Document OEBbwV6gM8M9YBN51MOv9DLqX

/<&-</3 /> r- FR-A-7 BOILER by AMERiCAN-c^taudaitd v Installation-Operation AND Maintenance Manual FOR BOILER-BURNER UNiTS . FOR OIL HEATING First in heating ... first in plumbing BP-7957-FRA7 00267 VN V S FECIAL IISTXVCTIOIS FR-A-7 SERVICE DOOR b Plate Box Sundry Parts Bag contains a steel retaining plate and a 1/2" steel washer which replaces the cast iron catch plate norm ally provided for securing the Service Door on oil boilers. Install the 1-1/2 V square head bolt In the bolt pocket, add the 1/2" washer, retaining plate and nut In that order after mounting the Service Door. \ With the plate in position over the door latch, align the door with the door seat and tighten the nut. Loosen nut and turn plate as re quired for access to the combustion chamber. FORM FR-A-7 SUPP. 2-66 <. t 00268 FR-A-7 BOILER j NOTICE MR. STEAMFITTER! Use regular steel nuts and flat washers for assembling boiler. Apply oil or grease freely to j lie rod threads while assembling sections to prevent stripping of threads on rod. | A/ter drawing up boiler, remove steel tie rod nuts at front of boiler and place sheet metal. COMPRESSION WASHERS on rods with open (cupped) side against regular washer. Place SAFETY NUTS on front end against compression washers and leave regular s&mI nuta on back end of tie rods. Lubricate nuts well and tighten with FINGERS ONLY. FAILURE TO OBSERVE THIS MAY RESULT IN DAMAGE TO BOILER * raowT /coMfurtsiOM ' wAtKia AC* /. ti & /sarmr hut STO nut eb<Lt tic aoo mat IMPORTANT! 00269 See Instructions Page 4 on proper setting of boiler for installation. When boiler sections have been assembled, it is essential that boiler be tested for leaks before platework, Jacket'or piping As installed. BEPORE FIRE IS STARTED IN BOILER, pluj'all boiler tappings and rill entirely with cold water. To protect and safeguard the' accuracy of Bteam or water gauge supplied, DO NOT INSTALL GAUGE UNTIL AFTER TESTING OF BOILER OR SYSTEM. Testing pressure should be at least 10 pounds but should not exceed 50 pounds. EXAMINE BOILER CAREFULLY, INSIDE AND OUTSIDE, to Insure against leaks through concealed breakage caused in shipping and handling. After making certain that there are no leaks, remove plugs for bolier trim and other connections. This precaution is for your protection and will simplify handling of necessary replacements and adjustment claims. DRAIN TAPPING Back of boiler is provided with drain tapping at lowest water Bpace practicable, as per A.S.M.E. Heating Boiler Code. Tnls tapping must be used to drain boiler entirely. DO NOT PLACE DRAIN COCK IN RETURN PIPING LINE. Installer should provide suitable drain connection before assembling Jacket to boiler. EXTERNAL HEATER TAPPINGS Boilers are provided with two 3^ 'tappings on Back Section below water line for external water heater. Knockouts must be removed from rear Jacket panel if these tappings are used. CAUTION -- WATER BOILERS The expansion tank should not be oet in a cold or an exposed place. II the pipe leading to or from the tank freezes, serious damage rr.3y result. If valve of any description 13 installed in the piping leading to or from the expansion tank, RE SURE THAT IT IS OPEN Ml!ILK TilK BOILER IS IN OPERATION. FR-A-7 BOILER USE THIS BOOK FOR REFERENCE WHEN ERECTING BOILER, ORDERING PARTS AND FOR OPERATION x m % -* HEAD CAP SCREWS. 3-REQ'D. 4-RQD. PER SIDE PANEL FOR'8, 9 4 10 SECT. PER SIDE PANEL FOR 11, 12, 13 4 14 SECT. STEEL PEDESTAL BASE (Optional - Boiler must be pitted to depth of aub-baBe If sub-base is not used). 00270 FR-A-7 BOILER Section* isuet be aaeenbled according to the arrangement* listed below to insure proper operation of boiler and that Jacket openings match with connecting sections. CODE LETTERS FI - Front Connecting CX - Center Connecting FC - Front Center C - Center RC - Rear Center RCX - Rear Center Connecting BX - Back Connecting V 3 STEAM BOILER NUMBERS OIL-FIRED ARRANGEMENT 0? SECTIONS FROM FRONT OF BOILER 1 2 3 a 5 6 7 8 9 10 11 12 13 ia rro rv c " TW- r _ p ---w-- FR-A-706-S0 FX C ex c RC BX FR-A-707-S0 EC C C cx c RC EX FR-A-708-S0 FX FC c cx c RC RC BX FR-A-709-S0 n FC CX c' c cx RC RC BX FR-A-71O-S0 FX FC cx c c ,/.CX C RC RC BX FR-A-711-S0 EC re re cx C ; re CX RC RC RC El FR-1-712-SO FX FC FC cx c c CX C RC RCX RC FR-A-713-SO EC FC .FC cx c c cx C C BCX RC FR-A-71L-SO FX FC- FC cx c . c CX C c CX RC EX RC EX RC BC EX WATER BOILER NUMBERS OIL-FIRED 12 3 ,a 5 6 7 8 9 10 11 12 13 Ui vPR-A '70 TfO. --Fat--c--re---e---a- -- FR-A-706-WO FX c cx c RC BX FR-A-707-U0 EC c c cx C RC EX FR-A-7084.*o EC FC c cx C RC RC EX FR-A-709-VO EC FC cx c C CX RC RC BX FR-A-710470 EC FC cx c c CX C RC RC EX FR-A-711-V.'O FX Ffi FC cx c c cx RC RC RC HI FR-A-712-..'O FX FC FC cx c c CX C RC RCX RC FH-A-7134/O EC FC FC cx c c CX c C RCX RC FR-A-7U-\fO FX FC FC cx c c CX c C CX RC EX RC El RC RC SI NOTE i *1" in code designates U" tapping 00271 FR-A-7 BOILER 4 1. IMPORTANT - In Betting up the boiler, it 1b necessary that adequate clearance and combustion space be provided for* proper functioning of the oil burner. Where necessary, boiler should be raised by bricking up base or pitting to provide required head room or clearance between boiler crownsheet and oil burner. Fig. 1 OPTIONAL STEEL PEDESTAL BASE - An 8" steel pedestal base is available for optional use in elevating oil boilers to obtain more clearance between the boiler crownsheet and oil burner. The steel base is used for 8-section and larger boilers. When provided, the steel base must be assembled by the installer. Each of the two side channels have two or more 3/8" tapped holes in one flange only. THIS FLANGE MUST BE AT TOP when base is assembled. If not provided, the boiler must be pitted to the depth of the lub-base (8"). Bolt a corner angle piece to each end of the Front and Rear Channels between flanges. Angles must be flush at each end. Leave bolts slightly loose. Place the end channels between the'/side channels and bolt corners. Use 1/2" bolts and lock washers as provided far entire base assembly. See Page 2. See that all corners are square and that sides and ends are in the same plane, then draw all nuts up uniformly tight. Assemble 3/8" Fillister Head Cap Screws provided, in all of the tapped holes in the top flange of the side channels. Level base in final position with regard to chimney before mounting cast iron base. 2. CAST IRON BASE - Bolt side base panels together (except for 5-section boiler) with 1/2" x 1-1/2" bolts provided. Tighten nuts only moderately. Six- through 10-section boilers have two-piece Bides, 11- and 12-sectlon boilers have three-piece sides. Assemble the bolted side panels to the Front and Back base panels with the ribs Inside. Use 1/2" x 1-1/2" bolts and tighten nuts only moderately. See that all corners are square and that bolted side panels are in proper alignment before tightening nuts on all bolts, then level base in final position with regard to chimney. See Fig. 1. Cover plates are provided for unused openings in the base. Before starting assembly of sections, installer should attach large connecting arm opening cover plates to the front base panel and small cover plates with straps to the back base panel. Close the draft opening in the back base panel with sheet steel cover plate and four screws provided. 00272 FR-A-7 BOILER 5 Fig. 2 Fig. 3 00273 3. ASSEMBLY OP SECTIONS -- Center the front section on base and support with prop. Important! The two 3/8" tapped holes in the front section at either side of the clinker grate opening must be in line with the elongated holes in the front base panel. Clean nipples and nipple openings with Kerosene or gasoline and apply good lubricating oil. DO NOT USE PAINT OR RED LEAD. See Pig. 1. Drive nipples squarely into approximate final position using block of wood and hammer or preferably an aluminum headed hammer if available. See Page 6 for instructions regarding nipples and use of nipple setting gauge. Paint ground Joints of each section with red lead before adding next section. Prom arrangement of sections (see table on Page 3)# select next section according to code letters on section. IMPORTANT - SECTIONS MUST BE ASSEMBLED IN PROPER ORDER AND PACED CORRECTLY. Word FRONT on FC section and word REAR on RC and RCX sections indicates how these sections are to be faced in relation to front of boiler. Sections marked C or CX are reversible in boiler. Clean nipple openings and place sections on nipples in front section. To facilitate assembly, it is advisable to enter the upper nipple ilrst in its port, then enter the lower nipples in their respective ports. Place nut and flat washer on one end of each of two tie rods and insert tie rods from the rear, one in each of the two holes on either side of the upper nipple port. Place plain assembling block together with nut and washer on each of the two remaining rods and insert, from the rear, one through each of the lower nipple ports and tappings in the front section. See Fig. 2. Place large draw-up clamp on each of the upper rods and small draw-up clamp on each of the lower rods. Insert loose Jaws in clamps and tap lightly with hammer to Insure tight grip on rods. Pig. 3 shows clamp and nnri til on for drawing up sections. FR-A-7 BOILER 6 Fig. 4 4, Drive section In place with heavy block of wood, striking blows .as squarely as possible over nipples. Draw-up evenly on all tie rod nuts starting with lower tie rods. Tighten nuts alternately until sections make contact at ground Joints. Continue assembling sections in their respective order. NEVER ASSEMBLE MORE THAN ONE SECTION AT A TIME. NOTE: - AVOID DAMAGE TO THE TIE ROD THREADS WHEN ATTACHING DRAW-UP CLAMPS AND WHILE DRAWING UP SECTIONS. APPLY OIL OR GREASE FREELY TO TIE ROD THREADS WHILE ASSEMBLING SECTIONS TO PREVENT STRIPPING OF THREADS ON ROD. Special nipple setting gauge is provided for larger nipple. Gauge nipple In both directions to Insure that same is driven squarely and to proper depth into nipple opening. Cutout in gauge must rest on nipple, with legs of gauge touching finished face of section, when nipple, is properly driven. See Fig. 4. Use rule or suitable gauge for smaller nipples, to insure that same are properly driven and project equally all around. Nipples must project 1/16" more than half their length outBlde of finished face of section. It is important that nipples be driven as directed, to insure tight Joints. Most nipple leaks are caused by tilted or cocked nipples. 00274 FR-A-7 BOILER 7 5. Remove upper and lower tie rods with draw-up clamps and assembling blocks. Place Back on base and engage nipples. Insert tie rod In each of the two upper cored holes and through the lugs on each side of the Front and Back sections. -- " Place regular steel nuts and flat washers on rods and draw nuts up evenly on all four rods until Back and next to Back sections are tight at ground Joints. 6. AFTER SECTIONS ARE ASSEMBLED COMPLETE: Remove steel tie rod nuts at front of boiler and place sheet metal compression washers on rods with open -(cupped)side against regular washer. See that upper rods do not project more than 1/4" beyond face of Front and that lower rods project equally at front and rear. Place safety nuts on front end of tie rods against compression washers. Lubricate nuts well and tighten with fingers only; failure to observe this may result in damage to boiler. See Page 1. By use of pinch bar adjust the entire boiler assembly on its base as found necessary to enter two 3/8" x 1" hex. head cap screws with flat washers into the front section tappings through the two elongated holes in the front base panel. See that the boiler assembly is against the front base panel and then draw both cap screws up tight. 1. Paint ground seat on face of back section with red lead and attach smoke collar with 3/8" hex. cap screws provided. See Fig. 5* Attach flow and return piping lines and insert all bushings and plugs in sections. IMPORTANT - See instructions for testing boiler on Page 1. FR-A-7 BOILER 8 Pig. 7 8. Refractory crownsheet baffles are provided for the 5- through 7- section boilers. The baffles are assembled by entering the boiler through the door opening In the front section. Either baffle may be placed first as far back as possible, with the straight or bottom edge resting on lugs located at either side of the back and next to back sections. Rest the upper rear end on the cast-on lug located on' the center face of the back -section. Place the remaining baffle on the side lugs as directed for the first baffle and raise the upper edge approximately to the crownsheet. Raise the upper edge of the first baffle and Interlock the two upper edges as the baffles are lowered together. Four upper and two bottom hot flue baffles are provided for 5" to 11-sectlon oil boilers inclusive. The b'affles with rectangular ends are used in the two upper and two intermediate outside flues on each side. The baffles with the angular shaped ends are used In lower outside flues. The hot flue baffles should be installed with ends at the Joint line (high point) of the NEXT TO FRONT section for 5- to 10-section boilers inclusive, and with ends at the Joint line (high point) of the second from front section for the 11-sectlon boiler. Baffles should rest on the short projections cast on each end. See Page 14. 9. Putty outside of sections at Joints with boiler putty also at Joint between front section and front base panel. Grout between bottom of sections and base and between base and floor with a mixture of one part of Portland cement and three parts of asbestos cement. 10. ASSEMBLY OF JACKET - Attach left lower front panel and right lower front panel using 1/4-20" x 1/2" washer head Jacket screws. Do not draw screws up tight. 11. Assemble four special hexagon Jacket Btuds, as provided, in 3/8" tappings on face of back section. Remove knockouts as required for pipe connections and controls from both halves of the rear Jacket panel. 00276 Attach the right hand half (viewing from front) of the rear panel, then the left hand half to the Jacket etude ueing 1/4-20" x 1/2" waeher head ecrews. Ineert Jacket ecrewe in all holee of the Joint, at center. 12. JACKET SCREWS - Except as noted. Jacket ie assembled with #10 x 1" sheet metal ecrewe throughout. Screws should 'be inserted in all holes of adjacent panels as assembly progresses. ' DO NOT DRAW SCREWS UP TIGHT UNTIL JACKET IS FULLY ASSEMBLED. 13. Place right front side panel in position with offset at bottom, back of the top edge of the base side. STEAM BOILERS ONLY - Remove knockout pieces for gauge glass and try cock fittings before assembly. See that front panel is outside of the projecting lug on corner of tne front base panel, then attach side panel to front panel. See Fig. 6. 14. Assemble right hand intermediate panel (except for five-section boiler), then the right hand rear side panel. 15. Place the upper front panel in position and insert sheet metal screw in the remaining hole of the right front side panel. Assemble the left front side panel and remaining left side panels same as directed for the right hand side Jacket panels. 16. Assemble the top Jacket panels in the following order. Right hand front, right hand intermediate, except for 5-section boiler, then right hand rear. Assemble the left hand top panels in the same order using #10 x 1" sheet metal Bcrews except for the center Joint where #10 x 1/4" sheet metal screws are provided. After Jacket is completely assembled, all screws should be drawn up uniformly tight. 00277 FR-A-7 BOILER 10 17. Attach door hinges and catches and make only moderately tight. Lug on back of hinge or catch must rest on lower inside edge of pocket. Doors should lift over catches easily and seat firmly against section when closed. Correct adjustment is obtained by tapping hinge plate (near top) on inner side in case door binds on catch. Catch for cleanout doors may be moved up slightly/ if required/ to facilitate fitting/ If door does not engage catch properly, tap outer side of hinge plate near top. Tighten bolts after adjustments are completed. 18. STEAM BOILERS - Install-pressure and vacuum gauge, water column trim, automatic regulator and safety valve. In case ofVterritory where one 3" or two smaller safety valves are provided; it will be necessary, to remove the knockout from the rear .Jacket panel opposite the uppermost,3" tapping on the back for safety valve Installation. No. 2o9 Low Water Cutoff is available for optional use on steam boilers. Pig. 7 shows oil-fired, steam boiler assembled complete. .' Fig. 8 shows rear view of automatically fired steam boiler assembled complete. 19 WATER BOILERS - Install combination altitude gauge and thermometer. Install relief valve, see Table on Page 16 for location. FILLING SYSTEM , / CAUTION: Never start boiler unless it is-properly filled. Steam boilers should be filled until water is visible approximately half way up In the water gauge glass. After boiler is in operation, make-up water should be added slowly. Fill open hot water system 1/3 height of expansion tank. Remove rim and glass from the Altitude and Temperature gauge and set movable pointer under the automatic pointer, then replace rim and glass. When filling a closed hot water system, the pressure must not exceed 50 pounds. If it does, it must be relieved immediately and the relief valve failure Investigated and corrected, otherwise pressure may build up and cause damage to heating system. 00278 FR-A-7 BOILER 11 ATTENTION TO BOILER WHILE IN OPERATION Keep water In steam boiler approximately half way up in the water gauge glass. Keep open wa*. er system filled to 1/3 of expansion tank as Indicated by the moving hand being even with the stationary hand on the Altitude, gauge. PRESSURE MUST NOT EXCEED 50 POUNDS ON ANT SYSTEM. IF IT DOES, IT MUST BE RELIEVED IMMEDIATELY AND THE CAUSE OF PAILURE INVESTIGATED AND CORRECTED, 0T.L2RWISE PRESSURE KAY BUILD UP AND CAUSE DAMAGE TO HEATING SYSTEM. Clean boiler surfaces at regular intervals. Keep radiators and convectors clean. ' -V Do not draw water from boiler while in use. When adding water 'while boiler is in operation, do not open supply valve fully but add water slowly. : On Steam Boilers - at the start of each heating season and once or twice during season try SAFETY VALVE to be sure it is in working condition.' To do this fasten wire or cord to lever of valve and pull lever - standing a safe distance away from valve. If a hot water radiator is hot at the bottom but not at the top, it indicates that air has accumulated inside and should be vented. To vent radiator: Hold small cup under air vent (located near top of radiator), open vent until water escapes and then close. If much water Is added to system, it is advisable to heat system to a high temperature and vent again. Tills will make less venting necessary during the winter. , Where an expansion tank is used, make sure that neither the tank nor its drain pipe is exposed to freezing temperatures. If valve of any description is installed in the piping leading to or from the expansion tank, BE SURE THAT IT IS OPEN WHILE THE BOILER IS IN OPERATION., ATTENTION TO BOILER WHILE NOT IN OPERATION At end of heating season clean boiler-surfaces thoroughly. Spray flue and firebox surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all corners. Leave boiler doors open to permit air circulation through boiler. Clean and remove sraokepipe where feasible and oil door hinges. With steam boilers, at end of season add sufficient water to fill boiler to top of water column and leave it that way until fall, when water should be drained again to proper level. If at this time boiler water is dirty, drain water, flush out boiler, and refill with clean water to prescribed water level. On water bollerB keep system filled with water. In other words, leave water alone. It is advisable in fall to drain a little water to remove sludge, but not more than necessary. I? BOILER IS NOT USED DURING WINTER TIME IT MUST BE FULLY DRAINED (See Page 1). 00279 FR-A-7 BOILER COMBINATION ALTITUDE AND TEMPERATURE GAUGE FOR WATER BOILERS IMPORTANT - To avoid damage to Gauge or possible impairment of its accuracy, DO NOT INSTALL UNTIL BOILER OR SYSTEM HAS BEEN WATER TESTED FOR TIGHTNESS. Combination Gauge is used with water boilers and is connected into?' tapping at front of boiler. Gauge serves to indicate the following: 1. Temperature of water at the boiler. 2. Height of water level 1-it feet above the gauge for OPEN SYSTEMS w:iere expansion tan/. Is used. ;V 3. Water pressure in pounds per square inch for CLOSED SYSTEMS where pressure is controlled by means of automatic relief or regulating valves WITH or WITHOUT use of air tight pressure or cusnion tank, IN CASE OP OPEN SYSTEM, where expansion tank Is used. It will bev necessary to fill system with water up to 1/3 of the expansion tank as directed under "FILLING SYSTEM." The rim and glass in gauge should then be removed after loosening two screws or other means of holding rim in place. It will be found that the automatic pointer on the ALTITUDE SCALE, which indicates HEIGHT IN FEET and PRESSURE IN POUNDS has moved up and indicates height of water level above the boiler in tne expansion tank,.- Tne adjustable pointer (generally finished in color) should then be moved by hand UNTIL DIRECTLY UNDER AUTOMATIC POINTER. " Any loss of water within the system will be Indicated by the AUTOMATIC POINTER receding'to a smaller figure on the Altitude Scale at which time the water supply should be opened until the Automatic Pointer is again directly over the Adjustable Pointer. After setting Adjustable Pointer, replace rim and glass and tighten screws! 00280 PR-A-7 BOILER 13 CLEANING BOILERS The grease used to lubricate the cutting tools during erection of new piping systems serves as a carrier for Band and dirt, witn the result that a scum of fine particles and grease accumulates on the surface of the water in all new boilers, while heaver . particles may settle to the bottom of the boiler and form sludge. Tnese impurities tend to cause foaming, preventing the generation of steam and causing an unsteady water line. This unavoidable accumulation of oil and grease should be removed by blowing-off the boiler as follows: If not already provided, install a surface blow connection of at least 1-1/4*' '.nominal pipe size with outlet extended to within 13" of the floor or to sewer, inserting a valve in line close to boiler. . Bring the water line to center of outlet, raise steam pressure,.and while fire is burning briskly, open valve in blow-off line. When pressure recedes,close valve and repeat process adding water at intervals to maintain proper level. As a final operation, bring the pressure in the /' boiler to about 10 pounds, close blow-off, stop the burner, and open drain valve. After boiler has cooled, partly fill and flush out . several times before filling it to proper water level for normal service. The.use of soda or any alkali, vinegar or any acid is not recommended for cleaning heating boilers because of the difficultyof complete removal and the possibility of subsequent injury after the cleaning process has been completed. Keep system in good repair. It is advisable to have it inspected by your heating contractor at least once a year. GIVE BOILER SIZE and SERIES NUMBER WHEN ORDERING REPAIR PARTS 00281 FR-A-7 BOILER DIMENSIONS 4 pipe TAPslLOr:^rSETrc^T s,\ FLUE BAFFLES** zisTf^-fr DIA -BAFFLE Of SECTIONS A 5 14 C 14 7 14 OlWCNS^NS ac >*i *7i 0E i NUMBCft'Of NUMBER Of *' FLOW * RETURN L TAKINGS Tappings it 35 30 3 i ili 3 X 2 msoc wcth of combustion ouustN ta* 14 SECTION THRU OIL FIRED BOILER BURNER UNIT 4A* pKtipKrt TiaAPkCs^^l0FcOaRtiOFLNOWseTeAPcPhINaGrt CODE LETTERS FX --FRONT SECTION FC --FRONT CENTER SECTION C --CENTER SECTION CX-CENTCR CONNECTING SECTION RC"RCAR CENTER UPTAKE SECTION RCX- REAR CENTER CONNECTimC SECTION BX-BACK SECTION V-IN COOC DESIGNATES 4* TAPPING NUMBER Of SCIONS ARRANGEMENT Of SECTIONS '5 . s 7 t 10 II It IS 14 FX C C C x ft C cx c RC BX ft c c CX c RC IX ft FC c CX c RC RC BX ft FC CX c c cx RC RC BX ft FC CX c c CX c RC RC IX ft FC FC CX c c CX RC RC RC IX ft FC FC cx c c cx C RC RCX RC BX ft FC FC cx c c cx c C RCX RC RC BX ft FC FC CX c c cx C C CX RC RC RC Bx BAFFLES FOR 8 TO I SECTION BOILERS FOR 16 DIA FLUE PIPE / V NUMBER Or SECt'ONS A II a <0 a It ii 1* it s > >4 a a >Ti 1 i "1 44 'I 47 n 30 *i 33 34 number Or SuOTnjr *' rtCw 4" RETURN 0 l TAPR*NCS TARINGS J 43 "i i T,i "i 1 ao 1 '! *i M| 3 iMi ** Mi nO 3 4 4 4 3 3 t t 2 2 2 2 I SECTION THRU OIL FIRED BOILER BURNER UNIT see or coutu$TiON chamber w 00282 FR-A-7 BOILER DIMENSIONS 15 I n REAR WALL REFRACTORY COMBUSTION CHAMBER FOR 5. 6. L 7 SECTIONS I REFRACTORY COMBUSTION CHAMBER FOR 8. 9. & 10; SECTIONS HO Of ttCTlOH* 8 Oturwsm* *4' iMOir m ro*r picn 6i 10 'i REFRACTORY COMBUSTION CHAMBER FOR II, 12.13. & 14. SECTIONS HO Of SICTiOHS it it 13 1 4 O'UrNblUN '8* |Hpt C >N r b*'.m r\ '5 00283 Ffl-A-7 BOILER DIMENSIONS ---- * 16 t *' CENTER SECTION -0<L EEO SHOWING BATTLES i 4* PIPE TAP BACK vew-SHOWING CONTROL TAPPINGS APPLlCATiO*) OT CONTROLS TOR AUTOMATICALLY T<NtO SOURS LOCATION s*zt op ON BOiLC" PYPE TAP STEAM oilers WATER 0<LERS A OAwn* rcc NANOfWtO *OiLER MOT U?E0 '1 POP SaTCTY VALVE RtL*r valve C 1* low on o WATER <i*C* POP urn* VALVE External type 0 I* water hCaTER External tywe water heaTC* tlTCRNAL TYPE c ' water mCATCR External TtPC WATER NEATER CiTepnal type f 1 STEAM PRESSURE WATER TEWPERATLMC UWl CONTROL L-M-1 CONTROL 6 LOW WATER cur err R0TUSC0 rM WATER TEMPCOnTWOL WATER TEMP CONTROL OOnCSTC hot water DOMESTIC NOT WATER J <{ in SPEC TON OP wsnctoioR low orr tlppmc low orr tapwmg K rSPECTONOR WASH OUT TAPPM0 NSPECTONO" WASH OUT TAPPRlO rL DRAM TAPPYRC ORAM TAPTNNC 00284 FR-A-7 BOILER r MINIMUM PIPING RECOMMENDATIONS TOR AUTOMATICALLY. FIRED STEAM BOILCRS 4 17 BOILER BOILER RISERS HEADER EQUALIZER RETURN FR-A-70S 4` -S' 1 2 V | 2 V BOILER boiler RISERS HEADER EQUALIZER RETURN FR-A-706 ^R-A-707 4* 4' 5* 5* 2* 2 V 2V 2V FR-A-706 4- a* 2V 2V BOILER BOILER RISERS HEADER EQUALIZER RETURN FR-A-709 4* a' 2V . 2 V FR-A-7 1 0 41- 6' 4* ' sv FR-A-711 4* a' 4* 2 V BOILER boiler RISERS HEADER EQUALIZER RETURN FR-A-712 4' a- 4* 3" FR-A-7 1 3 4` e' 4' 3' PR-A-7M 4' B' 4' 3* MINIMUM PIPING RECOMMENDATIONS TOR AUTOMATICALLY FIRED WATER BOILERS WITH FORCED CIRCULATION BOILER BOILER RISER return RETURN HEADER FR-A-705 4' 4* 4* FR-A-T66 4' 4' . 4* tk-A-707 4* 4* 4' F R-A-700 4' 4" 4` FR-A-709 4' 4' 4' BOILER BOILER RISERS RETURN RETURN HEADER FR-A-710 4* S' 4' FR-A-7 1 1 4* S- 4' FR-A-712 4` S' 4* FR-A-7 1 3 4' S' 4' FR-A-7 1 4 4' ~~1 S' 4' 00285