Document Oz4dnG6Bjr77jO61Q6EOBB1e1
AR226-2518
OHIO RIVER WATER SAMPLING RESULTS DUPONT WASHINGTON WORKS FACILITY AND THE LETART LANDFILL
Date; November 2002
Project No,:
D6WW7423 18983635J4000 18983632.00021
CORPORATE REMEDIATION GROUP An Alliance between
DuPont and URS Diamond
Bartey Mill Plaza, Building 27 Wllmlngton, Delaware 1980S
ASB019657 EID630089
I
1
1 1 1 1 1 1
...I Il^iTi^1'
1
1
1
1
1
1
1
< .
^
A , ;::;::;;:;,;^
DRAFT Ohio River Water $amptin9 Rasiilis
Table of Contents
TABLE OF CONTENTS
1.0 Introduction--,,....,,..,,......-.,,--..--"--"".--,,..--.----.--...--.....----------.--------"."."I 2.0 C-8 Analyses and Analytical Reporting ..............,,...........,,.......,,....,,.....,,.,,.........--...3
3.0 Ohio River Water C-8 Results Near The Washington Works Faeily.,.,.....,...,,........5 4.0 Ohio River Water C-8 Results Near the Letart Landfill .............................................7 5.0 Ohio River Parameters...................................................,...........,....,,,.,...........,........,,.8 6.0 References........................................,.......,.......,.......^.......,.,*.......;..................-..-.-...9
Table 1
Table 2 Table 3 Table 4
TABLES
Ohio River Water Sampling Plan, DuPont Washington Works Facility, and Letart Landfill
GPS Coordinates and Field Parameters for Ohio River Water, DuPont Washington Works
Outfall 005 C-8 Results
Ohio River Parameters
Figure 1A Figurel B Figure 2
FIGURES
Ohio River Water Sampling Locations - Upstream, DuPont Washington Works Facility
Ohio River Water Sampling Locations - Downstream, DuPont Washington Works Facility
Ohio River Water Sampling Locations, Letart Landfill Site
Appendix A Appendix B
APPENDICES
Ohio River Stage Data from USGS Gaging Station 03150800, Ohio River near Marietta, Ohio Local Climatological Data from NOAA for June, July and October 2002
nveitesijlts.ttoc Nov. 19,02 Wilmlngton, DE
j
ASSHHOO: I&658 EID630090
DRAFT Ohio River Water Sampling Results
Introduction
1.0 INTRODUCTION
A multi-media Consent Order (Order No. GWR-2001-019) was entered into between the West Virginia Department of Environmental Protection (WVDEP), the West Virginia Department of Health and Human Resources - Bureau for Public Health (WVDHHR* BPH) and DuPont on November 15,2001. The Consent Order identified a. series of requirements and tasks to be performed by the parties (WVDEP, WVDHHR-BPH, and
DuPont) in order to determine whether there has been an impact on human health and the environment as a result of releases of ammonium perfluorooctanoate (C-8), CAS Number 3825-26-1, to the environment from DuPont operations at the Washington Works facility
(facility) and the associated landfills (Local, Letart, and Dry Run). The Consent Order established the C-8 Groundwater Investigation Steering Team (GIST) to oversee
investigations and activities that will be conducted to assess the presence and extent of C-8 in drinking water, groundwater, and surface-water at and around the facility and the
Local, Letart, and Dry Run Landfills.
Pursuant to Attachment A of the Consent Order, three primary tasks will be performed by DuPont and evaluated by the GIST. These tasks (Tasks A, B, and C) are described briefly
below:
0 Task A: Conduct Groundwater Use and Well Survey/Groundwater Monitoring -this task involves evaluating C-8 in groundwater initially within a one-mile radius fi-oro the facility and the landfills and public water supplies upstream and 10 miles downstream of the facility along the Ohio River,
Currently, four reports have been issued documenting the surveying activities (DuPont 2002a; 2002b; 2002c; and 2002d). These reports provide the results for one-mile radius surveys around the Washington Works Facility/Local Landfill, Letart Landfill, Dry Run Landfill, and in Washington County, Ohio. In addition, results for the two-mile radius survey around the Washington Works Facility/Local Landfill and for public water supplies along the Ohio River are presented. A two-mile survey in Washington County Ohio has recently been completed, and a report documenting these activities is in preparation. Quarterly
monitoring of C-8 at three public water supplies (Tuppers Plains, Lubeck, and
Little Hocking) is ongoing.
Q Task B; Assessment of Existing Groundwater and Surface Water Monitoring Data - this task comprises three subtasks:
Compile historical C-8 data. Sample monitoring wells and outfalls at the facility and associated landfills. " Develop a Groundwater Monitoring Plan for fee facility.
The first and third subtasks were completed and submitted to the GIST for review. Subtask 2 is an ongoing task conducted monthly for required surface-water sampling points and quarterly for groundwater and for non-required surface-water sampling points. Sampling results arc submitted monthly and/or quarterly to the GIST;
riverresults.doc Nov. 19,02
1
Wilmington. DE
ASB01&659 EXD630091
DRAFT Ohio River Water Sampling Results
|ntrOdll Ctl 0(1
Q Task C: Plume Identification/Groundwater Assessment - this task includes evaluating the vertical and horizontal extent ofC-8 impacted groundwater and specifically includes an assessment ofC'8 impacted groundwater at the Letart Landfill and its impact on the Ohio River and public water supplies along the river. Drilling of new monitoring wells has been completed at the Washington Works Facility and at tile Local, Letart, and Dry Run Landfills. C-8 sampling of the all monitoring wells was recently completed, and C-8 analysis is underway.
In addition to the tasks described above, the GIST also recommended that DuPont
conduct a river investigation to assess if C-8 impacted groundwater at the facility
is impacting the Ohio River. DuPont agreed with this request and the Ohio River Water Sampling Proposal for the Washington Works facility and the Letart Landfill was submitted in February 2002 to the GIST. This proposal was subsequently approved by the GIST. Shortly after approval, the Ohio Environmental Protection Agency (Ohio EPA) reviewed the proposal and recommended slight modifications. DuPont agreed to change the proposal as recommended by Ohio EPA (DuPont letter to Ohio EPA, dated April 1,2002). Sampling activities were conducted in June, July, and October 2002,
This report presents the results of the Ohio River water sampling and is organized in the following manner
Q Section 2 provides information on C-8 analyses and analytical reporting.
Q Section 3 presents the Ohio River water C-8 results for locations upstream, adjacent to and downstream of the Washington Works Facility.
Q Section 4 provides the Ohio River water C-8 results for locations sampled adjacent to Letart Landfill.
Q Section 5 presents the Ohio River parameters.
0 Section 6 provides references.
rivel-resulta.doc Nov. 19.02 Wllmlngton, DE
ASH019660 EID6300S2
DRAFT Ohio River Water sarnpiiriQ Results______C-8 Analyses and Anajytjcaj Reporting
2.0
C-8 ANALYSES AND ANALYTICAL REPORTING
The Quality Assurance Project Plan (QAPP; DuPont, 2002e) discusses the procedures and protocols developed to ensure that project infonnatioQ, data, and decisions derived from or based on data acquired during the C-8 investigation at Washington Works Facility and associated landfills are technically sound, usable, and properly documented. The QAPP was submitted to the GIST in January 2002. Specifically, Sections 5,6, and 10 present sampling protocols, sample and document custody procedures, and internal quality control checks that were followed during the field sampling activities associated with the groundwater well and water-use survey-
The QAPP also presents information on quality assurance, calibration procedures and frequency, analytical procedures, data reduction, verification, and reporting. Information on the analytical method and the precision criteria used for the C-8 reporting are summarized below.
In October 2001, Bxygen Research, Inc. (Exygen), located in State College, Pennsylvania, developed and tested a new analytical method that utilizes Liquid ' Chromatography/Tandem Mass Spectrometry (LC/MS/MS). DuPont adopted this method (LC/MS/MS) for analyzing C-8 in water in November 2001, Currently. Bxygen performs all C-8 water sample analyses for DuPont.
Exygen reports C-8 results for the laboratory replicate of each field sample. These results are evaluated for precision by comparing the field sample result to the corresponding
laboratory replicate result:
Q If both results are less than the practical quantitation limit (PQL), the replicate
sample for that analyte is considered to have passed flie precision criteria-
0 If one or both results are between one and five times the PQL, the replicate is considered to have met the precision criteria if the two results differ by less than
the PQL.
Q If one result is less than the PQL and the other is not and if the two results
differed by a value less than the PQL, the replicate is said to have met the
acceptance criteria.
Q If both results are at least five times the PQL, the replicate is considered to have met the criteria if me relative percent difference (RPD) between the two results is
less than or equal to 20%. The RPD is the absolute value of the difference of two measurements divided by their average.
When the precision criteria outlined above are met, Exygen reports the average of the
field sample and the laboratory replicate results reported. If criteria for precision are
exceeded, Exygen reports the higher of the sample and laboratory replicate results. Finally, when one result (from the sample/laboratory replicate pair) is above the PQL and one below, the result that is above the PQL is reported. C-S results are recorded in the Corporate Environmental Database (CED) and are reported as PC-143 for consistency with historical results.
rivenesults.dOG Nov. 19,02 WjltrttlStOli, DE
ASH019661 EID6300&3
DRAFTohio rover waier samplingResults_________c-8 Analyses and Analytical RepprtinflL
Ajti aliquot of each field sample is also analyzed as a matrix spike (MS). Results of (he MS analysis are used to assess accuracy. The MS recovery value must fall between 70 to
130%, unless the sample concentration is at least four times the amount spiked. The maximum amount used to spike field samples is 500 ug/L.
All data packages generated by Exygen are reviewed in-house for compliance with the laboratory Standard (aerating Procedures (SOP) and data usability, using the checklist provided in the QAPP. Results of the in-house review indicate that data reported by Bxygen have been generated in compliance with the laboratory SOP, with few exceptions as noted in the individual review summaries. All data reported by Exygen have been Judgedusable for the purposes of the project
In addition, 13 river-water saoiples and two blanks were submitted to Environmental
Standards Incorporated of Valley Forge, Pennsylvania, for quality assurance review. Results of the additional quality assurance review also indicated that the quality of the data is acceptable and qualification ofthe data was not warranted.
liveiresults.doc Nov. 19,02 Wilrninalon. DE
ASH01&662 EID630094
I
DRAFT Ohio River Water Sampling Results
Qhjo RJVer Water C-8 ReSUttS Near ?6
____________________________Washington Works Facility
I
3.0 OHIO RIVER WATER C-8 RESULTS NEAR THE
WASHINGTON WORKS FACILITY
I
Near the facility, Ohio River water was sampled to measure the concentrations ofC-8 in
the Ohio River. The sampling investigation was designed to meet three main objectives:
I o Characterize background C-8 concentrations m river-water upstream of the facility.
I Q Assess C-8 concentrations in river-water along the facility reach, Q Evaluate C-8 concentrations in river-water downstream of the facility.
I Ohio River water upstream of the facility, along the facility, and downstream of the facility was sampled during this investigation, hi total, 49 river-water samples were
collected, including two duplicate samples. At selected sampling areas, as many as three
I
river-water samples were collected along a single transect across the river and as many as three depths were sampled (dip, mid-column, and bottom). All river-water samples were
analyzed for C-8 in accordance with the Standard Operating Procedure approved by the
,
I GIST and the Quality Assurance Project Plan (DuPont, 2002e). During the same time period that the river-water was sampled, effluent from Outfall 005
t was also sampled to evaluate dispersion downstream of the outtalL Historically, Outfall 005 has shown the highest concentrations of C-8 and discharged a larger volume of effluent compared to the other outfalls and outlets at the Washington Works Facility.
However, the C-8 concentration at Outfall 005 has been steadily decreasing in 2001 and
2002 following the installation of a carbon adsorption treatment system in the
flouropolymers process.
I Table 1 summarizes the Ohio River Water Sampling Plan including: Q A description of the sampling transect locations on the river
I Q The number of sampling points along each transect Q The sample type, dip (surface), mid-column and/or bottom collected at each
I sampling point fa addition, for each sample collected, the following information us provided:
I 0 The transect number 0 The location of the individual sample along the transect (WV-side, center, or OHside)
I
0 The type of sample (dip, mid-column, or bottom)
Q The sample identification
I
Q The C-8 result (in ug/L)
Q The date of sampling
I
<( rivarresulls.doc Nov. 19, 02 Wilminoton, DE
ASH019663 EID630095
DRAFT ohio River waier sampling Resuib
Ohio River Water C"8 Results Near the
________________________Washington WorksPacjIH^
Figures 1A and B present the Ohio River water-sampling results graphically. At each transect location, a summary table ofC-8 results is shown. Table 2 provides the Global
Positioning System (G3?S)coordinates of each sampling location and the Held parameters
monitored during collection of each sample (temperature, pH, and specific conductance).
Table 3 provides the C-8 results for Outfall 005.
riverresults.doc Nov. 19, 02 WBmington. DE
ASH01&664 EXD630096
DRAFT Ohio River Water Sampling Results
Ohio River Water C*8 Results Near the
_________Letart Landfill
t
4.0 OHIO RIVER WATER C-8 RESULTS NEAR THE LETART
LANDFILL
I
Adjacent to the Letart Landfill, Ohio River water was also sampled to measure the
concentrations of C-8 levels in Ohio River. Two locations were sampled. One sampling
I
location was positioned in the river near the point where the ravine originating at the landfill discharges surface-water into the river. The other sampling point was located
approximately 1000 feet downstream of the fust location. All samples were collected
I
near the shoreline (approximately 100 feet east of the shoreline). Dip and mid-column samples were collected at both locations. In total, five river-Water samples were
collected, including one duplicate sample. All river-water samples were analyzed for C-8
I in accordance with the Standard Operating Procedure approved by the GIST and the Quality Assurance Project Plan (DuPont> 2002e).
I Sampling information and C-8 results for the Ohio River water sampled near the Letart Landfill are summarized in Table 1 and are presented graphically in Figure 2, At each transect location, a summary table of 0-8 results is shown in Figure 2. Table 2 presents
I
the GPS coordinates and field parameters (temperature, pH, and specific conductance) for all samples near the Letart Landfill.
I
I I I I I
s riverresults.doc Nov. 19.02 WBirtnglon, DE }
ASH019665 BID630097
DRAFT Ohio Rh/er Water Sampling Results
OlllO RJVBr Parameters
5.0
OHIO RIVER PARAMETERS
Table 4 provides the Ohio River stage data and the daily resultant wind direction and wind speed for the time period that sampling was conducted. River discharge is not monitored at the USGS Gaging Station 03150800, Ohio River near Marietta, Ohio. Therefore, this data is not available for the time periodthat sampling was conducted. Appendix A provides the Ohio River Stage data fiom USGS Gaging Station 03150800, Ohio River near Marietta, Ohio. Appendix B provides the complete spreadsheetsof daily Local Climatological Data for June, July, and October 2002 recorded at the Wood County Airport weather recording station.
ilverresulte.doc Nov. 9,02 Wilmlngtort, DE
^ -:"
ASH01&666 E1D630098
DRAFT Ohio Riwr Water Sampling Results
RefrnC6S
1
6.0 REFERENCES
DuPont. 2002a. One-Mite Radius Survey and C-8 Sampling Report and Ohio River
I
Public Water Supply Sampling, DuPont Washington Works (December 2001February 2002), April 2002. DuPont Corporate Remediation Group and URS
Diamond.
I
I
,
.
_,, 2002b. One-Mile Radius Survey and C-8 Sampling Results, Washington
County, Ohio (March - June 2002), August 2002. DuPont Corporate
-----^, -- -- -
Remediation
^_-_,-- _-- _ _--_ --
Group and URS
^
.
//
-
w
Diamond.
___. 2002c. Two-Mile Radius Survey and C-8 Sampling Report, DuPont Washington Works Facility/Local Landfill, West Virginia (March-May 2002), August 2002. DuPont Corporate Reniediation Group and URS Diamond.
I _. 2002d. Public Water Supply Results, West Virginia and Ohio, DuPont
Washington Works, Washington, WV, August 2002. DuPont Corporate
Rexoediation Group and URS Diamond.
< ' -
. 2002e. January 2002 Groundwata: Investigation Quality Assurance Project Plan
for Washington Works Plant Washington, WV, January 2002. DuPont Corporate Remediation Group and URS Diamond.
"'i;*!i"
I I I I I
USEPA. 1994. Region ni Modifications to National Functional Guidelines SOTOrganic
Data Review.
I
I
1
riverresulls.doc Nov. 19,02 VVilmIngton, DE
ASH019667 EID630099
^
00
ASH019668 EXD630100
ASB019669 EID630101
ASH019670 EID630102
Table 2. GPS Coordinaies and Fidd Parameters for Ohio River Water
DuPont Washington Works
WWK-R-TSJ2-2M WWK-R-TS2.2S WWK-R-TS13-2B
WWK-R-TSt3^I
WWK-R-TS3-2S WWK-R-TSJ4-1B
WWK-R-TSJ4-1M WWK.R-TSJ4-1S
WWK-R-TSM-2B WWK-R-TSI4-2M WWK-R.TS14-2S
WWK-R^TSM-SB WWK-R-T8l4^3.M
WWK-R-TS|4^S
WWK-R-TSJ5-1B WWK-R-TS WWK-R-T8;
WWK-R-TSJ5-2B
WWK-R-TS 5-2M WWK-R-TS
WWK-R-TS WWK-R-TSB-3M WWK-R-TS J5-3S WWK-R-TS J5-3S-2 (DUPT WWK-R-TS |6-1 B WWK-R-TS 16-1M WWK-R-TS |6-IS
WW[WTS|6-2B
WWK-R-TS WWK-R-TS WWK-R-TSji
WWK-R-TSJ6-3M
WWK-R-TSI6-3S
WWK-R-T817-1B WWK-R-TSt7.1M WWK-R-TS17-1S
WWK-R-TST7-1S-2 (DUP) ;
8/2820(12 8/28/2002 10/17/2002 6/26/2002 6/26/2002 8/26/2002 6/28/2002
6080002
6/28/2002 6/28/2002 6/28/2002 6/28ffi002 e/28afli02 6f2Si2W2 ?27/2002 807/2002 6/27/2802 8/273082 6/27ff002| 8/27/20021 6/27/2602! SIZTOWK 6/27/2B02! 8/27/2002:
8/27J2002 6/27/2002 6/27/2002
6/27/2002 8/27/2002 6/27/2002 027/2002 6/27/2002 6/27/20021
W17/2002I 10/17/2C02! 10/17/2002 10/17^0021
11/18/2002
Ctoudyj3820.7 \!SV33.Q3~
CEou<M3920.7
|ei33.03
481 Otoudy/Ralnl 39*16.103 61 "35.377
ctoucMsg'iS.loa CtouttylSS-l 8.163
81'35.377 J.81'35.442
81
CtoutM 3S-16.432 [81'39.696
81
Ctoudyl3816.432 m '39.636
Cloudy}3e'16.432 .81*38.886
81
Ctoudyt38-16gDg 81'3S.708
82
C!oi:jy|39''t6.500 81*39.708
82
Ctoudyt3S'16^00 !a1l39.708
82
Clou{iy|39ie.S8a :81'39.702
82
Ckyudy{38'16.55e 81*39.702
82
aOTdy{^*1&588 181*38.702
82 RalimW!n(H39'18.3S2 '81*40.363
82 Ralia/Wlnd|3916.382 :81*40.363 80 R^!l/Wtnd3916.382 ,81 40J631
80 FteSn/Wn-Kiia9"1M25 i8.r40.334 80 Ra'n/Wtnctl39'16.425 91 '40^34 80 RaIniWinti|39"18.425 181"40^34
RtdnW&iti 39 16.487 181'40.396
8e}Wtnd/aou(lyj38'16.4S7 181"40^96
B2jW{fldi^fC^oudyj3916.48871'40.396.
321Wlntfaoudyj381^487 81 "40^96
82!
CtoU<ty|3S'16.272 61 "40.7
82;
Ctou(ty|38'18.272_ |81140.7
821
Ctou^ty381>16.272 81*40.7
82
ClomM3S'16.334 81*40.745
82
CtouiW39'l5334" 8140.745
82
Cloudy:t39'16,334 61*40.745
85
Ctoudyt39'16*377' 81'40.773
85
0011(^38*16.377 81 '40.773
85
aoii(M39''18.377
48| Cfoi>dy/Rainj3915.045
4U CtotKiyffta'gt|39'15.045
4&)aqudyjainj39'15.&45
48) CtoBdyJRahj39'15.045
iBI'40.773
i8<'41.613 81'41.613 81'41.613 jar41.613
27
18
29.1 29.1 29.1
27
29 13.5:
24' 12
28 13
Z4J5 13
30.4 15
27 14.5i
20.65 20.6& 20.65J
20.65I
19.6S 10.3
1 2 2
2 741 2
2
2
2 2 2
~2 2
7.47 2
7.61 2
7.58 2 2
6,77 2 7.28! 2 7,431 2
7,49; 2 7,52. 2
7.48i 2 7.82 2 7.41 2 7J51 2
1 7.87 1
1 7,87 1
7.87
Table 2. GPS Coordinates and Field Parameters for Ohio FUver Water
DuPont Washington Works
1V19S002
I
Table 3 Outfall 005 C-8 concentration (ug/L)
DuPont Washington Works
i WWK-Z- OUTFALL 005
isarffgflE
6/24/2002
26.7
I WWK-Z- OUTFALL 006 WWK-Z- OUTFALL 005 WWK-Z- OUTFALL 005
6/25/2002 6/26/2002 667/2002
17.9 47.7 79.3
I WWK-Z- OUTFALL 005 WWK-Z- OUTFALL 005 WWK-Z- OUTFALL 005
7/1/2002 7/10/2002 7/11/2002
13.6 37.8 239.0
WWK-Z- OUTFALL 005
7/12/2002
12.8
I
WWK-Z- OUTFALL 005 WWK-Z- OUTFALL 005
10/16/2002 10/17/2002
141.0 18.0
I
I
I
I
I
I
I
I
I
I
S
11/19/2002
Page1
ohioriver-xis
ASH01&673 EID63010S
I
Table 4 Ohio River Parameters DuPont Washington Works
i
Wtritt^"'^SS^g@ t5? *?ytt'S'SEiwir --srsjjrFv-yif "-[sav^
I 612Q120Q2 6/27/2002 6/28/2002
582.63 582,62 582.74
_5.2m^
7.4 mph
2.5 mph
230 degrees 230 degrees i29CIdegrees
7/10/2002
582.95
4.5mph
30 degrees
I 7/11/2002 10/17/2002
580.78 683.22
7.3 mph 2.6 inph
50 degrees
|260.ijegrees
.
I *Data from USGS Gaging Station 03150800, Ohio River near Marietta, OH
I
I
I
I I I I I I I
.1
11/19/2002
Pag@1
ohioriver.xts
ASH019674 EID630106
-n
5
30 m (o
ASH01&675 EID630107
FIGURES
ASH01S676 EID630108
10>
-MiMA
lcB(M;actO
lWD(n)HHuetxm)
^
Cwporata Remedtotton Group
j(>tJUUu< IxtlWtft ymtfti otit n< -< DtmiMt >
OHIO RIVER WATER SAMPLING LOCATIONS-UPSTREAM
DuPont Washington Works Facility Washington, West VirgSnta
BcifDy Mil Pkiln, Giiln 27 Wmhgfen, MW4 19Bflo-tKl27
wt.
fac Ai ftnMt
|imwna. 7TMtn
|unar 1A
ASH01&677 EID630109
SCALE
<sy ^ '-
!! '
"
iip^aSaSiff--l------------------------'1 WbjlnUilHfl 1----'------~--"------'--'
1------'-----------------"'"-- ~^--------""~~'
OHIO RIVER WATER SAMPLING
(CLD
IJOCATIONS-DOWNSTREAM
Mi"
BO. iBaw
ASH WBOWDCestaf)
ConKurate HomwSaVm Grew
l>-pn> flul TH V-C MMMi Owfl
DuPonI Woshlnglon Works Focility Washington, West Virgmio
WFKWEBOHsittienao
Bo>1e> Mil Ptaa ItullAig 27 MmbBtei. Btlwre 1BMO-OW
Aisfifw
afisfm
iwaaiiu
1B
ASH019678 EID630110
ASH01&67& EXD630111