Document OELEYvromLX56VXoJMRLaoJVw
SAFETY - A. H. Sather
Occupational Injuries
Injuries Treated
First Aid Medical Cases Restricted Workday Cases Restricted Workdays Lost Time
Injuries By Department
September
1 0 0 0 0
1980 Year-to-Date
38 14
2 23
0
1979 Year-to-Date
29 6 2
29 1
Vinyl Operations Compound Operations Maintenance Laboratory Receiving and Warehouse Office
0 12 1 15 0 23 03 00 01
13 3
18 0 0 2
Injuries By Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains and Sprains Other
0 27 04 06 1 11 04 04
11 5
12 7 5 1
As of September 30, 1980, the plant operated a total of 450 days or 579,320 manhours without a disabling injury.
Safety Meetings
The topic for safety meetings during the reporting peri os was "Eye Safety". Several of the plant safety rules regarding eye and face protection and the film "Don't Push Your Luck" were reviewed.
New Employee Orientation
Six (6) new employees were given new employee orientation during the reporting period. Of the six (6) new employees, five were casual laborers and one was the new Vinyl Operations Superintendent, P. E. Markey.
Training Programs
Initial comments were given to M. S. Reynolds, Houston, regarding the expanded health effects of VCM exposure and medical records for the revised VCM slide and tape program. Several additional photographs were taken to complete the Employee Safety Responsibilities Program.
-1-
)TH 000021552
SAFETY - (continued)
Corporate Safety Meeting
A. H. Sather attended the Corporate Safety Meeting held in Houston September 28 through October 1, 1980.
Departmental Supervisors Meetings
Initial plans were made to conduct Departmental Supervisors Meetings to discuss areas of need and methods to improve safety performance. The meetings will be conducted during October, 1980.
Chemical Exposure
Activity for the month included monitoring for VCM and Lead exposure. Also, the results of the Aberdeen PVC Dust Sampling were compiled and reported. Monitoring results and overexposure explanations are noted below.
VCM
A total of 92 samples were taken with 5 indicating overexposure.
Range (ppm VCM)
Number
Percent
0.0-0.5 0.5-1.2 1.0-5.0
5.0+
85 92.39 2 2.17 4 4.35 1 1.09
92 100,00
Of the 5 VCM overexposures, 2 occurred to Mechanics who were blinding and opening the south knockout tank in the new unit and were wearing air line respirators; 1 occurred to a Mechanic who was changing gaskets in a VCM compressor and was wearing an air line respirator, 1 occurred to a Vinyl "A" Operator who was changing VCM filters and was wearing an air line respirator; the remaining overexposure occurred to a Vinyl Shift Supervisor who was not wearing a respirator. The source of the last overexposure is under investigation.
Lead
Number
Less than PEL* Greater than PEL
* Permissible Exposure Limit
2 0 2
PVC Dust Sampling
A total of 41 samples were taken and analyzed. Of these samples, the first 5 were checked for particle size distribution, one was a blank, and the remaining 36 were analyzed for sample weight using matched-weight filters. The results of particle size analysis and time weighted average exposure
-2DTH 00U021553
SAFETY - (continued)
PVC Dust Sampling - (continued)
analysis are shown below.
Particle Size
Size Range, Microns
<2 2-5 5-10
>10
Percent, Total Particles*
4.5 26.1
26.9
42.5
* Particles were counted and sized using a scanning electron micro scope. All particles were counted.
Time Weighted Average Exposure (TWA)
Range (Mi 11igrams/M^)
Number
Percent
0.0-0.5 0.5-1.0 1.0-1.5*
29 80.56 4 11.11 3 8.33
36 100.00
* The largest TWA result was 1.4 mg/m^. The respirable dust standard (0SHA) is 5.0 mg/m3.
-3-
DTH 000021554
VINYL - P. E. Markey
Production
Month
Y.T.D.
Budget
1. Total Production, MM Pounds 2. Production Rate, M Pounds/C.D. 3. Charges, Reactor Batches/C.D. 4. Total Charges 5. Reactor Stream Factor, % 6. Drying Rates, Average Pound/Hr. 7. Dryer Stream Factor, % 8. Accounting Days
23.4 780
19.1 573
80.6 5699
81.5 30
187.9 686
16.5 4526
71 .9 4082
72.1 274
Vinyl Department production for September was 86.6% of budget at 23.4 MM pounds. Production levels continued to be reduced as part of the inventory control program.
Reactor and dryer stream factors were 80.6% and 81.5% respectively. The major item affecting those stream factors and the overall production rates are as follows:
1. Inventory control programs continued to represent the majority of reactor and dryer stream factor penalties (10.3% and 10.2% respectively).
2. A total of 5 reactor condenser brushings were performed, resulting in a 2.8% reactor stream factor penalty.
3. Debagging operations were undertaken towards the end of September, resulting in a 2% dryer stream factor penalty.
Testing of extended Methocel addition times was begun in September. Additional testing is planned for October.
Resin Quality Summary
Resi n Type
Prime Pounds
"BC" Grade
"H" Grade
% of Total Producti on
5305 5385 5425 5465 Sifter Overflow
1,604,190 18,268,239
2,880,505 404,400
-
( 50) 203,250 13,500
-
-
-
(286,450)
-
244,900
6.9 79.2 11.2
1.7 1.0
TOTAL
23,157,334 216,700
( 41,550)
100.0
Quality performance for September was 99.2% customer grade with 0.9% "BC" grade and (0.1%) "H" grade. Debagging operations upgraded 286 M pounds to prime quality resin.
-4DTH 000021555
VINYL - (continued) The variable cost variance for the Vinyl Department was $339.3 M with $314.1 due to price and $25.2 M due to efficiency. The variance due to product mix was $8.6 M. The major price variance was $320.2 M for VCM. The major efficiency variance was ($57.7 M) for VCM, but was partially offset by a favorable $51.3 M in processing additives. The raw material requirement for September was 1.03200 pounds VCM/pound PVC versus the 1.01960 standard. (Y.T.D. is 1.01876) General Resin packaging for September totaled 2,827,885 pounds, Resin debagging totaled 286,450.
-5-
DTH 0000215&
COMPOUND - J. R. McCrimon
Compound Production
Month Day Y.T.D.
Line I, M Pounds Line V, M Pounds
Line III, M Pounds Total, M Pounds Accounting Days
1,127
51 10,048
214 31
834
2,831
98 23,517
4,172 144 34,400
30 274
Line I operated 22 days during September at an average rate of 51 M pounds per day. Major items affecting production efficiency were: product changes (35.5 hours), adjusting and repairing scales (30.2 hrs,), dicers (16.0 hours), conveyor clutch and bucket repairs (15.8 hours), and maintenance on the pull roll gearbox.
Line V operated 7 days during September at an average rate of 31 M pounds per day. Major items affecting production efficiency were: putting raw materials in use bins (19.9 hours), product changes (15.0 hours), maintenance on the Orbitran (7.1 hours) and maintenance on the plasticizer scale system (5.5 hours).
Line III operated 29 days during September at an average rate of 98 M pounds per day. Line III production was affected by: product changes (41.4 hours), repairs to FCM and conveyor (19.9 hours), and quality control (11.1 hours).
Quality performance for flexible compounds was 3.0% off-grade of which 92.6% was due to mill scrap. "BC" production was 1.3%.
The raw material requirement for flexible compounds was 1.03410 pounds of raw material per pound of compound versus a 1.01303 standard. (Y.T.D. is 1.01994)
The variable cost variance for compound was ($8,0 M) with $44,1 M due to price and ($52.2 M) due to efficiency. The variance due to product mix was ($4.8 M). The only major efficiency variance was ($12.9 M) for resin which was due to an inaccurate inventory count on bagged resin, There were no major price variances for September.
Dry Blend
Month
Day Y.T.D.
Production, M Pounds Accounting Days
1,645 30
84
15,323 274
Dry Blend operated 19 days during September at an average rate of 84 M pounds per day. Production included 80172B, 80273G, 80274G, 80175 and 3948-43A, Dry Blend production was affected by: inventory control. No. 2 Welex blade change (16.0 hours), maintenance on product blower (15.6 hours), quality control (14.2 hours), boxing dry blend (11.5 hours), dust collector/use bin repairs (9.7 hours), and product changes (8.3 hours).
Quality performance for the month was 99.99% customer grade.
-6-
DTH 000021557
COMPOUND - (continued)
Dry Blend - (continued)
The raw material requirement for dry blend was 1.02031 pounds of raw material per pound of dry blend versus a standard of 1.00319. (Y.T.D. is 1.00890)
The variable cost variance for dry blend was $26.0 M with $8.5 M due to price
and $17.5 M due to efficiency. The variance due to product mix was $32.9 M. There were no major price or efficiency variances for the month.
Plasticizer
Month Day Y.T.D.
Production, M Pounds Accounting Days
1,026 30
51
7,030 274
Plasticizer operated 20 days during September at an average rate of 51 M pounds per day. Production included: 610P, DIDP, and D0P.
VRP production totaled 68.2 M pounds (6.7%). Production was limited by: R-2 cooling coil acid cleaning and rupture disc replacement (twice).
The raw material requirement for plasticizer was 1.12148 pounds of raw materials per pound of plasticizer versus a 1.07823 standard. (Y.T.D. is 1.11325)
The variable cost for plasticizer was ($55.7 M) with ($34.2 M) due to price and ($21,6 M) due to efficiency. The only major price variance was ($17.0 M) for 2-Ethylhexanol and there were no major efficiency variances.
The variance due to product mix was ($0.9 M).
General
Total customer grade compound inventory decreased from 7.2 to 6.7 MM pounds during September.
-7-
DTH 000021558
MECHANICAL - S. J. Vincent
Vinyl
There were no large reactor seals or gearbox failures in this period. There were five condensers cleaned this month with three condensers being cleaned in the new module and two in the old module. Those condensers cleaned in the new module were on the 742, 743, and 744 reactors. In the old module, condensers were cleaned on the D-300 and D-400 reactors.
The safety valves were tested on 741 and 744 reactors. Mew safety discs were installed on these reactors also. New agitator blades were installed in the new module reactors 741, 742 and 743.
Several major valves were repaired or replaced in the vinyl production area in this time period. The slurry dump valves on 742 and D-300 reactors were replaced. The recovery system bypass and inlet valve to the north knock-out drum were replaced. The evacuation and recovery valves were replaced on 741 reactor and rewired for panel control, along with both steam stripping valves. The D-400 chemical wash valve was replaced. The polarity was reversed on the new module large reactor control valves. This was done to prevent the possibility of these valves failing open should there be a wiring problem.
There were seven seal failures to pumps and compressors in this period. One failure was in the new module and six were in the old module. In the new module the seal was replaced in the east VCM return pump. In the old nodule seals were replaced in the south emission recovery return pump, the emission recovery compressor, the inboard and outboard seal on "B" recovery compressor, the inboard seal on the "A" recovery compressor and the inboard seal on "B" vacuum pump.
In the old module the rinse pump was overhauled and a new seal water pump was installed. Two Corken compressors were removed to repair case leaks. New safety discs and safety disc holders were installed under the VCM sphere safety valves.
The Bird centrifuge and gearbox were changed twice in the #5 dryer unit. The Bird centrifuge and gearbox were changed in the #4 unit. The Sweco feeder valve was changed on #2 dryer and the exhauster damper was reworked on the #6 exhauster. A separate power source was installed to the large silo lights. The lights previously were shut off whenever a blower was locked out.
Compound, Dry Blend, Plasticizer, and Silo Storage
The compound lines I, III, and V were operated this month with line I and V alternating. The bulk of the repairs to the compounding equipment were dicer maintenance, along with minor steam and process leaks. The resin diverter valve to line I and V was replaced and the line I scales were over hauled. Repairs were made to #6 dicer motor. The compound cooling tower level control was repaired. The line one product blower was relocated and rewired.
-8-
DTH 000021559
MECHANICAL - (continued)
Compound, Dry Blend, Plasticizer, and Silo Storage - (continued)
In dry blend, the blades were changed in the #2 Helex. The dump gate was rebuilt on #1 Wei ex. The overflow dump valve was replaced on the south Kason screener. Isolation valves were installed on the bottom of the 412 and 413 silos. A blender motor was repaired due to a leaking oil seal.
A major problem was experienced with the north plasticizer blower that involved bearing failures, case leaks, and rotor problems. The unit has been completely overhauled and returned to service. The coil in R-2 reactor was chemically cleaned. Safety discs were replaced on all plasticizer reactors.
The safety valves were tested on the four fire pumps. One development lab mill was rebuilt. The new 800 horsepower Joy air compressor motor was installed along with the new control system. Power was run to three waste analysis trailers. The installation of two electric operated doors was completed on the warehouse.
Utilities and Service
There were three repairs to the plant air system this month. Valves were replaced in the #6 and #9 air compressors and the heater elements were replaced in the east tower of #3 air dryer.
The air conditioning and air compressor P.M. programs are proceeding. The compressor on the safety department air conditioning unit was replaced. The machinist repaired or completed machine work on 24 major items. The tool room mechanic maintained the tool room and rebuilt valves to be returned to stock and tested safety valves.
The well pump header safety valve was tested and reset to 120 psig. A new temperature control thermostat was installed in the I & E shop.
Planner
The planner estimated 87 work orders. Material was ordered for 35 projects. Closed 12 registers and issued 20. Processed 17 statements for payment. The equipment history and safety valve records were maintained.
-9-
DTH 000021560
MECHANICAL ENGINEERING - J. A. Dixon
AFE's Submitted, Approved, and Closed
The following AFE's were submitted and approved during September:
AFE No.
Title
Authorized
9680
9690 9010
Fixed Point Monitor Data Computer and Warning Lights
Breathing Air Modifications Centrifuge Rotor Repair
$113,000
21,000 20,000
Completion reports were issued for the following AFE's during September:
AFE No.
Title
Authorized
9098 9549 9659 9520 9540 9640
New Compound Line Safety Equipment P. A. System Modifications Replacement Phthalic Anhydride Tank Laboratory Equipment Shed For Drum Storage Area
$2,050,000 15,000 35,000 75,000 45,000 14,000
The following AFE 's were closed to field charges during September:
AFE No.
Title
Authorized
9297
9148 9258 9228 9248 9769
Automatic Plasticizer-Stabilizer Weigh-Up System
Plasticizer Chemical Exposure Abatement Dryer Operations Improvements Dry Blend Silo Alarms Silo Isolation Valves Automatic Setback Thermostats
$ 60,000
T52,000 315,000
25,000 25,000
3,000
Design
Design work is in progress on the following projects:
- Replacement of Hot Water Charge Tank - Methocel Charge Revisions - Boiler Economizers - Reactor Inert Vent System - Walkway From 600 to 200 Series Silos - Interplant Communications Phase II - Spare Reactor Condenser - Fire Protection Improvements - Phase II - Spare Inert Incinerator - Multigrade Resin Production Facilities - Water Stripping
-10-
DTH 000021561
MECHANICAL ENGINEERING - (continued)
AFE Activity
1. AFE 9629 - Air Compressor - M. S. Richards
The new motor and control system for the new Joy air compressor were installed.
2. AFE 9689 - Diking of Sphere and Curbing of Drum Storage Area - J. L. White
Construction of the concrete wall is 80% complete.
3. AFE 9709 - Facilities for Multi grade Resin Production - CED (S. Krase)
Overall project design is 75% complete. All major electrical and instrumen tation items have been purchased. Concrete bid packs were sent out for quotes.
4. AFE - 9729 - Fire Protection Improvements - Phase II - CED (M. Ingle)
Overall project design is 92% complete. Part I of the underground piping is out for bids. Bids are due 10/10/80.
5. AFE 9739 - Methocel Charge Revisions - J. L. White
Overall project design is 90% complete. The strahman ram valves have been received.
6. AFE 9530 - Spare Incinerator - CED (D. Haub)
Overall project design is approximately 45% complete. Structural design and pipe drafting are in progress. Concrete and plot plan drawings are being revised to reflect the new location of the incinerator.
7. AFE 9550 - P. A, Handling Improvements - J. P. Windham
Installation of the jacketed unloading line is 90% complete. Project completion is scheduled for 10/15/80.
8. AFE 9560 - Safety Equipment - J. P. McKee
Structural design of walkway between the 600 and 200 series silos has been reviewed and is ready for bidding.
9. AFE 9580 - Boiler Economizers - J. L. White
Structural steel and equipment installation contract has been let. The piping bid packs are out for bids.
10. AFE 9590 - Critical Spare Equipment - J. P. McKee
The drawing for the spare condenser is ready for bidding.
-11-
DTH 000021562
MECHANICAL ENGINEERING - (continued)
AFE Activity - (continued)
11. AFE 9610 - API Clean Water Bypass - M. S. Richards
The skimmer has been received. Sewer design is in progress.
12. AFE 9630 - Water Stripping - CED (M. Ingle)
Mechanical design is 74% complete. Quotes on structural steel have been received and tabulated. Concrete and sewer bid pack with the revised sewer location have been issued.
13. AFE 9660 - Hot Water Charge Tank Replacement - J. P. McKee
The concrete work has been let and is in progress.
Construction - 6. A. Morgan
Bids were received for the D-300 reactor jacket repair. Construction has started on the new hot water charge tank.
The plant water wells were inspected for flow, mechanical condition and water quality. The foundations for the boiler economizers were completed. The new motor and controls for the new Joy air compressor were installed.
Bids have been requested for part I piping of the Fire Protection Improve ments Phase II project, A smoke detection system was installed for areas which normally have no traffic during off hours.
Six contracts were let during the period. They were for:
1. Insulation of Vapor Emissions Recovery System 2. Insulation of New Phthalic Anhydride Unloading Line 3. Insulation of Piping for Double Block Valves for VCM Charge 4. Lease of the Amory Rail Lead for Car Storage 5. Repairs to Plant Trackage 6. Foundations for New Hot Water Charge Tank.
Thirty-two (32) register tickets were issued during September.
-12-
DTH 000021563
(1} Thru August, 19110 Actual Accounting (2) Thru September, 1980
ABERDEEN AtmiOUi:.\,nONS REPORT
Aum. CAPITAL NO. m-SCIUPTlON
9237 9297
Heated Plasticizer Addition System
Automatic Plasticizer-StabilIzer Weigh-Up System
DATE
AUTIl.
APPROVED Ai;i:. wrr.
10/11/77 37,000
12/14/77 60,000
Cl) EXPENDED
TO DATE
U) COMMITTED
TO DATE
FINAL TOTAL LST. COST COMP.
UNDER (OVER) AUT11. AMT.
EST. LST. COMP. CI.OS. DATE DAH:
REMARKS
13,090 13,589
37,000
0 12/80 3/81 Design in progress.
56,263 59,163
60,000
837 9/80 12/80 Closed to field charges.
9148 Plasticizer Chemical Exposure Abatement
8/21/78 152,000 142,245 149,158 152,000
2,842 9/30 12/80 Closed to field charges.
9158 Fire Protection Improvements Phase I
9228 Dry Blend Silo Alarms 9248 Silo Isolation Valves
9258 Dryer Operation Improvements 9519 Critical Spare Equipment 9559 Color Weigh Room Modifications 9589 Instrument Air Dryer 9609 Reactor Inert Vent System 9629 Air Compressor
9639 Revisions to Emission Recovery System
9/19/78 176,000 144,560 179,595 182,600
12/13/78 25,000
12/14/78 25,000
12/14/78 315,000
2/6/79
175,000
4/19/79
25,000
5/30/79 110,000
6/28/78
90,000
7/9/79
340,000
7/12/79 100,000
16,490 16,580 21,629 22,577 287,749 325,140 107,249 160,097 17,849 18,552 90,134 90,645 13,245 17,895 249,327 261,749 60,065 69,664
25,000 25,000 326,000 163,000 25,000 110,000 90,000 340,000 100,000
( 6,600) 8/80 11/80 Closed to field charges.
8,420 9/80 12/80 Closed to field charges. 2,423 9/80 12/80 Closed to field charges. ( 11,000) 9/80 12/80 Closed to field charges. 12,000 10/80 1/81 Revisions in progress.
0 11/80 2/81 Project operational. 0 11/80 2/81 Revisions in progress. 0 12/80 3/81 Engineering in progress. 0 3/81 6/81 Revisions in progress. 0 12/80 3/81 Revisions in progress.
9649 Double Block Valves for VCM Charge
9669 New Air Header
9689 Diking of Sphere & Curbing of Drum Storage Areas
7/18/79 8/15/79 9/15/79
182,000 25,000
170,000
135,479 17,084 64,194
147,290 17,284
127,244
182,000 25,000
170,000
0 10/80 1/81 Project operational. 0 12/80 3/81 Revisions in progress. Q 11/80 2/81 Construction in progress.
9699 Plant Dryer Debottlenecking
9709 Facilities for Multiple Grade Resin Production
9719 Aberdeen PVC Resin Expansion
9729 Fire Protection Improvements Phase II
9739 Methocel Charge Revision
9759 Aberdeen PVC Resin Expansion
9769 Automatic Setback Thermostats
9510 Miscellaneous Projects Under $10,000
9530 Spare Incinerator
9550 P. A. Handling Improvement
9560' Safety Equipment
9570 9580
Replace T-100 P. A. Tank Boiler Economizers
9590 Critical Spare Equipment
9600 Calcium Stearate Addition System
9610 API Clean Water Bypass
9630 Water Stripping
9650 Miscellaneous Projects Under $10,000
9660 Hot Water Charge Tank Replacement
9670 9680
Laboratory Equipment
Fixed Point Monitor Oata Computer and Warning Lights
9/15/79 9/20/79
80,000 870.000
5,365 23,380
23,595 271,080
80,000 870,000
9/10/79 10/1/79
850,000 490,000
11,421 817,600 15,994 99,465
850,000 490,000
10/3/79
66,000
7,096 20,621
66,000
12/10/79 11 ,150,000 1,033,079 4 ,897,400 11 ,150,000
12/31/79
3,000
2,419
2,557
3,000
1/3/80
150,000
89,303 119,290 150,000
1/23/80 3/3/80 3/12/80 3/27/80 3/26/80 3/26/80 4/2/80 4/15/80 4/30/80 5/30/80
650,000 63,000 25,000
119,000 140,000
59,000 84,000 23,000 810,000 150,000
164 213,578
23,982 28,927
1,711
7,703
57,782 62,366
2,019 109,663
0 11,486
0 1,148
3,216
4,727
6,270 38,509
47,699 107,524
650,000 63,000 25,000
119,000 140,000
59,000 84,000 23,000 310,000 150,000
6/4/80 7/9/80 9/4/80
160.000 32,000
113,000
200 40,243 160,000
151 30,529
32,000
0 0 113,000
0 3/81 6/81 0 3/81 6/81
Engineering in progress CEO. Engineering in progress CED.
Q 1/81 4/81 Equipment on order.
0 6/81 9/81 Bids requested on Part I piping.
0 12/80 3/81 Engineering in progress.
0 9/81 12/81 Foundation work in progress. 443 9/80 12/80 Closed to field charges.
0 12/80 3/81 Forty-Eight projects approved.
0 3/81 6/81 Engineering in progress CED. 0 12/80 3/80 Construction in progress. 0 12/80 3/81 Smoke detection portion complete 0 12/80 3/81 Project on hold. 0 12/80 3/81 Installation in progress. 0 12/80 3/81 Engineering in progress. 0 11/80 2/81 Engineering scheduled. 0 11/80 2/81 Engineering in progress. 0 4/81 7/81 Engineering in progress. 0 12/80 3/81 Thirty-three projects approved.
0 12/80 3/81 Foundation contract let. 0 12/80 3/81 Analyzer purchased. 0 9/81 12/81 Engineering in progress.
9690 Breathing Air Modifications
9010
EXPENSE Centrifuge Rotor Repair
9/9/80
21,000
9/19/80
20,000
0 0 21,000
0
-13-
0 20,000
0 3/81 6/81 Engineering scheduled.
0 12/80 3/81 Repairs in progress.
DTH 000021564
PERSONNEL - J. L. Carter
EMPLOYMENT Phil Carson, Casual Labor William Davis, Casual Labor Charles Morris, Casual Labor Randy Otts, Casual Labor Stevie Troupe, Casual Labor
TO/FROM LEAVE OF ABSENCE None.
TRANSFER/PROMOTION John Coffman, Plant Accountant, promoted to Management Information System Analyst, Houston. Pete Markey, Assistant to the Vice President-Operations, Houston, promoted to Operations Superintendent, Aberdeen. Vernon Thornhill, Process Engineer, promoted to Senior Process Engineer. Earnest Randle, General Helper, promoted to Compound Utility. Hansel Baughn, Lab Trainee, transferred to Compounder.
RETIREMENT None.
TERMINATION Lester Danner, Compound Operator
OTHER During September there were five casual labor employees on payroll. Total hour worked were 702.25.
-14-
DTH 000021565
CONOCO CHEMICALS Aberdeen, Mississippi
September 1980
MONTHLY PERSONNEL REPORT
Salaried Employees
77*
Minority Employees #
Hourly Employees
156
Salaried 6 7.8%
CO CO ci-S
Total Employees
233*
Hourly
59
Employees (Hourly)
Total
65 28%
New Employees Terminations
Hourly Min. Hired % Min. Hired
Hour1y Min. Term. % Min. Term.
0 0
n m
DEPARTMENTS PAR It EMPLOYEES MIN. EMP. . % MIN. NEW HIRES YTD TERM. YTD TURNOVER YTD
Warehouse 9 9
2 22%
0 0 00 0
0
Gen. Plant Maintenance
10 46
11 46
4 36% 7 15%
0 4 02 0 0 0 00 0
16.6% 0
Laboratory
22
20
3 15%
0 0 00 0
0
Compound
37 35
28 80%
0 0 1 3** 3% 6%
Vinyl Plasticizer
32 5
31 4
12 39% 3 75%
0
0 01
0
0 0 0 -0 0
3% 0
Number of Applicants:
Month
2 Year to Date 116
APPLICANT BREAKDOWN:
It Minority
1
% Minority
50%
^ Female
0 % Female
0
includes three (3) temporary employees.
**Includes one (1) retirement and is not counted in turnover rates.
Hires (Hourly) :
Month
0
Year to Date
4
Terminations (Hourly) :
Month 1
Year to Date
Overall Turnover
.6%
6**
Projected Annual Turnover
5%
-15-
DTH 000021566
OO
oo
CCOO
co cn
o3
o
.c
s-
KOI
OVERTIME AND ABSENTEEISM
QEJ -O
i-- c
q|
DTH 000021567
PROCESS ENGINEERING - R. A. Frohreich
A. Expansion Project
Basis of bids for the second concrete package which includes the silos, cooling towers, initiator storage freezer, and slurry blend tanks were issued to contractors. In the V-ll area the reactor pad and piers are in place. In the CRD area the reactor piers have been placed. Con struction of the electrical substations is underway. Review of piping and electrical layout continues with plant assistance to Litwin field personnel as needed.
B. Agitator Replacement
The AFE request for this project was submitted.
C. Modifications to Make Profile Dry Blend
The revised class "A" design for this project was issued and the AFE request was submitted.
D. Compound Fines and Streamer Removal
The revised class "A" design for this project was issued and the AFE request was submitted.
E. Resin Reclaim System
The class "A" design was issued, a review meeting was held and the revised class "A" design incorporating comments from the review meeting was issued.
F. Heat Recovery System
The class "A" design was issued and a review meeting was held. Comments from the review meeting are being incorporated.
G. Automatic Cooling Tower Fan Controls
The AFE request for this project was submitted.
H. City Water Usage
City water usage is down as a result of starting the forth well water pump and resetting the setpoint on the well water relief valve,
I. Emission Recovery System Compressor Problem
Several trouble shooting tests were run on the Nash compressors as suggested by Nash with negative results. A Nash Service Representative will be here in October to determine why the compressors will not put up the proper head.
-17-
DTH 000021568
PROCESS ENGINEERING - (continued)
J. Process Water Filter Replacement
This design to reduce filter element expenses will be issued in October.
K. Fire Protection Improvements - Phase III
The AFE request for this project was submitted.
L. API Clean Water Bypass
Revised drawings routing the clean water from the plasticizer building around the API were issued and reviewed.
M. Cooling Water Blowdown Bypass
The class "A" design to bypass cooling water blowdown around the bioponds is being prepared.
N. Rotary Dryer Insulation
An evaluation of energy savings by insulating various sections of the rotary dryers is being prepared.
O. Kemp Air Dryer Modifications
The class "A" design to add coalescing filters, replace purge piping and electrical, and make other modifications in order to correct the dew point problem in the Kemp air dryers is being prepared.
P. VCM Tank Farm Revisions
A design to correct problems and allow for better unloading of VCM is being prepared.
Q. Biopond Aerator Replacement
The class "A" design to replace existing aerators with smaller submerged ones to reduce the aerosol effect is being prepared.
R. Compound Sewer Revisions
The design to eliminate process contact streams from the compound area that now enter the storm water sewer is being prepared.
S. Emergency AMS Kill System
PED completed the class "A" design for this project and a review meeting was held at the plant.
T. Double Rupture Disc Replacement
A review meeting of PED's class "A" design for replacing the double rupture disc/relief valves systems was held at the plant.
-18-
DTH 000021569
ENVIRONMENTAL - V. E. Messick
Particulates Two dryers were tested for particulates in September. Water Effluent BOD and COD concentrations were within NPDES limitations in August. The Quarterly NPDES Discharge Monitoring Report was issued. The pilot study of the biodisc is proceeding on schedule. Preliminary results show about 65% COD reduction with the biodisc. Hazardous Waste Management The plant is negotiating with Chemical Waste Management about contract language for disposal of six items. Work has begun on the Part A of the Permit Application which is due November 19.
-19-
DTH 000021570
Flow
GPM
Jan. - Ave. 810 Max. 941
Feb. - Ave. 645
Max. 802
Mar. - Ave. 595 Max. 743
Apr. - Ave. 628 Max. 877
May - Ave.' 304 Max. 480
June - Ave. 670 Max. 804
July - Ave. 696 Max. 813
Aug. - Ave. 698 Max. 753
Sept. - Ave. 679 Max. 767
Oct. - Ave. Max.
Nov. - Ave. Max.
Dec. - Ave. Max.
TABLE I
WATER COMPLIANCE WITH
NPDES PERMIT PARAMETERS
BOD PPM LB./DY.
COD PPM LB./DY.
Sus. Solids
PPM LB./DY.
Diss.
0"
43 131
436 1342
86 851 216 2214
11 103 13 143
6.8-8.5
6 42 8 56
29 220 36 314
21 147 30 232
15 116 24 171
66 502 95 82 8
54 378 67 519
10 79 13 125
11 74 14 94
12 86 13 129
6.7-7.9 6.6-8.3
6.4-8.3
16 69 32 184
6 49 11 84
53 197 74 426
40 316 51 367
10 40 14 81
12 98 15 145
6.7-7.3 6.7-7.3
14 112 19 145
7 56 9 70
5 42 7 64
39 322 78 597
32 270 42 380
22 168 27 248
11 88 14 110
15 126 24 187
7 44 14 89
6.6-7.3 6.5-6.9 6.2-6.7
NPDES - Ave. Max.
32 387 43 520
1390 1940
- 605 - 909
>6.0
>*--
i
-n
oo
ph 7.7-8.0 7.1-7.8
7.5-8.4 7.2-7.9 7.5-7.9 7.3-8.0 7.6-7.9 6.5-7.9
6.0-8.5
DTH 000021571
ENERGY CONSERVATION - V. L. Thornhill
I. Plant Operations
Total energy consumption for September was 97.1 MMM BTUs. The energy consumption per pound of product decreased from 3425 BTU/lb. to 3215 BTU/lb. in September.
II. Plant Energy Conservation Program
Steam Leaks
Nineteen steam leaks were repaired in September.
Other
R. A. Conrad, Carl Spangler, and Bob Vruggink were here to survey the plant for potential energy savings projects. Recommendations will be made by the survey team to the plant for evaluation.
-21-
DTH 000021572
ENERGY CONSERVATION DATA
ITEM
1979
1980
Production, MM Lbs.
Resin Dry Blend Compound Plasticizer
TOTAL
September
28.3 3.7 3.0 1 1
36,1
September
23.3 1.6 4.2 1.1
30.2
Natural Gas
Consumption, MSCF Conversion, BTU/SCF Energy Consumption, MMM BTU
Electricity
Consumption, MM KWH Conversion, BTU/KWH
Energy Consumption, MMM BTU
Propane
Consumption, M Gal. Conversion, BTU/Gal. Energy Consumption, MMM BTU
54285 1020
55.371
4.7232 10000 47.232
21.095 92000
1.941
49322 1020
50.380
4.680 10000 46.800
0 92000
0
Total
Energy Consumption, MMM BTU Energy Consumption , BTU/Lb.
104.544 2896
97.108 3215
Boiler Operating Data
No. 1 No. 2 No. 3
Avg. Stack Temp.
1979
1980
377 382 413 464 409 421
Avg. -a Excess Air
1979
1980
26 29 28 22 33 22
-22-
DTH 000021573
LABORATORY - R. D. Jackson
CUSTOMER COMPLAINTS Customer
Product
Complaint
Report By
Rehau Plastiks Charlotte Pipe O'Sullivan Corp.
5385 5385 5385
Contamination - Fused Resin Contamination - Fused Resin Contamination - Fused Resin
CRM CRM JRW
WAIVERS RECEIVED Date Identification
Product
Customer
Reason
Waived By
9/16 9/22
PTLX 41657 CONX 45298
5385-3 5385-3
Charlotte Pipe Charlotte Pipe
Particle Size Particle Size
JRW CJM
PRODUCT DEVELOPMENT & SERVICE
Ship Date
Product
Amount (Lbs.)
Customer
Requested By
9/3 9/10 9/10 9/10 9/16 9/16 9/16 9/16 9/16 9/16 9/17 9/16 9/16 9/24 9/24 9/24 9/24 9/24 9/24 9/24 9/24 9/24 9/26 9/26 9/26 9/26
38601 Natural
2
34641 Black
50
34641 Natural
50
5385-1
50 x 4
14952 Natural
100
15241 Natural
100
18161 Natural
100
35851 Natural
50
34431 Natural
50
38551 Natural
20
Unitane 0R-450
5
36861 Natural (EXP) 5
34861 Gray (EXP)
5
5305
50
34501 Black
200
34501 Black
250
5305
50
5425
50
5305
50
5385-1
50
5425
50
5465
50
48562 Black
2
38601 Natural
5 kg
34431 Natural
5 kq
5425
5 kg
Wilson Products Co. Eaton Corp. Eaton Corp. Fritz Airfreight Runzel Cord & Wire Runzel Cord & Wire Formtech Dielectric Materials Dielectric Materials Norton Company Conoco Inc. Conoco Inc. Conoco Inc. Uni royal Chemical Div. Lorraine Ind. Cable Superior Cable Amoco Chemicals Mitsui & Co., Inc. Morton Chemical Co. Morton Chemical Co. Morton Chemical Co. Morton Chemical Co. Conoco Inc. Fritz Airfreight Fritz Airfreight Fritz Airfreight
ERC JTW JTW JPM MAS MAS JTW MM MM JTW JAP ERC ERC NTH WBS PM MAS JPM MFM MFM MFM MFM ERC JPM JPM JPM
-23-
DTH 000021574
LABORATORY - (continued)
PRODUCT DEVELOPMENT & SERVICE - (continued)
Special Compound Testing
Complete specification tests were run on 2 production lots of 34861 Gray 546 and 1 lot of 36861 Natural for Western Electric. In addition, critical property test are run on every shipment. Specification tests were also run on an experimental lot of Western Electric 646-B.
U. L. oven aging tests were run on 2 lots of 35851 Natural and 1 lot of 38601 Natural shipped to Phelps-Dodge. Two lots of 34641 black for Kaiser were subjected to U. L. oven aging tests.
QUALITY CONTROL TESTING
Resi n
Regular Samples = 301 Bag Blend Samples = 73 Other In-Process Samples = 2351 Bulk Shipments = 138 (Railcars = 94, Trucks = 44)
Dry Blend
Blenders Produced = 220 Blenders Tested = 184 Blenders Adjusted = 13.2% Other In-Process Samples = 126 Bulk Shipments = 31 (Railcars = 3, Trucks = 28)
Compound
Blenders Produced (Line 1 & 3) = 515 Blenders Adjusted = 5.4% Line 5 Production = 120 skids; 9 boxes Other In-Process Samples = 295 Bulk Shipments = 28 (Railcars = 14, Trucks = 14)
Resin Heat Stability
Forty (40) lots of resin were tested for oven heat stability.
5385 5425 5305 5465
16 lots 11 lots
9 lots 4 lots
The 5425 and 5465 resin were consistently good; however, the 5385 and 5305 samples gave a wider range of results with occasional samples being marginal to poor in heat stability.
Heat stability tests are now run in the Metrastat oven.
-24-
DTH 000021575
LABORATORY - (continued)
QUALITY CONTROL TESTING - (continued)
RVCM of Shipments
A total of 139 shipment samples were tested for VCM. Below is a summary of this data.
Product
5305
5385
5425
5465
Average RVCM Number of Samples
1.3 61
0.7 69
0.1 0.1 72
Viscosity
The Schott viscosimeter continues to function well. A total of 619 resin samples were checked for inherent viscosity.
Raw Material Testing
Forty-eight (48) lots of plant raw materials were tested. Dispersion quality of Hydral 710 continues to be erratic, and 1 truckload (2 lots) were rejected. We have finally obtained cooperation of the supplier in solving the problem.
Dry Blend Development
Quality control standards were prepared for monitorinq production of 80172B, 80175, 80273G, 80274 and 90171.
SPECIAL PROJECTS
Metrastat Oven
The initial Metrastat oven development program has been completed and a report is being prepared. Other potential applications will be investigated.
Compound Property Verification
The compound property verification program is approaching completion for 1980.
Blown Film Tower
Additional runs have been made with the extruder blown film tower. Progress has been made, but additional work is required before the unit can be con sidered operational.
RVCM in Slurry
A total of 542 slurry samples were tested in September for residual VCM. The overall average was 205 ppm. There were no days where the daily average exceeded 400 ppm.
-25-
DTH 000021576
LABORATORY - (continued)
SPECIAL PROJECTS - (continued)
EPA Testing - RVCH
A special test on slurry was done to generate data for an EPA variance request on storage of samples prior to analysis for RVCM.
Personnel Dosimetry
A total of 80 personnel dosimetry tests were run in support of the Safety Department.
RVCM of 5305 Regular Samples
A total of 39 samples of 5305 taken from the regular drier sample was checked for RVCM. The overall average was 5.8 ppm. One sample tested 67 ppm.
RVCM of Blowdown Tank Water
A total of 134 water samples were tested for RVCM. The overall average was 4.5 ppm. In September, 94% of the samples were below 10 ppm RVCM.
-26-
DTH 00002157?
TRANSPORTATION - J. E. Stark
Shipments by Product - M/lbs.
Resi n Plasticizer Dry Blend Compound
TOTAL
Number of Shipments by Mode
0 .T.
O.T.
R/C Bulk Van
Resin
- Bulk
- Package
- Export
Plasticizer
Dry Blend - Bulk
- Package
- Export
Compound - Bulk
- Package
- Export
Other
- Antifreeze
89 5 8
37 2 1
4 12 1
12 34 10 2
TOTAL
102 53 62
Back Hauls for September
16
Number of Shipments by Month - Y.T D.
R/C Bulk Van
January February March April May June July August September
104 53
72
111 83
66
130 95
64
69 43
84
42 41
75
55 36 136
57 47
52
79 51
65
102 53
62
Material Handling Report
Packaged Resin from Production Packaged Compound, Dry Blend from Production Transferred from Main to Prairie Transferred from Prairie to Prairie Reverse Transfer Resin to Plant Reverse Transfer Compound to Plant Shipment from Warehouses
Special Packaging Transfered from Prairie to Main
-27-
September
15,768 80
2,506 4,723
23,077
Year-to -Date
138,722 646
17,700 _____32? 092
189, 160
C.O.T. 0
C.C. 4 1
2
7 1
TOFC CPU TOTAL
130 9 12
1 22 25 34 1 13
1 20 2 16 54 10
2
2 53 279
17
C.O.T.
0 0 1 0 0 0 0 0 0
M/Lbs.
3,038 2,308 3,038
0 446 364 3,402 486 769 13,851
C.C.
4 21 37
5 3 7 2 12 7
TOFC CPU T0TA1
2 36 273 4 35 320 0 48 375 0 29 230 0 30 191 0 74 308 0 64 222 0 89 296 2 53 279
T/L
75 57 75
0 11
9 84 12 19 342 DTH 000021578
TRANSPORTATION - (continued)
Off-Grade In Storage
Material
M/Lbs.
T/L
Sifter Overflow Resin "BC" Resin "H" Mill Scrap Compound "BC" Compound "H" Dry Blend "O.G."
218 4,768 1,392
127 922
39 106 7,572
5 118
34 3
23 1 3
187
D. F. Operation
Total packaged inventory for the month increased approximately 1.2 MM pounds during September. Compound shipments for the month were above average. We had a decrease in compound inventory by approximately .5 MM pounds. Bagged resin inventory gained approximately 1.2 MM pounds. Export shipments for the month were extremely low.
-28-
DTH 000021579
V LOCATION MAIN-East
11 I
TOTAL M SQ. FT. 48
Prairie 12-1 12-2
12-3
12 22
21
12-4 12-5
22 21
12-6
21
12-7 12-8 12-9
21 21 21
ital 209
CONOCO TRANSPORTATION ABERDEEN WAREHOUSE
CONTENTS Compounds Dry Blend Export Resin Conoco Resin HDPE Resin Export Resin Conoco Export Resin
3-6 4 6 9 4
2.2
.3 3 .6
V
Conoco Resin
""
4.4
Resin O.G.
Mill Scraps
.2
Cmpd 0. 6.
1 .0
Dry Blend 0. 6.
.1
Sifter Overflow
.2
Resin 0. G. `Compound
1 .7 .1
Resin
3.0
Raw Material
.2
Resin 0. G.
4.0
Conoco
4.5
Conoco Resin Sub-Total (Plug-Aisles)
3.8
Total Conoco
_29_
*
ESTIMATED MM POUNDS ON FLOOR OPEN TOTAL
__ 5;. 5 . 4.5 LA__ l.i__________
10.0 1.5
2 . 2 __ 1:. 3_____2.5
* -3 9 *4.4.
3.5 3.5
2.2 2.5
3- .3. . * 4 Q.. * a 5
*3.8
*
.2 3.5 3.5 3.5
3.5 -2L5..
3.1
34. 2 7.4 41 . 5
DTH 000021580
ABERDEEN FIRST-AID CASES 12 MONTHS MOVING AVERAGE
C
c
o o
X
( *>u2w ctu/
Uh >H
*"3
i--i
c
DTH 000021581
ABERDEEN OSHA RECORDABLE INJURIES 12 MONTH MOVING AVERAGE
20
15
10
5
0 DTH 000021582
MONTHLY HOURLY TURNOVER
DTH 000021583
ENERGY USAGE
DTH 000021584
Monthly
12 Month Moving Average
ABERDEEN PLANT PRODUCTION
UlNI
MM POUNDS
'HL' 1980
CUMULATIVE
35 30 25 20 15
6
5 4 3
2 1
6 5 4 3 2 1,
2
I
0
----------- ACTUAL ----------- CUMULATIVE
DTH 000021585
OFF GRADE
ABERDEEN PLANT QUALITY PERFORMANCE 1980
STANDARD 0.41
-------- ----J---------------
------- hi iMi'XJ LINtt- rHn-GRADE --------..-------:---1r----.--------------------- ' -------------- 1 -------------1
--------------- ----------------J --------------- ----------------J
- ** --
"
- .. . . --
-4
---------------1
- -JV-
______ -- L--------------
--- 1----------
"'7/' ------
L ,i --
\ X1--------
. --------------
.......-f-
--
i
- - --l] --
p-
J-
1 y`~
N/.......
_____ __
-~~TT L-------- -----
--
* - -J
-- -------- ---- -- ----
-- -------------
_____ I'll - -_____ ' ;__ __ ;
_ . ...
------- V -- -- \--f ~
.............. -1
bt-..
________ V
--*
--
............ 1
''
~
-------------------- --
-- --------------------
--
.-.-.-.-.-..-.-.-.-.-.---
.. . -----------.--
_______ _ __________
'
- -- ---
-- -- L------------- --
----- -------- -------- ---- ..-- ---- t__________ _________ _ ________ _
L_ .... -
"
'-
.
__ ______
-- '
.. .
STANDARD 1.35
w*Uiwr
1
MASCM
E-IL
Htr
JUNE
--
AUGUST
$ CB1CM Bf
OCTQttB
HOVfMfllJj
OECCMltB
O
; 00
0!
DTH 000021586
ABERDEEN PLANT EFFICIENCY 1980
POUNDS OF RAW MATERIAL/POUND OF PRODUCT
DTH 000021587
ABERDEEN PLANT INVENTORIES
DTH 000021588