.. APPLICATION FOR PROPERTY APPROPRIATION ' *
Cement Asbestos Products CoapanyPliBt
lagland #7909
or
.............. Unit
DESCRIPTION:
t
To provide a live bottom fiber bln and enclosed screw conveyor, and allied
equipment to replace the open type conveyor as originally supplied.
See Addendum page for explanation of details.
..
If vork contemplates replacement or improvement of structures or^equipment so*
is piece, insert:*!.Original cost SAA*7A./A?. 2.Date erected or installed.
t
Total estimated cost (FORM 302A ATTACKED)
Estimated annual net saving
S.......... .
Estimated completion date
.VjU..
1976..
ADVANTAGES TO BE DERIVED:
35,000.00
The present method of conveying Asbestos by an open conveyor belt and feeding the
belt by an open type feeder plate cannot be enclosed and vented so that it will
meet OSHA requirements. While there will be intangible benefits and reduced mechanical downtime with the new system, the expenditure Is necessary In order to meet OSHA regulations.
Jsi.St. ReVv.ieUw.edB, ebays..l.e.y.,..V.i.c.e. Pre
Approved by..
Account Chargeable to
Vroller
M&ti*Recommended by
.....
Vice President Engineering A Operat
Senior Vice President
iftabJUFby.......... !
Approved by Board of Directors
................................................... 19....
ooooooom MMMIH
CAPCO ALV 0035031
.1 -
I iMt III*
: r<
r. JOB--------------
** Rib**.
*Bin
and
Teed
Screw
JOB NO.
AUTH. NO. ------
COST
ESTIMATE
Ccaent Asbestos Products Co.
FLANT
Ragland Riant #7909________
DRAWING NOS.
* sou* CLASSIFIES MATES.1AL
CST*D. LIFE
CAEQTSMETFL90. .
UNIT Mflltl i
FSICES
UIN
i!- xAder oin-v/iive bottom
10
11f-- Cyclone Sen..Rotary Valve & (Drive
10 10
: Welch hoooer A dl*thr# *n mu
10
i Material Rtnrlllne
9
j-
Rollergang discharge hopper live hot Labor -- Tnt**11 **4/**
contingency 10Z
1I2I Zr M 1
tl II
1 tl
i
*6 months from date of approval
.
ESTTMMCb'COST
Iflllli
in non op
--a.'rnnn of}
, ESTTOIMTAATLED '| COST
---- noo A*
3,nnft on t snn no
2,000.00
/. AA AA A 1 1A AA
Total
34.870.00
i
1 1
1
1 I.
1
1
-- 71 !
-. `
1
<
-------1
.
--
"I
H 1
nr 4-
----------------
CAPCO ALV 0035032
1
/
" ** 2 .
Addenda to Appropriation fcAX-219
S
V '*
* '' ,,
As part of the'sdxlng spates originally Installed at England, the Asbestos fiber
is aetered onto an open conveyor belt.'. The disc feeder, is the bottoa of the bin,
bas been the course of considerable dowhtlne, and is addition, it creates dust
Is the ataosphere as it discharges. This is the European aethod of nixing and
soae of their later plants have erected a vail to Isolate the aixing systea froa
the rest of the plant. This isolation aspect has been reviewed thouroughly and
has been rejected in fsvor of.the enclosed live bottoa bin and screw conveyor
(both of which will be vented to 'the existing dust collector).
The new bin and support steel has been designed so it can be erected in a : straight line between the turbopulper and the center of the pipe aschine. In addition to laproving the operation, this will allow aost of the equlpaent to be pre-ereeted, and reduce the tlae to change over to approxlaately 2 to 3 weeks. This aethod of erecting the equlpaent vithout interference to the operation Is preferred and allows check out of the aotors, controls, etc., prior to change over. In addition, all guarding can be installed together with safety catwalks, adequate lighting, painting, etc.
As the original equlpaent has been in operation over 11 years, the salvage value
will be Halted to aotors and a rotary valve. These lteas '.will be repaired and used as spares for the enclosed system.
A
j
I I
j i