Document OEp1rLZdy9LBB2YQOX1Nz9eZ1
DEPARTMENT 246 - 254
i960 OBJECTIVES
I. SAFETY AND HOUSEKEBPINO
A. Have no lost time accidents In i960.
. B. Develop a program for housekeeping control to keep department In above standard condition at all times.
II. OROWTH
A. Achieve a new production record In all departments.
B. Achieve a 600,000 lb./month rate In Dept. D-254 by July 1.
C. Achieve a 750,000 lb./month rate by December 31, I960 with new equipment installed and operating.
III. OPERATIONS CONTROL
A. General 1. Revise all files to make them more usable. 2. Enoourage employee suggestions and Improve follow-up. Do this by asking for suggestions when making the monthly safety Inspection. 3. Improve the Performance Index by $10,000 per month as oompared with 1959 for 254-246 oomblned. 4. Study and take Indicated action to reduce the overtime Inherent In these Jobs:
. (a) Packer 246 (b) Repairman 246-254 (cj Other Jobs In 246
B. Dept. 254 1. Develop a system for Improved caustic concentration control and reduction of excess caustic charged In PNP operations. 2. Install automatic acid addition for acldlflers.
C. Dept. 246 1. Improve scheduling for the department to make It a more routine problem; to get longer runs on one Aroclor; to Improve customer service. 2. Revise operating instructions and operating data sheets. 3. Improve our knowledge of making Pyranol l4fo and Pyranol 1488 to meet specifications and Incorporate that knowledge In the Operating Instructions and Process Description.
MONS 036895
- 2-
.4 Improve Aroolor color (the best general Indicator
of overall quality). Investigate a color indicating
or recording Instrument.
5. Complete Installation and achieve proven satisfactory
. operation of the new off-gas system.
6 Develop control of Diphenyl moisture.
1:
Complete program for cooling water temperature control. Revise the Diphenyl head tank.
9. Revise the present still bottoms handling system and
. start complete draining of still bottoms.
10 Study still coll and still pump changes to minimize
this source of downtime.
.11 Achieve still rate control.
.12 Improve gas control to chlorlnators.
13. Improve ohlorlnator temperature control, l.e. possible routine Jacket cleaning.
14. Improve Perrlo Chloride catalyst handling.
15. Improve specific gravity measurement for chlorlnators.
17. PERSONNEL
A. All salaried personnel to have performance reviews not more than one year old.
B. Review objectives with foremen May 1, August 1 and November 1. C. No more than four 3rd level grlevanoeB.
V PLANT IMPROVEMENT
A. Improve finished goods storage facilities in Dept. 254 by adding to the warehouse area.
B. Submit a projeot for an Aroolor storage tank by May 1, i960.
C. Rebuild the roadway between Dept. 254 and 246.
D. Remodel the office In Dept. 254.
E. E. Martin
fa
mh
HONS 036896
E. F. ABEOQ'S I960 OBJECTIVES
1. Inorease PNP reduction to 620,000#/mo. by July 1st and 750,000#/mo.
by January 1, 1961. fa) Revise storage facilities to reduce the overtime on car unloading. (b), Follow-up installation of PH controller and recorder to Improve
aoldlficatlon step.
(0) Inorease steam and water lines to reactor colls for faster heating and better temperature control.
fd) Install automatic valves for vaporized oooling. (e) Reduce reactor batch cycles from 5 1/3 hours to 5 hours. (f) Investigate bulk handling of PNP finished goods.
2. Follow Triphenyl Phosphite process for better quality control. (a) Shorten batch cycle to inorease production from l65,000#/mo. to 200,000#/mo. on 5 day/wk. (b) Install Karbate condenser and glass line receiver to Improve oolor quality.
'
3. Improve lighting facilities in department for safer working conditions.
4. Improve on better housekeeping to up-grade to above standard.
5. Improve packaging facilities and palletizing of both PNP and TPP.
036897
j<L Sm rrti
uwrnrrs i960 objectivbs
Eliminate overtime wherever possible. Keep a cleaner department. Increase efficiency of stills by renewing or repairing furnaces. Attempt to further reduoe downtime on ohlorlnatore due to off-gas line plugging and related equipment. Attempt to get back lnerteen business taken over by Anniston. Attempt to further reduoe minor accident rate In department. Attempt to get the wood loading dock on track 10A replaced with a steel dock. Also get a loading dock for tank trucks. Cheok the possibility of Installing a 3rd still to reduce downtime on product change over. Get two more 16,000 gallon storage tanks for more efficient handling of finished goods.
MONS 036898