Document OE3arOmyZwDY4p7gpRQaOx0Qw

Am. Soc. of Heat.-Vent. Engineers Guide. 1922 143 Table 5. Capacities of Steam and Return Mains for Vacuum Systems--Capacities in Radiation, Square Feet. A Pipe Size, Inches 'A X 1 m VA 2 2'A 3 3A 4 4A S 6 7 8 9 10 12 14 16 B Steam Rating 20 40 75 150 300 500 900 1,500 2,000 2,800 3,600 6,000 9,000 13,000 18,000 23,000 37,000 55,000 78,000 C Main Return 600 1,200 2,400 4,800 9,000 15,000 23,000 37,000 55,000 78,000 D Branch Returns Return Risers 400 600 1,200 2,400 4,800 Radiator Connections 100 200 400 600 Drips Inches X X X 1 1 1 m m m Table 4. Low P r e s s u r e G r a v it y a p o rV Length Factors--For supply mains where steam! and water are flowing in the same direction and for wet returns where lengths are other 'than 100 ft., multiply the factor here given by the sq. ft. of radiation to obtain the carrying capacity of the pipe. !' Length in Feet___ 200 300 400 500 1000 2000 30CO Factor ...................... 0.710 0.576 0.500 0.447 0.316 0.223 0.182 Supply mains to be sized according to Column1 B. ; Where branches to risers are taken from the top of the mains the main should be dripped at the end either by separate drip line or into the main dry return line through a trap. The end of steam mains, if reduced, to be one size larger than the table calls for. Where the main changes size branch connections should be taken from the bottom of the main and either connected into separate drip main or into main dry return line through a trap. If this is not done eccentric couplings should be used for making reductions. The bottom of risers should be carried down to the basement level and connected to separate drip main or into dry return main through a trap. In buildings where risers are 100 ft. in length or over, horizontal run-outs, to take care of expansion, or where necessary due to the design of the building, should have separate drips car ried down to basement into separate drip main pr into the dry returp through a trap.