Document Okr7mxKaDqGzEGOpRy0G2VDL
FROM ROBERT ?. CARTER PITTSBURGH OFFICE
+!
//
TO
jf.Hr. Thonaa Bonney
rA' /
Pittsburgh' Office
3
December 23, 1971
s"
RE: EMERGENCY STANDARD FOR EXPOSURE TO ASBESTOS DUST
In the Federal Register of Tuesday, December 7, 1971, the Occupational Safety and Health Administration, Department of Labor, published a notice of tr.e issuance, effective immediately, of an emergency standard for exposure to asbestos dust. A copy is enclosed for those who have not yet seen it. This emergency standard, which will be effective until further notice, establishes lower permissible employee exposure levels than those which had been made effective with the notification in the Federal Register of Friday, August 13, 1971. We are, therefore, notifying all of our operating locations of this emergency standard so that they may take appropriate cognizance of this with respect to any of their operations involving the handling, cutting, fabricating or other work involving the use of asbestos or asbestos-containing products such as the Marinite which is used extensively in our ingot casting operations. Where there is any question about the present levels of worker exposure meeting these emergency standards, the use of appropriate respirators should be instituted.
Shown on the attachment are all the respirators which have been approved as of February 1, 1971, by the U.S. Bureau of Mines under their Schedule 213 which is the required type protection as defined in Part 1910.93a, paragraph
(c) (2) and (3). A list of approved equipment under Bureau of Mines Schedule
19B as specified in paragraph (!) is also attached.
Your attention is also called to paragraph (c) subparagraphs (?) and (6) which require the establishment of a respirator maintenance program and the proper inspection, cleaning, repairing and storing of respirators. It should also be noted chat under paragraph (d) cutting or machining operations such as those which re used at many works for the cutting of Marinite or other asbestos products must be provided with local exhaust ventilation and dust collectors in accordance with American National Standard Fundamentals Governing the Design and Operation of Local Exhaust Systems, ANSI Z9-2 - 1971, and also that employees whose exposure results from the spraying of asbestos or the demolition of pipes, structures or equipment covered or insulated witn asbestos shall be provided with respirators of the type C positive pressure suppiied-air category approved under Bureau of Mines Schedule 19B. Paragraphs (e), (f) and (g) deal with the mixing of asbestos mortar, grout and plaster, the disposal of asbestos waste, and the cleanup of asbestos dust.
For your further information, we are attaching a copy of Volume 3, No. U, Winter, 1971, of the leaflet "Insulations Hygiene Progress Reports" which contain some very helpful recommendations for minimizing and preventing asbestos dust from becoming airborne in various types of industrial operations. Additional copies of this leaflet may be obtained by contacting directly the source of this publication.
0 ALCOA
APC 004630
industrial Hygienists December 23, 1971 Page 2 If you have any questions concerning this important matter, please do ro hesitate to contact us.
ROBERT P. CARTER RPC:lei TO: INDUSTRIAL KYGIENISIS cc: T. M. Brown, Pittsburgh - 2
E. C. Collins, Pittsburgh - 21 J. W. DeWalt, Pittsburgh - 2 W. B. Garyotis, Pittsburgh - 2 H. J. Goodyear, Pittsburgh - 7 O.P. R. D. Pulver, Pittsburgh - 21 V. W. Rieke, Pittsburgh - 2 H. F. Robey, Jr., Pittsburgh - 21 H. C. Sperry, Pittsburgh - 21 G. H. Farrah, EHL, ATC cc (letter only): Safety Directors (d)
APC 004631
Environ(.mMeonrtaatloSryotnea*
OM*V
of Tho City Unhwafty of Nw Yorfe
INSULATION HYGIENE
PROGRESS REPORTS
FROM THE INSULATION INDUSTRY HYGIENE RESEARCH PROGRAM
Irving J- Sllfcof(, M.D., Program Olreetor
Vol. 3. No. 4
Wlnlar 1971
Dust produced by uss of gn unvtntilatsd band taw. Without tha back light ing usad hart, much of tho dust would
not ba visibla.
Cutting pipe with band saw equipped with high-velocity, low-volume exhaust system. Compare absence of any air borne dust with that shown in uncon trolled cutting (picture left.)
--Shipyard Procedures Guide--i
Helps All Insulation Men
The Winter 1970 issue of Inaulation Hygiene Progress Re*
Sorts announced a joint effort by the Inaulation Industry [ygiene Research Program, the U.5. Navy, the Department of Labor, and insulation manufacturers and contractors to control shipyard aabesloa dust exposures.
As part of that effort, Duncan A. Holaday and William B. Reitxe of the IIHRP prepared a procedures guide for shipyard .insulation application and removal. Beeauae of ita relevance To all inaulation work, portions of it are given in this issue of Insulation Hygiene Progress Reports.
A complete report was presented by the authors af the Inter* national Symposium on Safety and Health in Shipbuilding and Ship Repairing, at Helsinki, Finland, on August 30, 1971.
by Duncan A. Holaday
and WUllam B. Raitae
Tha general goal in all inaulation work should be to maintain a clean environment
Meaturementa of concentration* of asbesto* fibera ("dual counts") in the atmoaphere can be uaed to identify source* of contamination and to point out deficiencies in control method*. Primary reliance for control of ex posures, however, must be placed on faithful observance of operating rules.
Control of Asbestos-Ceotaininf Dusts by Usa of Substitute Materials
Substitution of material* contain ing reduced proportions of asbestos or no asbestos at all, is becoming more common in ship construction. Before a material is substituted for asbestos, however, two auestion* must be carefully considered: a. Has the substitute material been
tested? If not, it may turn out to be of the same or greater haxard than the material of known hasard. This sort of thing has hap*
Here Are Some of Many Ways to Reduce Dust
pened in other environmental situations. b. Does the new material meet engi neering specifications and will it perform adequately under condi tions of use?
Materials containing reduced amounts of asbestos have been used in the fol lowing applications:
a. Blanket and pad filling
Substitution of the proper types of other pad fillers not only re duces asbestos dust during fabri cation and installation but also tends to lessen the problems dur ing subsequent "rip-out". Addi tionally, asbestos cloth which has been treated with a dust suppres sant is available and its use should also be encouraged. There are re porta that much less dust will be produced.
b. Pipe covering and block
Serious consideration should be given to those products contain ing lower amounts of asbestos fiber. Several British firms have introduced asbestos-free calcium silicate block and pipe covering. To date, however, this material has not been adequately evaluated in the United States to determine how it will perform in use.
Reduction of Dust by Changes
in Work Methods
a. Mixing Asbestos Mortar
This operation has usually be'n done at the job site. While the time spent in mixing is quite short, considerable dust is pro duced. A tested method of control is to mix the mortar dockside under controlled conditions and package the mixed mortar in sev eral containers for transportation to the job site.
Mortar is also available packaged (Continued on second page)
APC 004632
Insulation Hygiene Progreat Reports
Vet. J. N. 4
Winter 1971
Procedures Used at Puget Sound Naval Shipyard
from the
Intulation Industry Hygiene Re search Program
Editor i W. J. Nicholson, Ph.D., Published at the Environmental Sciences Laboratory (Irving J. Selikoff, M.D,, Directorl, Mount Sinai School of Medicine of the City Uni versity of New York, New York, N.Y. 10029
Advisory Council of IIHRP
Irving J. Selikoff, M.D. Program Director and Chairman
E. Cuyler Hammond, Sc.D., Vice President, American Cancer Society, New York, N.Y.
Albert Hutchinson, General President, International Association of Heat and Frost Insulators and Asbestos Workers, Washington, D.C.
Fred L. Pundsack, Ph.D. Vice Presi dent, Research and Development, Johns-Manville Corporation, New York, N.Y.
PURPOSES OF THE INSULATION
INDUSTRY HYGIENE RESEARCH PROGRAM
(Continued from first page)
in several sizes of plastic bags which have a spout through which water is introduced. Sufficient wa ter is added to moisten the mor tar; after premixing, the bag is opened and the remaining water added. The carton in which the bag is packaged may serve as a mixing box and waste container
6. Pre-culling pipe covering and block in the fabrication shop
Hand-cutting of pipe covering and block should be kept to an absolute minimum. Bend sections, pipe cover lengths, and blocks, should be cut in the fabrication shop on exhaust-ventilated equip ment.
How the Navy Does It
At the Puget Sound Naval Ship yard, cut sections are dipped in water and then packed in plastic bags which are labeled to identify the location where they are to be used. The cut sections are still damp and relatively dust-free when they are applied and the plastic bags are available for use in collecting wastes.
c. Pre-scoring block*
Insulation blocks should not be scored at the job site. Blocks which have been pre-scored by the manufacturer can be pur chased, or standard blocks can be scored in the fabrication shop by
using an exhaust-ventilated ga ip saw.
j. Insulating pipe assemblies in the shop
Some pipe assemblies are quite intricate and are troublesome to lag while in place. A satisfactory method of doing these jobs, par ticularly during ship repair, which is employed by the Puget Sound Naval Shipyard, is to re move the assembly in conveniently sized sections and transpori them to the shop. Here the old insula tion is removed, any necessary repair of the pipes performed, and the assembled section re lagged.
Relag in the Shop
Not only is dust dispersion re duced, but it is much more con venient to re-lag the section in the shop than when it is in place shipboard. .Any insulation which is damaged during transport and fitting is repaired after the sec tions are in place.
e. Hand-cutting at job sites
Some hand-cutting at job sites is unavoidable. However, dispersion of dusts by these operations can be minimized. A portable downdraft table is used by the Puget Sound Naval Shipyard. This table
has folding legs so that it can be carried down companionways and set up conveniently to the work. A small industrial vacuum cleaner is the source of exhaust. Scrap is dropped into a plastic bag and a
(Continued on third page)
1. To develop improved methods for minimizing ex posure of insulation workers to dusts and fumes encoun tered in their work.
2. To disseminate knowl edge of these improved methods of dust control wherever they may be ap plied advantageously and to offer cooperation, advice and assistance toward their universal adoption.
High temperature mortar packed In plastic bag. Water is added to bag through spout and mortar moistened before opening. The moistened mortar is removed as required and mixing completed in shipping container. AH wastea are placed in container and
sent to disposal at and of shift
Procedure used at Puget Sound Naval Shipyard for handling bend sections. Sections are cut m fabrication shop, dipped in water and placed in plastic bag. Tha bag is then labelled with the job-site description.
APC 004633
Dampening fibrous glass blanket filler before cutting. Nota lataral draft hood in- which fabrication is done.
(Continued from second page)
dropcloth is placed on the deck under the equipment.
/. Fabrication of Pad* and Blan ket*
Pads for valves and machinery should be fabricated in the shop whenever possible. Amosite has been largely replaced by fibrous glass filling with covers of an asbestos cloth which has been treated with dust suppressants. As sn effective means for suppressing dust dispersion and collection, the fibrous glass blanket is unrolled, dampened and rerolled. This pro* cedure insures thst all the blanket will be dampened. The blanket and asbestos cloth shapes are cut in the lateral draft booth.
g. Housekeeping and Clean-up
Essential parts of a dust control program are housekeeping and clean-up procedures. Meticulous attention must be given to re stricting the spread of dust and larger wastea. Use of a dropcloth under a work area vividly illustratea how much waste would be distributed over the general area or to lower decks if one were not used.
Areas should be cleaned up at the lunch break and the ana of each shift, using an industrial vacuum cleaner to collect dust and small scrap.
In all possible instances, work men should clean up their own areas. Where work rules prohibit this, the clean-up crew should be under the direction and super vision of the insulation foreman to insure that proper attention is given to this important subject
Reduction of Dusts by Use of Local Exhaust Ventilation
a. Ventilation of Large Poster Tool*--Band Sate* Extensive use of band saws both in dockside fabrication, shops and, on board larger ships such as aircraft carriers make emissions from band saws a major source of asbestos dust. Control devices for such saws have been known for years and are relatively simle. Conventional low-velocity, igh-volume systems, using a negative pressure baghouse for air cleaning, are practical in a fixed installation fabrication shop. Because some degree of porta bility is desirable in a temporary shipboard fabrication area, a high-velocity, low-volume dust collection unit is desirable for
Portable downdraft table developed by Puget Sound Naval Shipyard for use shipboard. Lightweight industrial vac uum cleaner ia used as the air mover. Note plastic bag for scrap and drop cloth on deck.
such use; it may also be suitable for fixed installations. The sir mover is an industrial vacuum cleaner which pulls about 50 cubic feet of air per minute past the saw blade at velocity of more than 10,000 feet per minute. This system is a very efficient dust col lector. Units such as this can also be designed to control dusts pro duced by table saws and gang saws. ft. Ventilation of Hand Power Tool* High-velocity, low-volume collec tion systems control dust emis sions from most small power tools adequately. Saber saws for cut ting pipe covering and rotary
saws for cutting asbestos cement board are well controlled with these systems.
Control of Number of Workmen Exposed
o. Scheduling of Insulation Work Standard industrial hygiene prac tices call for insolating operations which contaminate the atmosphere with toxic materials. Areas where insulation work is being done under conditions in which dust might be created should be iso lated by non-flammable curtains or other means. Whenever possible, work should be scheduled to minimize the numbers of other tradesmen in the area. Ship con struction operations are more readily scheduled than are ship repair or ship-breaking jobs However, every effort should be made to keep the number of men exposed at a minimum. In par ticular, rip-out of old insulation should always be isolated and, if necessary, performed on an offshift. Trained workmen supplied with proper protective equipment should always be used for rip-out work and it should be scheduled for rapid completion.
Personal Protective Equipment
In addition to dust suppression and dust control procedures, personal pro tective equipment is often necessary to reduce exposure and limit the spread of contamination. The equip ment described below is used in con trol programs. a. Protective Clothing
Protective clothing is required to keep contamination confined to the work areas. One method is to issue disposable coveralls which can be removed when leaving the
(Continued on fourth page)
Use of dropcloth to contain wastes and facilitate clean-up.
APC 004634
A small industrial vacuum cleaner being used by a Local 62 asbestos worker for clean-up.
(Continued from third page) work area or some time prior to entering the locker room and - placed in plastic bags for disposal.
Resin Impregnated Paper
A satisfactory type of protective clothing consists of resin impreg nated paper coveralls. These are inexpensive and readily disposa ble. They prevent spreading con tamination to laundries and elimi nate pilferage. They are worn for one shift, then removed and placed in plastic bags for disposal with other asbestos-containing wastes.
b. Respiratory Protective Equip ment
Occasionally some operations gen erate so much dust that it is virtually impossible to maintain satisfactory atmospheric concen trations of asbestos fibers and respiratory protection must be provided to the workers. A variety of respiratory protective equip ment is available from which devices suitable for various situa tions can be selected. American National Standard Z88.3-1971, Safety Guide for Respiratory Pro tection Against Asbestos-Contain ing Dusts (obtainable from Amer ican National Standard* Institute, 1430 Broadway, New York, N.Y. 10018) should be referred to for detailed information.
Invisible Dust
It is emphasised that unsatisfac tory amounts of respirable dust can be present in tne air even though conditions are not visibly dusty. I. Air-supplied Respirators
Extremely dusty jobs, such as ripout of old insulation where dust concentrations are very high, re quire use of air-supplied respi rators which will deliver dean, dust-free air to a facepiece or hood. Two general types are available: air-line and self-
Saber saw equipped with high-velocity, low-volume exhaust system.
powered. a) Air-line respirators in which air is supplied to a hood, helmet or facepiece give the greatest de gree of protection. Air is fed to the facepiece from a compressed air-line. The air source must be located in an uncontaminated area and if the source is not specifically designed for breathing purposes, a temperature sensing alarm must be installed on the compressor or a carbon mon oxide monitoring device must be installed in the air-line.
Disposable Hood
Anti-freeze compounds should not be used in the compressor system; water vapor must be removed by dessicant and oil mists removed by a filter. A plastic, disposable hood has been developed by the Puget Sound Naval Shipyard for situ ations where a very high degree of protection is required. This hood and other similar ones are available commercially. The air line should be fastened to the hood with a quick-disconnect fitting.
Self-powered Respirators
b) Air-line respirators connected to a compressed air supply limit movement, and this limitation can be troublesome. Self-powered res pirators do not impose such limi tations, but they do add to the equipment the workman must carry and they also require care ful maintenance. 2. Particulate-filtering Respira tors There are several types of par ticulate-filtering respirators. Those with a half-mask facepiece are considered most suitable for use by insulators. Only those ap proved for protection against as bestos dust by the U. 5. Bureau of Mines should be used. These devices are recommended for use in situations where the atmos pheric concentration of asbestos fibers is at relatively low levels.
All the recommendations for res
pirator-fitting, training o{ work men and maintenance, det-tiled in Z88-3-1971 should be foll< wed.
a) Reusable particular-filter ing respirators A variety of reusable particulate filtering respirators are available. To insure proper fitting, several different makes should be avail able from which the workman can select one. No one model respira tor facepiece will fit all faces. Routine maintenance is absolutely necessary to replace clogged filler^ and leaking inhalation or exhala tion valves. Unmaintatned res pirators produce a false sense of security.
Maintenance Troublesome
b) Disposable particulate-filter ing respirators Operation of an adequate respira tor maintenance program can be troublesome and, if only a few men are involved, impractical. Disposable respirators are avail able which are designed to be worn for no longer than one shift and then discarded.
Education and Traininf
No dust control program can be effec tive unless workmen and supervisors understand the hazards associated with the jobs, the sources of the hazards and the reasons for following recommended procedures carefully. Understanding is only obtained by education of personnel and training in correct operating procedures. For an education and training program to be successful, both management and labor must be concerned and partici pate. As with all safety programs, it is essential that first-line supervisors be interested in and cooperate in the work.
The harmful effects of neglect of pro cedures for controlling asbestos dust are not apparent for many years. Therefore, it is more difficult to con vince workmen and supervisors of the necessity of following rules for working with insulating materials than if more obvious physical haz ards were involved.
Education in hazards associated with use of insulating materials and in struction in correct work practices should be included in apprentice training programs.
PHOTO CREDITS: Pg. 1, I.l.H.R.P.; pg. 2, Ryder Industries and Puget Sound Naval Shipyards (P.S.N.S.); p. 3, P.S.N.S.; pg. 4, I.l.H.R.P. and P.5.N.S.
APC 004636
RULES AND REGULATIONS
23207
To b< ft valid assay, the percent column recovery mould be 100-2 percent.
(4) identity. Proceed u directed in 1141.521 of thla chapter, using a 0.5 percent potassium bromide disc prepared aa described In paragraph (b)(1) of that
action. (7) CrysUtUinitw. Proceed os directed
in I 141.504(a) of this chapter.
| lS4g.ll . *l nocyfline hydrochloride
capsules.
() Requirements tor certification-- a} Standards of identity, strength, quality. and purity. Minocycline hydro chloride eapeulea axe composed of mino cycline hydrochloride end one or more suitable and harmless lubricants and dil uents enclosed in a gelatin capsule. Each capsule contains minocycline hydro chloride equivalent to ioo milligrams of minocycline. Its potency is satisfactory If it is not tees than 90 percent and not more than 115 percent of the number of milligrams of minocycline that it is rep resented to contain. Its moisture content is not mare than 12 percent. The mino cycline hydrochloride used conforms to the standards prescribed by i I50g.l(s)
(1). (2) Labeling. It shall be labeled In ac
cordance with the requirements of I 148.3 of this chapter.
(3) Requests far certification: sam ples. In addition to complying with the requirements of 1148.2 at this chapter, each such request shall contain:
(I) Results of tests and assays on: (a) The minocycline hydrochloride used In making the batch for potency, safety, moisture, pH. minocycline con tent, Identity, and crystallinity. (b) The batch tor potency and moisture.
(II) Samples required:
(e) The minocycline hydrochloride used in making the batch: 10 packer * each containing approximately ) milligrams.
(6) The batch: A minimum of 30 capsules.
(b> Tests sad methods of assay--tl) Potency. Proceed as directed in 1141.111 of this chapter, preparing the sample for assay as follows: Place a representstive number of eapeulea into a high-speed glass blender Jar with snfflcienl 0.1W hydrochloric add to give a stock solution of convenient concentration containing not lea than 150 mterograme of mino cycline per mllUllter (estimated). Blend for 3 to 5 mlnutee. Remove an aliquot and further dilute with Q.lJf pofsaimu phosphate buffer, pH U (solution 4), to the reference concentration of 8.100 mlcrogram of minocycline per milliliter
(estimated).
( Moisture. Proceed se directed in 1 141.542 of this chapter.
Date supplied by the manufacturer concerning the subject antiMotis have beat evaluated. Since the conditions pre
requisite to providing for Its certification have been complied with and since not delaying in so providing is in the public Interest, notice and public procedure anl delayed effective date are not prerequi sites to this promulgation.
Effective date. This order shall be ef fective upon publication In the Federal Reoistix (12-7-71).
(See. 507, 54 Stat. 453. u Amended; 21 US C. 367)
Dated: November 21. 1971.
H. E. Sihmohs, Director, Bureau of Drugs.
[FR Doc.71-17773 Filed 12-5-71:8 :45 *m|
Title 29--LABOR
Chapter XIII--Bureau of labor Standards, Department of labor
PART 1518--SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION
Standard for Exposure to Asbestos Oust
Pursuant to section 4(b)(2) of the Wllllams-Stelger Occupational Safety and Health Act of 1970 (84 Stat 1592. 29 U.S.C. 653). i 1518.55 Of Title 29. Code of Federal Regulations, la hereby amended in the manner indicated be low in order to prescribe a new stand ard limiting the exposure of worker* to asbestos dust The new standard limit ing the exposure of employees to asbes tos dust is that adopted under section 8(e) of the Williams-Steiger Occupa tional Safety and Health Act of 1970 and published in the Pisxxol Rxostxx on this date. The standard la hereby de termined to bo more effective than that presently provided under 11518.55 to the extent that it prescribes minimum levels of exposure to asbestos dust. Therefore, by operation of section 4(b) (2) of the Act the new standard issued under section 8(e) supersedes tbs con struction safety standard relating to ex posure to asbestos dust
Section 1518.55 is hereby amended by adding a new paragraph (e) thereto. As amended 11515.55 reads as follows:
11518.55 Coses, vapors, fames, dusts, and mists.
(o> Paragraphs (a) and (b) of this sec tion do not apply to ths exposure of em ployees to airborne asbestos dust. When ever any employee la exposed to elrborne asbeetas duet, the requirement* af 1 1910 93a ad this title shall apply.
Effective date. This amendment aboil beoome effective upon publication In the Fxdxuu. Rscjenn (12-7-71).
(Sea 4(b)(9). *4 Stat. 1501 9t UA.C. 551 gtwetftiy** Order Wo. 10-71, SO PA VT84)
Signed at Washington, D C., thla 2d day of December 1971.
O C. GCXNTHER. Assistant Secretary o1 Labor.
1FR Doc 71-17835 Filed 13-5-71.8 47 Am)
Chapter XVII--Occupational Safety and Health Administration, De partment of labor
PART 1910--OCCUPATIONAL SAFETY AND HEALTH STANDARDS
Emergency Standard for Exposure to
Asbestos Dust
Pursuant to section 6(c) of the wullams-Stelger Occupational Safety and Health Act of 1970 ( 84 Stat. ISM. 29 U.3.C. 655), Part 1910 of Title 29. Code of Federal Regulations (36 Pit. 10466. May 29. 1971) is hereby amended In the manner indicated below in order to pro vide an emergency standard dealing with the exposure af employees to asbestos dust.
In light of increasing information on the results of exposure of employees to airborne asbestos dust, including recent studies by the National Institute for Oc cupational Safety and Health and others, and recommendations by the American Conference of Governmental Industrial Hygienists (ACOIH), it is hereby deter mined that (1) exposure under the pres ent standard for asbestos dust in Table 0-3. I 1910.93. of 12 fibers per milliliter greater than 5 microns in length or 2 million particles per cubic foot of air, which Is derived from an established Fed eral standard promulgated under the Walsh-Healey Public Contracts Act on May 20,1969, constitutes a grave danger to employee* exposed to this 8-hour time-weighted average concentration: and that (2) an emergency standard is necessary to protect employees from this excessive exposure. The National Insti tute for Occupational Safety and Health concurs that the proposed change la the asbestoe dust standard recommended by the American Conference of Governmen tal Industrial Hygienist* should be the substantial base for the emergency standard.
Action concerning the standard will be commenced under section 6<b> in the Immediate future. Any notice of propoeed rulemaking under section 6(b) will give notice of the emergency standard as a proposed rule and also of any ap propriate subsidiary proposals which may be required under subparagraphs (5) and (7) of section 8(b) relating to the ex posure of employee* to toxic substances.
Part 1910 Is amended as follows:
1. Table 0-2 following 11910.93 (38 PA. 15104, Aug. 13, 1971) 1* hereby emended by deleting the following:
Asbsetoe--12 abate per mUiUltw greater thaa * aslsrooe ta length or...............s tipper.
TIWMIW......___ ... 6 tipper. 30m*vU*
*3(0,
ffe-gte -- g
HMtAi noma. vet. 34. no. im--iwuoav, okimm y, mi
APC 004636
' 232U8
RULES AND REGULATIONS
I ' j unended. Table G-3 reads as follows:
Tuls o-s--UiNiSAt Dim
gnbuuos
Mpecf K*/Mi
Blllce: CrTfUUlTVi: Quart* (reeplrebfo)
' Quart* (total du*t)
Crt*ioboMe: Um Htbe TftltM etlcuitwl nB to* ooojdc or moss formulaa for
T^SrSu: CwJ4tbvhie troa tbo for*
malM for quarts. AmnrpElQUJ IndudlOf OOfOnl
dletomeceou* eoftb................
2*0 t 10mi/Ht m
%8lOH-ft ..................
%180i0O0i+(12
*&S|0+2
`"cSIOi
BlUtoeiolisteef *OUeak*et)h: is err*' ; Mia........................
' Sooprtoo#........................ Portland eoment..................
Orapblto (aotural).................. Coal diut (resplrobl* treetloo
km then 6% 81Q>............... For more than h% 8lO*..........
Inert or Nuisoac* Dust: R*ptrebl traction___ Total dust..........,........
30
JO 80
It ?40C M lOorrng/M1 %3iOt+2
IS Smj/M1 ftO Iftmc/M"
Not*1. Cotwnioo teeton--> mppc/XMJ-miUloQ particles per cubic meter
particles per i- <*.
MUllens of particle* per cubic foot of elr. based on tmpl&c*r mmples counted by Ugbt-fleld technics.
> The perceniece of crystalline slllco In the formula ts the amount determined from air-borne samples. * eept to those lnsuacee la which oth er methods beet been mow* to be applicable.
t As determined by the membrane Alter method at 49Xphai contrast mafftiflcatlon.
Both oonoeotrotton and percent quarts for the applK esiloo of thts limit aro to bo determined from the fraction paiidne a itse-selector wuh the following characteristics:
Aerodynamic diameter (unit deadly epfeertj
7 l. 1
*; . 3 3
ft 0 10
Percent passing selector
90 Tft SO JS 0
Tbs measurements under this note refer to the nae of on ABC Instrument. If the respirable fraction of oosJ don Is determined with a M RI the figure corresponding lo that of 2.4 Mg.'M* in the loble for oool dust is 41 M|/M,
1. A new I 1910.93a la added to Part 1910. The new i 1910.93a read* ae follows:
g 1910.93a Aibclwduat
(a) The 8-hour time-weighted aver age airborne concentration of aebeetoo dust to which employee* are exposed shall not exceed 5 fiber* per miUlbter greater than 8 microns in length, as de termined by the membrane* filter method art 400-450X magnification <4 millimeter objective) phase contrast Illumination. Concentrations above 5 fiber* per milliliter but, not to exceed 10 fibers per milliliter, mar be permitted up to a total of IS minutes in an hour for up to S hour* in an 8-hour day.
(b) Engineering methods, such as but not limited to, enclosure, vacuum sweep.
Ing, and local exhaust ventilation. OtaH
be used to meet the exposure limits pre comply with the requirements of these
scribed in paragraph (a) of this section. subparagraphs relating to the operation*
Where such engineering methods are not involved. The requirements of this para
feasible, or do not otherwise reduce the graph are tn addition to those prescribed
concentrations below those prescribed In In paragraph (b) of this section.
paragraph (a) of this section, respira (2) All hand- or power-operated toolj
tory protective devices shall be provided which produce asbestos dust such as. but
and used In accordance with paragraph not limited to. saws, scorers, abrasive
(c) of this section.
wheels, and drills shall be provided with
(c) (1) (D When the limits of ex local exhaust ventilation and dust col
posure to asbestos dust prescribed In lectors in accordance with the American
paragraph ta> of this section are ex National Standard Fundamentals Gov ceeded and when engineering controls erning the Design and Operation of Local
required by paragraph (b) of this section Exhaust Systems; ANSI Z9.2--1911.
are not feasible or do not otherwise re duce the concentration of asbestos dust below those prescribed in paragraph (a) of this section, the employer shall re quire the use of respiratory protective de
vices. The selection of respiratory protective devices shall be limited to those specified in the remaining sub paragraphs of this paragraph (c).
(11) The employer shall require that
each employee test his respiratory pro tective device before each use in order to insure a proper fit according to the manufacturer's instructions. "Hie em
(3) Employees exposed to the spraying of asbestos or the demolition of pipes, structures, or equipment oovered or in sulated with asbestos shall be provided with respiratory protective devices in accordance with paragraph (c) (4) of this section.
(e) Asbestos cement, mortar, coatings, grout, and plaster shall be mixed In closed bags or other containers.
(f) Asbestos waste and scrap shall be collected and disposed of In sealed bags or other containers.
ployer shall further provide for effective (g) All cleanup of asbestos dust and
training or supervision of employees in blowing shall be performed by vacuum
the testing of respiratory protective de cleaners. No dry sweeping shall be per
vices for fit before their use.
formed.
(2) For an atmosphere containing not 3. Section 1910.12 ts amended by
more than 25 fibers per milliliter greater changing paragraph (a) In order to apply
than 5 microns in length over an 8-hour the emergency standard prescribed In the
average, or more than 50 fibers per milli new 11910.93a, which is published in this
liter over any period of 15 minutes, a document, to construction work which is
reusable or single-use filter type respira subject to the Act. The amendment is tor. operating with negative pressure necessary In light of the rule of regula
during the inhalation phase of breathing, tory construction set forth tn i 1910.5tc>.
approved by the US. Bureau of Mines As amended. I 1910.12 reads as follows: under the provisions of 30 CFR Part 14 (Bureau of Mines Schedule 21B), or a 1910.12 Construction work.
valvelese respirator providing equivalent (a)(1) Adoption and extension of es
protection, shall be used.
tablished safety and health standards
(3) For an atmosphere containing not for construction. The standards pre
more than 290 fibers per mill11ter greater scribed by Part 1518 of this title and in
than S microns tn length over an 8-hour effect on April 28. 1971, are adopted as
average, or more than 500 fibers per occupational safety or health standards
milliliter over any period of IS minutes, under section 8(a) of the Act and shall
a powered filter positive pressure res apply, according to the provisions
pirator approved by the US. Bureau of thereof, to every employment and place
Mines under the provisions of 30 CFR of employment of every employee en
Part 14 (Bureau of times Schedule 21B) gaged tn construction work. Each em
shall be used.
ployer shall protect the employment and
(4) For an atmosphere containing places of employment of each of his
more than 250 fibers per milliliter employees engaged In construction work
greater than 5 microns In length over by complying with the appropriate
an 8-hour average a type C positive pres standards prescribed by this paragraph.
sure supplied-air respirator approved py
the UR. Bureau of Mines under the pro visions of 30 CFR Part 13 (Bureau of Mines Schedule 19B) shall be used.
(5) The employer shall establish a respirator program In accordance with the requirements of American National Standard Practice for Respiratory Pro tection Z88.2--1969.
(8) The respirators provided each em ployee shall bo properly inspected,
(3) The standards prescribed in 11518.58(0 of this title shall apply in the case of the exposure of any em ployee In construction work to airborne asbestos dust.
tffectiva date. These amendments shall beoome effective Immediately upon publication tn the Ftsnui. Rrotrrr* (13-7-71).
cleaned, repaired and stored.
(See. *(e). 54 gut. UM. 29 04 C *54: Sec
(d) (1) When an employer has em retary** Order No. 11-71. I* FJt *7M)
ployees who are exposed to asbestos dust exceeding the limits prescribed la para graph (a) of this section and tha ex posure results from the operations dascribed in ttao remaining subparagraphs
Signed at Washington, D C., this 3d day of December 1971.
O. C. Gem mss. Assistant Secretary of Labor.
of this paragraph <d>, the employer shall (FB Doo.71-17**S riled U-S-tl;1.4T em|
HMU1 MMIR VOC 34, NO. 334--WIWAV, DICBW T, I*T1
/>,pc 004637