Drafted Date:19 November 2021
Finalized Date:1 December 2021
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Larry's Salvage
From:Andrew Spejewski, Enforcement Officer
Thru:Alex Rosenberg
To:File
I. Facility Information
A. Facility Name:Larry's Salvage
B. Facility Location:75 Fortune Rd
Bradford, NH 03221
C. Facility Contacts: Larry, McDonald
75 Fortune Rd
Bradford, NH 03221
603-938-5656
Cfmcd62@yahoo.com
D. NPDES ID No (s).:No permit is in effect; the ICIS tracking # is MAU000505
II. Background Information
A. Date(s) of inspection: November 18, 2021
B. Weather Conditions: Dry, clear
C. US EPA Representative(s):
Andrew Spejewski
D. State / Local Representative(s): none
Federally Enforceable Requirements Covered During the Inspection: Multi - Sector
General Permit for Stormwater Discharges from Industrial Activities.
ED_019088A_00019820-00001
F. Previous Enforcement Actions: A CWA Section 308 information request was sent
to the owner in August 2021. No reply has been received.
III. Type and Purpose of Inspection
Evaluation of compliance with (and / or applicability of) the Multi - Sector General Permit
for Stormwater Discharges from Industrial Activities.
IV. Facility Description
The facility is a scrap metal yard. It is located at the end of a dirt drive going south from
Fortune Road and crossing a stream before entering the facility.
The yard includes a concrete pad with an open - walled roof, a small office building next
to the pad, and several sheds and shipping containers used for storage on the other side of
the pad and across a small open yard. The rest of the facility is scrap metal storage.
The center of the site is fairly flat, but otherwise slopes down to the north across the
entire site.
A small sawmill area is adjacent to the facility to the east.
V. Inspection
Mr. Spejewski arrived unannounced at about 9:30 AM. Entering the facility and parking,
he met Larry McDonald who described himself as the owner of the facility.
A. Opening Conference
Mr. Spejewski presented his credentials, provided a copy of the Small Business
Resources Information Sheet, and explained the purpose of the inspection.
Mr. McDonald said he had received questions in the mail from EPA (and a phone
message about them) and had given them to a consultant to answer. Mr. McDonald said
the consultant apparently was very busy at present and was difficult to get a hold of. He
said he would try again to get the consultant to respond.
Mr. McDonald described the site. He said the small portable sawmill operation to the
east, immediately adjacent to the scrapyard, was not his and run by someone else.
Mr. McDonald said he was visited regularly by assistance groups from the state, who
usually recommended some minor (or very minor) improvements but have never fined
him.
2
ED_019088A_00019820-00002
Mr. McDonald said he occasionally took cars or other vehicles; all fluids were
immediately drained at the lift on the concrete pad (below the roof). He does not take
metal shavings or anything with PCB, asbestos, or other hazardous materials. Batteries
are stored inside a roofed storage area
B. Facility Tour
The two toured the site. The entrance drive led steeply down from the center of the site
towards the site entrance (and beyond that the stream). On either side of the drive (on top
of a retaining wall on one side) was metal storage; it appeared some drainage from those
areas could travel to the drive.
A high (roughly six feet) earth berm was along the north (downhill) border of the site on
each side of the entrance drive. The berm was mostly overgrown with small trees.
Mr. McDonald pointed out a flattish area next to the drive just outside the berm with
some sediment deposits; he said the road drains to that area and he usually removes built-
up sediment from the area about once a year.
The berm extended to the northwest corner of the site; it appeared that drainage from the
site could travel around the west end of the berm and into the wooded area downhill of
the site. There was no berm along the west side of the site, which was close to the level
of the surrounding terrain, with some metal piles near the edge of the site.
A dirt drive led up around the southwest corner of the site and back towards storage areas
along the south side. Mr. McDonald pointed out a ditch that collected drainage from the
road and led it off site; the ditch led all the way from the storage areas along the south
side of the site. Drainage from the southern scrap metal storage areas appeared to flow
through this ditch and off - site.
To the northeast, the high earth berm extended to the northeast corner; it did not appear
any drainage led off to the northeast.
Mr. McDonald pointed out oil storage, housed within a rain proof shipping container.
There were two containers, about 200-250 gallons each. Mr. McDonald said there was
never capacity for 1,000 gallons or more.
C. Records Review
No records were reviewed.
D. Closing Conference
Mr. Spejewski noted that the site appeared to be in a SIC code subject the MSGP, that
industrial activities were exposed to stormwater, and that the site at present appeared to
discharge. Mr. Spejewski noted that if the berm were extended to retain all stormwater
3
ED_019088A_00019820-00003
on - site, there would be no need for permit coverage; otherwise the site appeared to
require MSGP coverage.
Mr. Spejewski asked if Mr. McDonald had an email address for EPA communications
(such as mailing a copy of the inspection report). Mr. McDonald said he did not, but EPA
could contact him through his wife's email address (as above in this report).
Mr. Spejewski then thanked Mr. McDonald for his time and left the site.
Picture List:
[Note that the camera was set to Eastern Daylight Time, and the inspection took place
during Eastern Standard Time, so the timestamps are one hour later than the actual (EST)
time.]
IMG 2577.JPGFacing down entrance drive
IMG 2578.JPGFacing west along berm west of entrance drive
IMG 2579.JPGFacing east along berm along north side west of entrance
IMG 2580.JPGNorthwest corner of site, end of berm
IMG 2581.JPGWest edge of site, facing south
IMG 2582.JPGSouthwest edge of site, facing south
IMG 2583.JPGFluid draining area
IMG 2584.JPGOil storage shed
** END **
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.