Document OEEkZ9LrkvJwbw411xKGJ09JQ
J.45
In t e r n a t io n a l Sme l t in g a n d Re f in in g Co .
BAST CHICAGO. INDIANA
MEMORANDUM
to X* Bowl, General Superlntandcnt
f r o m pt s, Tommy,
SUBJECT!
d at e January 23th, 1946
I am anoloalng herewith Appropriation Requeat No* 1TX for tha amount of #19,900*00 to ooTar tha ooat of a Laadad Zina Packing Plant far tha Oxido Department*
Such a plant baa been designed following about tha equljmant now uaad far compounding and packing laadad sina oxides* Thara arc soma improvements however* It la propoaad ta nova thia antlra operation to a operate building *iera other lead-free producta will not ba affected. Building #909 aa noted on the attached nap* In building thia new plant it will ba poaalbla to ocmatruot all of thia equipment *o aa to ba duet tight and ta provide adequate ventilation where duet cannot ba avoided* A stationary vaouun cleaner will ba provided with auffiolent outlet to tha vnrlona location! ta make it easy to olaan tha floora*
Tha plant will receive lta sine oxlda by truck and ba loaded from tha truck ta tha car of a nanorall system which convaya it over a monorail aeale ta tha sixer bine. Lead aulphate will ba delivered by truck and hand trucked to tha nixara where both tha sine oxide and aulphate in weighed eaiounta will ba dumped into the mixer. The mixer la hooded and fully protaeta tha workman agalnat duat from thia operation* After mirtngt the laadad Bine la elevated and conveyed to a floor above whore it la aareanad through Botex aareena and conveyed and elevated again to a bin above tha packer* A St* Bagla bag packer, which wae purchased for thia purpoae am Appropriation Ho* 167* together with motora, etc*, ha a bean delivered and la ready now to ba inatallad* Hr* Xhox and myaalf aaw aueh a packer in operation in St* Laula on'white lead laat December. Zta /vS, installation will eliminate all duat hanard in paoklag* A bag preoa will have ta ba inatallad to get the loaded akida in chape ta warehouae aa they cannot ba piled one cm tap of the other without being proceed* Tha fan and motor for duat collection la on hand together with cue AAA Ihreooo ; nit : Thia bag collector la too maall for the job and another of equal . nine waa approved am Appropriation Ho* 168*
C T Two sen ahoald pack 10 tone In eight houra and have time to keep the entire plant clean and the machinery oiled* By the addition of a fork truck and a total of 8 - 6 men tha plant would have a capacity of . S4 - 80 tana in eight houra*
: . Xslating trecka will provide loading facllitlea at the Wilding*
. Tha eohplntlan of thia plant will provide oafa working oomdltlona 'r for compounding and paoking laadad sine oxide* in a building aeparatc from
whore lead-free grades era handled*
PNYC 00013204
TST/fa anal*
Fprm 192--2M--4*41 /
LEADED ZINC VACK1M PLANT - PUDS DEPARlliiaT ENGINEERING DEPARTMENT
EAST CHICAGO PLANT
Estimate No___ ________1Dwg. No------------------------------------------ -------- Date........
TITY
DESCRIPTION
MATERIAL DELIVERED
UNIT ON
LABOR
LABOR
TOTAL
Claaring Sit# Taarlng out oonorata at motor atoraga Bamora aoraan partition Bamora Monorail Bamora Oallary
Bamora Maehlnary
-
-
Bulldlnm Ohanmaa Batalnlng vaU 192'x9'-1728* 1728+87-64 Yda. 0 *10./Yd. placad in form Xxoaratlon for wall 16' cu.ft./ft. x 192 3180+87-115 Ida, Balnfowing 192x4-768 + 192x14-5376-6144' 6144'x.85-5200# X *4./Cwt. forma 8 man - 04 Hra. Thru roda, waahara and nuta 58x15x6.008# (15x5) - 5000# x 5 50* Anchor bolta# ato. Mucking - 4' daap 60x30-1800x4-7200+87 870 O#.90/Td. Baekflll 270x8 - 540 Ida. 8#1,00, including hauling with hand labor floor 64x58-2048x8/5-45 Ida. |10. in plaoa on platform and flnlahlng
Rainforoing 5/4" (round roda) 12" eantar lina 65x55x2-4300 O#4./0wt.
180.00
-
190.00 90.00
200.00 20.00
-
-
90.00
160.00
* 79*00 # 75.(X
18.00
18(X
10.00
10.<x
49.00
49.01
180.00 180. PC
$ 988.00 '$ 928.0< !
ii
910.00 1i 43,00
90.00
510.0 225.0
90.0
45.00 250.00
235.0 540.0
40.00 20.00
240.0 40.0
245.00 243.0
450.00 450.C 410.00 500.C
30.00 190. C
Estimated. By------------------ --------------------------------------------------------
Approved By
PNYC 00013205
N13385.01
Form 192--2M--4-41
l e ad e d z in q p ac k ih e p l a h t - o x id e d e pa r po mt
ENGINEERING DEPARTMENT
- EAST CHICAGO PLANT
Form t2--2M--4 41
ISAD1P ZINC PACgNO PLANT - COOPS DgPARTMBST ENGINEERING DEPARTMENT
EAST CHICAGO PLANT
Form J92--2M---Ml
______________ ISADO ZINC PACPHG PLANT - HTTP* DgARTMWf ' ENGINEERING DEPARTMENT
EAST CHICAGO PLANT
Estimate
jMLi
Q TITY
______ Dwg. NoJ>!HData........
DESCRIPTION
MATERIAL DELIVERED
UNIT ON
LABOR
LABOR
TOTAL
Rotax Sarssns, Drarar 7dn and Conrayors for Saraaning
Orarhaul and rsbmlld thraa rotax Supports and Installation 3 - SEP motors with startsrs lnstallad Drarar fasdsrs, oomnaotlons, supports, llna
shaft SHP motor and installation
3 bins rar Drarar faadara lnstallad 3 syntron rlbrators 60* aaraw sonrsyar lnstallad 8 -0HP motors lnstallad Powsr
1 48.00 -
>40.00
800.00 800.00 108.00 400.00 840.00
-
$1,430,00
90,00 i 138.0C 100,00 103.OC
860,00 000,0C
280,00 420.00
100.00 300.00
- 1O0.OC
800,00 600.OC
870.00 100.00
510.OC 150.0C
1,400,00 >8.830.0C
Ysntllatlng Systam Hoods for mlxsrs, fan and motor oo band Satting fan, motor and wiring Piping from hoods to fan and to Drasso
also paohsr hood, oma Draooo on hand Supports for both Drasoo units, morlng
and oraatlng
Yantllata St, RagIs paohsr to Draoeo Soraw oonrayors from Draooo to mlxar 30*G#9. SHP motor with drlrs, ato.
Ylbrators 4 small .
-
-
00*00 70,00 800,00 170,00 100,00 # 898.00
800,00 208.0C
410,00 410.0'
300.00 70.00
530.0 140.0
70.00 110.00
8TO.0 890.0
40.00 148.0
L810.00 >1,810.0
_________
PNYC 00013208
1i
Eecimated By.
Approved By-...,
I92--2M--4-41
L3CADSD ZINC PACKING PLANT - OXIDB DEPARTMENT ENGINEERING DEPARTMENT
EAST CHICAGO PLANT
m Dwg. No._?r^.Dt.
Q TITY
DESCRIPTION
MATERIAL DELIVERED
UNIT ON
LABOR
LABOR
TOTAL
SS. Priii Air Ccnpraasor and rooalrar
640.00 540.00
* 980.00
440.001 1,G80.C 540.00 680.( 780.00* 1,760.<
Menora11 (On kind) Installation floala Bopalr buggiaa
lo &dnorlnc tad oontinganolaa
30.00 430.00
33.00 # 813.00
*1,200.00
180.00 -
1OO.0C 880.001
180.C 430. C 135.C
765.C
974.00 *1,174.<
Qrtnd Total
9,173.00
t 10,18100|l9,300.<
Estimated By.
Approved By.
PNYC 00013209
REASON WHY APPROPRIATION IS REQUESTED Tfca amount of %hl* appropriation will prorida nfi oparatin*
aonditiona for tha man paokiiif loadod slna ozld# mod plooo tha oparatlom la an axlatlag building away fro* any ohanoa of aomtaminatlng our laad*fraa gradaa of nlna oxida.
EtdmatM of the Coot of All Conttrucdon Orders and All Spocial Ordera Amouniini to 1200.00 or Over Mutt be Submitted to the Manager for Approval Before the work it Undertaken. No Inatrucuont to Start Work Should bo Ittued Prior to Securing Such Approval or Until the Chief Clerk hat Patted Upon the Ditpotidon of the Expenditures.
rOHM Pr 2M 4-4*
ESTIMATE NO._
171
LABOR
ESTIMATE COST
_C. O. NO_____________________ ___
_S. O. NO..
SUPPLIES AND EXPENSES
OlMTlng Sltt Building Changaa Vacua* Claanar Slavator Mlxtra Seraana, faadara * Cozrraxora Ventilating Sjrata* Bag Praaa Monorail 10% Engineering k Ooatlnganelea
328 >0 3,667 X>
200 )0 130 X) 883 00 1,100 00 1,213 00 700 00 290 00 971 00
IJ
2,782 00 1,000 00
288 00 HI 00 1,130 00 898 00 - 980 00 818 1,200 00
H0,127 00
La b o r
, $.
Su p p l ie s Ex p e n s es
To t a l s _
io,m.oo 9,173.00
19,300.00
PNYC 00013211
I 9,it s 00