING OPERATION
TATtMtNT O' MOSLEM ANO O*JICTivt ((/* rtvtrtt $ldt If n*C4$$cry)
''
At a frequency of at least once/week a product change-over is made and a boll down of the still system Is required. At the end of the boll down, bottoms (tars) are dropped from No.2 stills. The hazards Involved In this
operation are: open flames, material at 300C, manual handling, and toxic fumes. The objective of this Job Is to reduce and/or eliminate the above mentioned hazards.
tlTIMATlb SAVING 0* "6mIA BENEFITS
Safety of personnel.
rtftmm ar6am, utriUNte). m Make necessary equipment and operating changes to mirUralze`hazards.
p, E. Helsler
uut uaiuiir-------------------------J. R. McClain
iTKeumui uaflucnan