Document OEmVMRyyDQxMMo6VgrDjjKoEL
FILE NAME Manville JMA
DATE 1944 DOC JMA194
DOCUMENT DESCRIPTION Report - Gulf Shipbuilding Corporation
Alabama 1944
_NICKSTRIAL MYJISKE OLF BRIBILIS BRIBILIS CORPORATION
CHICLS1 % AL
we 4 have ik
DS3X CONSULTANTS
J KOIGI NO
MAIMLAEIDLEMDAILED
DIAS
DIAS
DIAS DIAS
PP RRII PRN INN T TT
COLLISION COLLISION
COMMON Bee ae MEANENTRUMEANENTRU SAAT
M^ MEANENTRU MEANENT5RU 7 **** M^ M^ ******* ******* *******
******* *******
*
ary
57 159159
STRUCTURES 10 Adnarsee
King Er Panel 3.
Washington D o.
The following persons were interviewed or contacted during the course of this surveyi
Er Harry Hill President and Oeneral Manager
Captain M. E. Anthony Assistant to the General Manager .
WP MAX Harrison Personnel Director ;
Mr. Earle Smith Safety Director
Mr. Clyde Walk~-rDay Shift Safety Supervisor Commander V. N. Davis USN Assistant Supervisor of Ship-
building USH
Lt. Ig J. K. Austin USNR Security Officer USN Mr. Ludwig Sheet Metal Foreman Mr. B. C. Possy Sheet Metal mizan
;
Mr. Griffith Electrical Superintendent
Mr. A. H. Townsend Assistant Manager Cafeteria
References
a
Minimum Requirements for Safety and
Industrial Health in Contract Ship-
yards U. S. Navy
Department - U. 8
Maritime Commission United States
Government Printing offic Nashing-
ton 1983
Industrial Health Survey by Dr. Philip Drinker et al August 12 - 13 1962
c Industrial Health Resurver by Charlas H. Mc0ill Surgeon U. 8. P. H. 3. July 7 8 16 1963
The services of the Regional Health Consultant are
available upon request to the Regional Construction Offico U. 8. Maritime Commission 549 Baronne Street New Orleans 13 Louisiana
The average number of employees for the month of
,
4,
February 1944 was 0,590 The total number of man hours
during worked
the same month was 1,697,092
during
The yard has three types of contracts
For the
navy three destroyers and sloven minesweepers are being
completed at the wet dock four minesweepers are yet to
be built For the Maritime Commission vessels of the
C2-3 type are being constructed - two are on the ways
and two at met dock Under a Maritime Commission subsidy
contract for the United Mail Line refrigerator ships of
type AUI are being constructed - three even on the
178
Qa
GENERAL RECOLELENDATIRECOOLELENNDATSIONS
Seation numbers refer to and correspond with those
those in the in reference
body of a
this
report
1. Cjean the toilets in the Plate Shop Section 9.2
2 Provide mah basins industrial skin cleanser and
towels at the various tollet rooms for men
These need
not be inside the buildings They could be placed on
flooring outside the buildings and covered by a roof
Section 3.2
3. Supply hot water to the proposed cleaning basins for
respirators and goggles in the Safety Store rood Section
10
4. Return all used respirators from the various rosm
to the safety store for cleaning and sterilizing before res
issue Section 1-10
5. In the interest of attaining more faithful use of respirators by scelers and buffers make available to them a choice of reveral types of approved dust respirators Section 11.1 5 Stricter enforcement by supervisorn of the wearing of eye protection by those most exposed to eye hazards should
be put into #ffect Section 13.2 7. Show the sound film Eyes for Victory to all
supervisory Personnel and to now hires Section 2-13.2
8 Show the Blund film elders - To Your Health
to welding department supervisors for the purpose of is proving the use of local exhaust hoses by welders in con-
fined spec3 Saption -13.8
9. on the lowering shop materials
before cutting whenever possible Section
20.
Good
housekeeping should be observed in housekeeping
Q
covering
shop and debris should not be allowed Reason
5-13.7 5-13.7 Improve
skiing facilities in promote their use by electrical lane regularly
and resistant poured cable Additional lever equipment
should be required
titled titled
H- Sanitary Moiljojen
0.1 Fooding
a,
In January of this year operation of the plant
cafeteria was taken over by the shipyard mansgment Ur
V. Cadanbaad a former ship's stovard and hotel manager was placed in charge Under his direction conditions
have improved markedly and the public health rating of the cafeteria as giran by inspectors from the State Health Department has risen from 46 to 20. Vambers of the Health Department make inspections once or twice each month
A survey of the cafeteria facilities disclosed
no objectionable or Inasnitary conditions At the present time the onfeteria c rpares favorably with the best ob-
serted serted ^finnumerous shipyards and the officials responsible
for improving the operating conditions are to be commanded
for their actions
9.2 Kater supply cevarage and waste disposal Water supply and saverage disposal have been
covered in references b and c ^ rosurvey of existing toilet facilities in
the yard is being undertaken by management with a view to-
ward revising the facilitica both as to number and loca-
ion The continued employment of women and the shifting
of concentrations of employees to different areas has made
buch & Survey nece27177
& number of toilet buildings about the yard
ware Inapacted and with the exception exception of the men's toilets In the Plete Shop were found to be in fair condition Coursona in the Plate Shop had evidently not been olsaned
for odng timo One wa not in good repair and was in a
filthy condition Do waships facilities are provided at any of the
general yard toilet locations Washing facilities are provided in the large locker room outside the yard but otherwise nons in easily available for the large majority of yard workers Thus few of them have an opportunity to
mash up before taking lunch
10
Faspicato Proactive ggipmenit pment MBA Comfe metal fuse respirators are stocked
in the safety store the tool room of the Plate Shop and
in the supply room of the Paint Shop The Paint Shop also
stocks Bink and American Optical Company chemical cartelicgarteeligecartelige
respiratore Binks
masko and Pacco line koods
the
Plate
Shop
little attempt de made lo
claan and etarilize used respirators before they are re
issued The Paint Shop issues aquipment to individual
paintura who use the equipment until it is fouled up and
1484- the clearing and sterilising proceduras for
uzud razpirators use poor and do not satisfy Section 12
of reference
reference
a Recently a work order has gone through
For running water and a sink to be installed in the cafety
atore.
a
A supply of hot water to be used in cleaning +
the respiratory protective equipment was omitted from the
proposed plane Hot water is very essential for satia-
factory cleaning of the equipment prior to sterilisation
It is recommended that a source of hot water be installed
in the safety store
It is recommended therefore that all used
respirators be returned from the various tool rooms to
the safety store for cleaning and sterilizing by the
store attendant according to approved methods outlined by
section 12 of the Minimum Requirements ..y Properly
sterilised and repaired equipment can then be assigned back to the tool roons It is also desirable to package the
equipment after sterilization
By proper handling conservation and salvage
of equipment may be attained and the use of the equipment
by workers is encouraged
ll Jobs xequiring respiratory equipmen .
11.1
Duat
Metal Time Cumfo respirators are issued from
the Paint Shop to workers doing scaling and buffing
Bureau of Mines Approved dust respirators would be sufficient
and bagause of their somewhat lower breathing resistance
might be used more faithfully by buffers and sealers It
is suggested that several types of approved dust respiratora
oe
bu tried and the type auped for their use
preferred preferred
by the
word
11.2 Hotel ** and oko oko s
by wuldars wuldars
when their wolders on
Most use
of the metal fuss^,re pirators pirators Le kade kade
working under the shelter shelter cour the plata work involves involves galvanized galvanized steel Fow
the hells appear to use respirators
abop
A considerable exposure of nelders and bezero bezero
la present in the Sheet Hotel Ciob
xtales system
consisting
two Sever
of orinch flexivio flexivio retai
and exhaust hose for sich worker The The obs
hoess **
very very
each moldar or or
careful to keep the and of the sucker silcin
tance from the source of fuss
SSolovolnt voSnolvtont
vapoca
vapoca
vapoca
Spray painting is done to come extent in
on a large scele near the pickling Sank
ships
Spray men use stanical Gartridge
their exposure to mists and vapora le
the
heavily contaminated contaminated abispheres
lead Bin gause respiratora
Tasco line hoods
are
worn
under-
Respiratona
2-10 of this report
Bo
13 Prevention of Industrial Diseases
13.2 Aro flash and foreign body eye injuries
Out of a total of 3348 first ald cases reported reported
%,
:
~
during February there were 433 aro fleshsa and 1136
foreign : 08808 of
bodies in the eye
Eye cases thus constitute about 30 of the
total total new casos ; Host of these eye injuries are minor in charac-
tor It should be pointed out however that among th'n
|
there are many potential cases of lost eyes and certainly
the loss from even minor eye injurios - in reporting
4
to first aid for initial and treatmenta - is an iton to
be considered Enfornement by supervisors of the wearing
of eye mooded
protection by
to reduce the
those most expreed to eye hazards is
incidence of eye injuries It would
be helpful also to akow the sound film Zyes Por
Victory to all supervisory personnal and to new biros The film and record can be purchased from the National National
Saiety Council
13.3 Lead Poisoning
The spray painting with red lead prosents &
serious danger to those exposed to lead mists - not only to the painters timsalves but also to others in the Luntediate vicinity of spreying operations Painters 07
wear the protective equipment equipment equipment provided and the work should
be segregated as much as possible If it is necessary for
others to be in the vicinity of apray womt they too siculd
.
Quay probootive equipsant Exposuro of welders and
paint paint until welding has
13.6 Solvent vapo
been
completed
Ses section -11.3 of this report
13.5 Diao fuss fever Zine chilla
Tuore vure
cases
to the fira #id station during
none
none
airing
airing
airing
vey
Axe
On board the hulls it was noted
wolds working on Calvanized steal wordcerful
the local dust ventilation hoses within
from their arc Continued supervision
welders about the proper use of chavet vanition insure a low incidence of matul Juma VT #ICON
xhaust hoses if the openings openings are
2
15 the arc will remove celly
cluded
kept sich & to
%
100 of
the
the
fans fans
ms
15. 6 17 Fiberglas end Asbestos
No abuses in the use of Fibergles
An sional case of ferentiils from the
source faroportat faroportat
The covering shop we inspected for svidences of asbestos dust expOBUF Amosibs 30 nabosto and asbcntos cloth are the prinsipal prinsipal
handled Although the air of the
shop was not
-10-
dusty at the time of inspection workmen reported that conditions became very bad at times and the accumulations of
duxt wiring and structural members of the building bore
out their statement
& Prolonged inhalation of sabestos dust may re-
ault in a disabling lung condition known as asbestosie
The onest of the disease in alow and its course resembles that of silicosia
To control dust in the shop the following procedures are recomsendad~-
2. Materials should be worked wet whenever possible Small sprinkler bottles to be used by the worke men should be provided
2. Good housekeeping abould be observed and debris should not be allowed to sccumulate Sorap material
on the floor should be wetted down 13.8 Bilicosis
Sandblasting and zino metallizing are done in the open in a remote section of the yard near the piokling tanks Satisfactory protection is afforded the sandblaster
an ippinet supplied smak and an abrasive blesting hood A supplied mask is worn by the metallizer also
Helpers working near ths metallizing operationa should be cautioned against breathing the zino fumes produced If it is necessary for them to expose themselves
metal fume respirators should be worn These respirators respirators
-11-
are provided but negligence in their use m^/a observed
13.9 Cormatitis
~
Although a very few oessa of dermatitis have
occurred among the electricians non has been of the
chloracne Sype traceable to the handling of electrical
cable containing chlorinated hydrocarbon synthetic wires
in the insulation
Much of the beat and resistant multi-
conductor cable for Nery vessels docs contain zmathstio
wazes and the possibility of an outbreak of chloracne
especially during the hot weather to coms among sle stri-le tricians stripping and handling such cuble la extremely good
Print washing facilition in the electric shop are inade-
quate tonela
There are not
ere providad
enough
tape
and
no
scap
and
and
paper
It is recommended therefore that
adsquats washing facilition be provided and that the
exposed men be cautioned to ran up thoroughly at the
end of each half shift
14 Ventilation Standards
14.2 The adu^nistration of the Vantilation Division
Mabel Deplotment
osforman of th^>ch
is under the dire supervision of &
The Safe cclartmaas ba
the ice ice
ith the sheet
Department
information on pacific cal conditione
~ia-
en ventilation procedures
~ 14.3
Personnel of department A. In addition to one leaderman on each shift
arew in sumposed of
the ventilation
At the
presentotfime vessels in various
stages of blower equipment
a total of twenty
construction require the use
Since this total includes three
destroyers and seven large size cargo and refrigerator refrigerator ships the demands for blower nervios Eu pest Increased
demands in the coming hot weather are anticipated and as
appointment is done there will be a need for the usually * of more men to the ventilation crew especially on the
welding night night shift on which a large mount of production
is done Appointment of men to the crew now would
give
befor the exple time for their training by the supervisore
hot weather starts
5. Ventilation men are trained by the super-
visor on the job of the sound
of which is in the
This would be emmmented by the showing film #Golders - To Your Health a co7y
of the Training Directer
possession
in the shipyard
RT Se LE 7.0% of
SS wente ig gt SR eg
2-14.4
Tral ofEquipment
Number and description of fans on band~- 32 ILG centrifugal blowers ILO Electria
Ventilating Company Chicago Ill 1 HP motor about 800 ofm capacity Sawyer amall Sawyer Masters Sawyer
Mectric Manufacturing Company rated at 1200 cfm EP motor
large Sawyer Master Blowers & F motor 1200 cfm
American Olower Company propeller type
fans axial flow 3 HP 30,000 cfm Ko fans are on order at the present time 80,000 feet of inch flexible metal
duct an additional 10,000 feet are on
order
About fifteen 12 rest lengths of inch
Glamster Flexhaust duct has recently
been obtained for use on board the hulla
under construction
It will be noted that with the exception
of the two large propeller type fans which are used to
supply air through the destroyara permanent duct work
the
for
fans are of small capacity and adapted local exhaust through short lengths of
particularly
thres
flexible metal tubing
ay
14-
? ,
15.4 Ventilating Frocedures
:
*
.
Local oxhaust the
removal of ums
,
eof
source be distinguished from general ventilation A supply of large volumes of air to diluts the |. is the man generally relied upon in this yard the vectilution ores do a good job of providing weldare confined spaces with local eximust hose and % te that discharge is always vads to the open air
Welders in this yard are above average
making proper use of the local exhaust hosea
some room for improvement howavar 08 19 3 #oted in
:
several ships that sous welders failed to hold the sud
the exhaust hose to within six or eight
Double bottom sectionz of
gerator ships are ventilated by exh 'ustingals thug thug \
hole especially especially
out for the purppurpose ose in the tick top aboa
zidway bates the two manholes On one ship the obse
that this cathod was supplemented by supply of air throu three hose to individual welders in the wo pencia
sections of the double bottom tanks
three blowers to effectively exhaust
1616 nee ou qu qur r
from one
tank tank
tank
whoreae if larger blowers were provided ons would job with a consequent saving of installationinstalation and and and main main main main main ^'
benance of timo
SRE
ll
EAI
Ea
re
ee
a
after peaks and Bachinery
powered by HP unter unter a
8000 ouble feet of air per
^ bout10 such units supplemented pasal Cot of inch diameter diameter to
are aeeded to me the recom
Vensliation proceduras .