Document ODd7VrBMZx3yLk1rQprn7eee

PLAINTIFF'S EXHIBIT CHV-562 STANDARD OIL COMPANY OF TEXAS' ENGINEERING " DEPARTMENT !- SAN'FRANCISCO SPECIFICATION-NO. MARCH 15* 1968 SECTION, NOc 3 ; PAGE 1 E-2691: SECTION'3 - PERFORMANCE OF WORK 3i01 WORK SPACE AND STORAGE AREA COMPANY Will; assign space, in the area shown on Drawing.i GT-A-2I43Q for CONTRACTOR0S office, work space, and storage .`area,, ... COMPANY can make .available for the :fabrication'Of *fhe : precast stanchions, a work .area other than the South Work Area, if CONTRACTOR soidesires, 3i'02 'TEMPORARY CONSTRUCTION' FACILITIES ; 3,021 CONTRACTOR shallisupply and install 'all- temporary facilities required for the prosecution iofphis workH-including*but 'not. limited -to, tool" rck^s,- . . locker rooms, toilets, office and storehoose^^ AllM temporary installations shall be subject to lapgroval .' by-COMPANY prior to Installation, . 3.022 In addition, CONTRACTOR shall-.provide :as required ......... for completion of'.thejob any .temporary equipment ' and/or material. including, but not-limited to, shoring, concrete forms,: bracing, laddersj scaffolding, staging, drop cloths and tarpaulins,: .! 3.023 CONTRACTOR shall'maintain all temporary installations, . including .'the :vapor barriers installed by others, in a safe and adequate manner an&remove: them immediately upon completion of -thework, ' 3 = 03 SORVBYING. . - 3,631 CONTRACTOR shall^perform:all- surveying necessary from: base lines - arid bench marks established by. COMPANY, . The accuracy, for all grades,; elevations, arid? plumbing of any structures and location *of facilities described in this Specification shall be rfche responsibility of -the CONTRACTOR,/ CHEV BB 0002685 STANDARD OIL I COMPANY OF TEXAS ENGINEERING . DEPARTMENT SAN^ FRANCISCO SPECIFICATION/NO,. E-2691h MARCH 15e 1968 ' SECTION NOW 3 PAGE 2 . 3,032 CONTRACTOR shall preserve all"permanent survey. - monuments and bench marks, ; In the revent-CONTRACTOR : disturbs - any permanent 'monuments or bench: marks they will be replaced by a Land. Surveyor acting under COMPANY S. ins tractions ; - replacement cost; will be; deducted from the sums -due or to become due:the CONTRACTOR,, 3.04 EXCAVATION AND BACKFILL ........................................ Earthwork shall be :in accordance with applicable rparagraphs of.SpecificationEG-58Io CONTRACTOR shall: haul.any excess, excavated material to a;.}location designated. by COMPANY* S Construction Representative , : Such location Will. be .within 559=0^ feet -of the ; job - site,,- and-within - Refinery, limits,:' 3,05 'GRADING ........ - CONTRACTOR shall return area grades as shown: on the : ; drawings, .: Finish grading .shall- fee as -described in Section ' 4;^I<?b#Vhis Specification, 3, 06 ~f MATERIALS HANDLING I AND- CORRESPONDING ; PAPER WORK : 3,061 CONTRACTOR shall receive from-any one of several storage areas located on COMPANY'S premises the : material: and equipment furnished by. COMPANY and required for the'.work described, in Section 1,1 of this Specification, Any material;and, equipment . listed on ;.the. Equipment'List-Drawing . GT-D-21601 arriving after CONTRACTOR has commenced work Shall be received and unloaded by CONTRACTOR from: trucks - or rail cars,.............. i /3,062. CONTRACTOR0 S ! requests- for' withdrawal of COMPANY furnished material`and equipment-shall :be based on-, quantities. shown - on drawings or Lists of Materials furnished by COMPANY, . CONTRACTOR shallobtain approvalhfrom COMPANY" S ' Construction -Representative : i before materials in - excess of the quantities shown on the .drawings or Lists of Materials will be .issued. CHEVBB 0002686 STANDARD OILi COMPANY OF TEXAS ENGTNEERING'1 DEPARTMENT i- SAN- FRANCISCO SPECIFICATION. NO. .E^2S9Ih MARCH.15, 1968 SECTION NO- 3 PAGE 3 3 = 063 Subject 'to Section 5y3 of the 'Terms`and Conditions CONTRACTOR shall (a! be responsible:for keeping all /material j and equipment - in good condition^ until the completed facility is accepted by COMPANY,l by 11) talcing any necessary steps isuch as painting,., greasing,/! installation of rust -preventive /oilier covering,; etc. , to . .protect . .all /.equipment" externally arid internally from./mechanical / damage or damage . . from the-:elements, and (2) protecting,-5all/instruments and control?panels from/corrosion, etc-,: duei/toj . . _ humidity, - precipitation, temperature /add atmosphprie < conditions or environment; (b) be held accountable ; for.surplus materials.furnished by /COMPANY, items receivedi. from. COMPANY and - td/fee returnedajid;/ for shortages or damages -to material =and equipment ? . - furnished by COMPANY- Where /necessary /CONTRACTOR shall / apply t cade colors for the/identification tof special ialloy . materials" when;//they are/reqeiveci*; -. to /ihsTire- that -these alloy materials1 are /properly installed -and that-correct :weld rod .is. used- . .. 364 : it; is ^contemplated that -the./items: of material /and equipment / to be s: furnished by COMPANY pursuabfchto ? - Paragraph 1 = 22/.: herein will be ..listed on ./appropriate bills; of material:/or drawings; in quantities-/. . . sufficient-to-do...the /work,, . CONTRACTOR, shall : j promptly check such..bills / of -materialor. drawings for. any errors which: would result/in shortages arid ' Shall,- promptly ..upcas-discovery j notify COMPANY in writing if -there 'are any such! errors or. if 'the / material -arid ;equipment"listed are insufficient /to meet . his anticipated.needs. /. Delays caused by CONTRACTOR0S failure to discover andvpromptly ; report such errors, or that the /material - and equipment listed are insufficient to meet his anticipated needs shall, not / constitute a basis- for reimbursement1 under Section / 3-2 of - the /Terms and < Conditions * or 'for extending-the completion date-/.: .. 3.065 Uponcompletion of/the job, CONTRACTOR shall furnish COMPANY an . inventory of all remaining material /and equipment .which were furnished by COMPANY / .including ihe^uantityi, description^ and the -irems-auafeer for each-item- When directed by COMPANY,. CONTRACTOR CHEVBB 0002687 . STANDARD OIL;COMPANY OF 'TEXAS` ENGINEERING i DEPARTMENT - SAN-FRANCISCO .. SPECIFICATIONlNO. E-2691 MARCH. 15, 1968 `. SECTION-NO o .3 : PAGE 4 shall; transport the remaining material .and egaipment^ ; to such locations on COMPANY'S-premises as designated by COMPANY. 3.07 ' DRAWINGS AND' DIMENSIONS 3i071 COMPANY will furnish to CONTRACTOR four copies of alls pertinent -standard .drawings^. standard . specifications ,, reference drawings,, and construction drawings. Two copiesof vendor's drawings willt be c furnished for all t equipmentthat ^COMPANY: supplies-.^ 3.072 CONTRACTOR shall receipt -for all :drawings - received and-except -for -one :COntract . set shall. return- all; drawings . to. COMPANY upon - completion of :< job - or: when superseded.by revised issues. : CONTRACTOR shall -. maintain at -all times- in his field.-.offlee a -complete . up?rto-date.,file :of -all s drawings ^furnished him. 1. . : 3^073 ^500: completion of-ccuisfcruction^ .CONTRACTOR sha?!? mark a print of each magdr drawing., to ~. indicate ?aiiy changes or deviations made : in the :actual: ...j . . . installation i ' However c minor construction - drawings - * ` such as structural r= details and small foundations need - not>-be :so.;marked................. i . 3.074 CONTRACTOR shall prepare :any detail sketches ormodels he may require. Detailbdrawings willyhotn be prepared by COMPANY, to 'Show:exact routing,, for example ,, of conduits between ^underground duct ^ banks and-stub-^ups.-in building .floor. ! ; 3.075 CONTRACTOR shall be responsible for verifying all dimensions of -and- for proper fitting: up of--tie- ins to. existing u facilities or facilities'to!? be. constructed by others as shown-on the design drawings^-furnished by COMPANY. CONTRACTOR shall submit any proposed change, or deviation from: | drawings to COMPANY for written approval-before fabrication^or. installation. .' CHEV BB !0002688 STANDARD OIL:COMPANY OP TEXAS ENGINEERING `DEPARTMENT - SAN' FRANCISCO' SPECIFICATION NOo MARCH: 15, 1968 SECTION NO 3 PAGE 5 E-2691: 3.08 ' INSPECTION*AND TESTING 3,0801 General 3 - 08Q2 CONTRACTOR shall-be;solely responsible :for thorough craft 'Inspection during^cbhstimction and; for the quality of the work. COMPANY will 'make :such .inspection as - COMPANY may. . desire;:in (order to -check, the:progress and quality.o f the:work, to see-that CONTRACTOR5S . employees are properly qualified -in itheirrespective crafts ,. that -workmanship is of an acceptable graded and that'.aitef .. requirementsof -fhis Specification are ; . being meti ' . Sucliinspection or ariy other inspection or testings'by COMPANY shall&iiot i relieve CONTRACTOR of-full responsibility for*, the .work;, hereunder,:. Welding Inspection... . .. . 3,08021 CONTRACTOR shall arrange .for welding', qualification tests. at 'his. expens e ;`in!=acCbrdanqe.!'iv?I:^j'. Engineering- . Instruction- EP?r310 , .. Welders shall: - be .required to-pass ^qualification tests before performing . any ..operation during ^construction .of ' the- projects COMPANY reserves the.:right-tt:require additional:qualification tests during construction if it' has any. doubt-about the :competence of welders, COMPANY: shall-:;-be.: allowed to witness tests and to examine test - couponso If ^additional tests are required arid; passed, by : welders, cost.'of < retestinglwill be borne, by COMPANY; 'if failed, cost -of retesting shall be rborne by CONTRACTOR., . 3d08022-COMPANY will-perform radiography of welds, as specifiedin-the piping standards, in *accordance: CHEVBB 0002689 .3^0803- STANDARD Oil. CCMPANYOFTEXAS' ENGINEERING DEPARTMENT - SAN - FRANCISCO SPECIFICATION;* NO. :E-2691i MARCH: 15 1968 SECTION: NOo . 3 PAGE 6 - with Section- 7. 0 of; < Specification No JEG-r2505 j tor verify that ythe. 3 . overall-quality of workmanship is in aceordance:with COMPANY standards (Specification NOo EG^Z5QW0S Welds so 1 inspected shall *be ^repaired cor . replaced by .CONTRACTOR at;Mis-en expense, if Athe .weld- fails to meet -. said standards of acceptability ,, All; Of-. COMPANY0* radioigfaipis^r-wiilVv be -available to 3CONTRACTOR' fqr> his; review, arid, use ..to ; the.-extent; the:; desires to;verify that-ail ; : requirements of Section 3;G801; above .are -met.' : Hydrostatic *Testing . (11 Equipment arid Piping - CONTRACTOR . shailperform hydrostatierdtests^ in ; accordance with. Engineering; InstfitctibnK Rtt300,, . on aH^ejjttipnieBit -andiin^sV after, erection* hutsibefore.ahY- , . insulation or backfill* arid;with all? fweldedscrewed or flanged-joints exposed, t Before .performing =ariy hydrostatic *test* CONTRACTOR. shall 5 notify COMPANY0 S Construction; Representative sufficiently., in - advance so that .all,;hydrostatie ttesta -may.- bewitnessed by COMPANY inspector, :!? CONTRACTOR shall: furnish all ^equipment needed for use :in hydrostatic (testing. (23 Drain. Dines - Each section of-drain line shall, be tested by CONTRACTOR before placement of any-area-paving; over the lines. , CHEVBB 0002690 STANDARD Olt COMPANY OF TEXAS ENGINEERINGSDEPARTMENT - SAN < FRANCISCO SPECIFICATION'-NO^ E426$l; MARCH: 15, 1968' SECTION' NO o' 3 PAGE 7 3-0804 3-0805 - 3-0806 Electrical1 Inspection1arid Testing : --------- CONTRACTOR shall; inspecfc'Wiring, cables,. motors, controllers,- and. lighting arid test ; grounding, all=in accordance:with Specification NoSo^EG-4894 ahd EG-1675^; Instrument! Testing CONTRACTOR shall inspect and-make all: necessary tests and such additional, tests as COMPANY may regriestito?insure:that< instruments are.installed correctly and ` will.;function-properly, in aceprdance with SpecificationINOo EG-?1586, except;thatr Cl) liny; pressure :gagesthat-are:damaged, ' shall - be returned- by CONTRACTOR to* COMPANY., COMPANY -will . repairtest arid. adjust such > pressure : gages arid. - release them to CONTRACTOR'with -ay-trig attached to : each gage;: identifying';the : gage arid showing that 'it `is in= ; satisfactory" conditim-iS. . ;. (2) All relief valves shall be :returned by CONTRACTOR to COMPANY- COMPANY will .check arid, if necessary,: adjust relief;valve ^settings arid release-the : valves to CONTRACTOR- with a .tag .j attached to. each valve.identifying the valve,- showing that ithis insatisfactory condition,- and rioting the set pressure- Columns, Vessels, and Furnace: , ; | CONTRACTOR shall prepare all pressure vessels,, columns, and the;furnace.for final inspection, including opening of all: internal . and external manways arid handholes* ' providing ^proper: gaskets-: for all., openings arid removal of * debris - When CONTRACTOR has proceeded with , his work to the .point; CHEV BB 0002691; 3*807 3 *-808 : STANDARD OIL COMPANY OF TEXAS' ENGINEERING; DEPARTMENT I- sk:=fRANg?Se? SPECIFICATION; NO. MARCH:15ff 1968: SECTION-NO. 3 PAGE.8 E-2691; where a coluan/ vessel; or the; :fnrnace is ready-for a .COMPANY check,:, he cshalkiadvise: COMPANY o : When COMPANY has- had. reasonable : opportunity to complete -.its, inspection -arid COMPANY S Construction - Representative! is: ' satisfied that'no .further action^ ie ^required before,firtal; heading.up of the :column,, vessel;; or the furnace; he will'give: CONTRACTOR written notice releasing:it .for final.heading:up........................ valve and Pump Packinqr: CONTRACTOR shall repacks in -the jfeld:;the shafts of all - pumps.- CONTRACTOR shall check all valves in-piping.classifications' M3, * Rl; S, Wl, W2,, and W3 to see.that sufficient^pacKihgr hasvbeenp ihstalied.v CONTRACTOR. also ?shall check at ^leaStSIO-^ of-each type of valve toirverify .that-'the . proper type :of packing-has beenlhstalled, . in the,-presence of -COMPANY inspectors-: Mechanical ? Equipment.....................j. . 3.08081 CONTRACTOR shall align -the:shafts of all drivers (motors,,, turbines) and -connected driven equipment ? (pumps and compressors)* ; CONTRACTOR shall.notify COMPANY"S Construction Representative sufficiently:., in advance prior to bolting up couplings so that COMPANY may inspect 'and approve alignments. CONTRACTOR shall be responsible for., equipment: alignment until correct alignment ; has been, demonstrated at operating temperature* Pumps,, drivers, gears,.etc*, mounted on baseplates or soleplates shall; be;:doweled to preserve alignment-while:operating and to restore alignment when equipment is removed for maintenance. CHEVBB 0002692 STANDARD OIL COMPANY OB TEXAS ; ' ENGINEERING f>DEPARTMENT ' - SAN' FRANCISCO : SPECIFICATION^NO? .E-42&9I; MARCH 15^ 1968 SECTION NO 3 PAGE 9 ' 3,,0809 308082 CONTRACTOR shall check rotation of motors, set turbine overspeed trips, turn over conqpressor, etc, in the presence of COMPANY inspector Concrete Samples COMPANY may-perform:compression and slump tests on concrete^ CONTRACTOR shall furnish samples taken: in'accordance with ASTM Specifications as may be requested-for the following:tests and.inspections? - (1) Compression Tests? One set'of * three cylinders from each 50 cud .yd. of structural*concrete :placed each day. ; (2) Slump Tests? Periodic;samples daily - during the pouring ,of concrete 3 09 ~EQUIPMENT LUBRICATION j COMPANY will furnish all lubricantsand CONTRACTOR , shall - lubricate all equipment .1 including icouplingsrin 'accordance - with the-lubrication schedule CONTRACTOR shall;notify COMPANY8 S Construction :Representative .sufficiently;.: in advance :so that all lubrication may be witnessed by|COMPANY, inspector , 31Q BOLTING-UP.PRACTICE i The holting-up of flan ?ed joints shall be in accordance- -with Engineering Practice R-800 i All bolts in piping classifications M3, N, . Nl^ , N2,,! Rl, Wl, W2, and W3 shall be lubricated with a high temperature .lubricant - approved by COMPANY - before assembly of joints In addition, the following-procedure shall be used for spiral-rwound gasketed: flanged joints? (1> A programmed bolting sequence of uniform:loads, . i-e,. start with the flange bolt in the :12 oaclock CHEV BB 0002693 ! STANDARD OIL COMPANY OF TEXAS ENGINEERING DEPARTMENT r- SAN FRANCISCO SPECIFICATION NO. E-2691' . MARCH 15, 1968 SECTION KOc 3- PAGE 10 . position,, then transfer successively to the 6 o'clock, 9 o4clock, 3 o'clock, etc., bolt positions,. increasing the. bolt, load uniformly each time the sequence is completed. 2) Tighten the bolts until the flanges are uniformly seated on the gasket centering ring. Lubrication with graphite paste.of-the gasketed surface .is required. COMPANY will provide, fo.r piping and vessel manhole covers, extra long bolts for future use with Biach bolt tensioner, for bolt sizes 1-1/2" diameter and larger. CONTRACTOR shall.install bolts so that full extra'length protrudes bn free side of. flange, and install:extra nut: to cover exposed threads. 3.11 ERECTION AND RIGGING.PLANS ... Rigging - CONTRACTOR shall submit`Rigging; Diagrams' for all "Heavy Lifts" including the main pipeway stanchions to.COMPANY Construction Representative for review at' least 3 weeks prior to performing the work, except-, that . .Rigging Diagrams for erection of the reactor shall be submitted 5 weeks prior to erection of the reactor. "Heavy Lifts" are defined as any lift involving.gin poles, guy derricks, multiple cranes, , or any arrangement1, other than a single crane lift within the operating .limitations of. the equipment used. The..Rigging .Diagram shall completely define the rigging plan and shall-= include such information as location layout? location of guys . and deadmen; details of connections at equipment, poles and deadmen; calculations of stresses in cables and safe . loads on all.rigging components, etc. CONTRACTOR may use the Reactor top nozzle for lifting pur poses. CONTRACTOR shall design and fabricate the lifting head? the distance between centerline of pin in lifting head and face of top nozzle shall not_exceed 12 inches. CONTRACTOR shall take special care to protect nozzle cladding and ring joint groove. . 3= 12 MANOFA.CTURSR S `DIRECTIONS Ail manufactured articles, materials and equipment shall be applied, installed, connected, erected, cleaned, conditioned, and tested in accordance with manufacturer's CHEV BB 0002694 STANDARD ' QH COMPANY OP TEXAS ENGINEERING DEPARTMENT5-v SAN^FSANGISCO SPECIFICATION <NOi: E-^26915 MARCH-15 *;; 1968 SECTION! NO o 3 PAGE 11 printed directions arid <specifications unless ^otherwise specified herein 3c 13 PID` CHECK CONTRACTOR shall make a complete ahddetailedphysieal: inspection torverify that i all;: completed! piping systems and. instrument -installations are.. in 'accordance with the - filial Piping and Instrument Diagrams* . Instrument Schedules* and instrument Installation Detail-si . CONTRACTOR shall: also-verify that all materials conform :to the .Piping , i Material. Classification. Sheets -and. Instrument;Drawings : Discrepancies discovered in ibhis . checlt shall ; be rcojcrected 4 by - CONTRACTOR except =that -any discrepancies^wherein ; piping-drawings do not=agree.with diagrams and schedules shiallibe referred to COMPANY for resolution,, 3^14 CORRECTION--OF, DEFECTS ................ ... . ... CONTRACTOR shall.perform;allc necessary repair work.tc: correct -all, defects. and any damage., caused thereby<,.C .When ; repair ; work; is .-necessary due to faulty, .workmanship! of : CONTRACTOR. or due to;defective or unsatisfactory, material r furnished, fay CONTRACTOR* the -cost;of -.such. repair.'; wOrk . shall . be borne by CONTRACTOR. in the.;manner provided; by Section 42 of -the Terms and conditionso .Where aOdtefect? is duei-to defective material furnished by COMPANY* jthe. = correction of the; defect and any damage .caused thereby shall: benperformed by CONTRACTOR and the rcontract -price shall be adjusted in accordance with the ."Exhibit -+ Change; in the Work" for such correction work- : 3 ,,15 - CBEANING OP |. . During the.course of the work* the CONTRACTOR shall;keep a reasonable .degree :of order , by- disposing of accumulated rubbish and waste, material rand*, at the -.completionfof `.the work* . the site. shall > be cleared of all debris*-, left-over materials* tools* and equipment ;which may: have;accumulated in. the execution. of ithe - work. All temporary shops * storehouses* offices* toilets* etc,,*, erected by CONTRACTOR shall. be removed.. Where the CONTRACTOR* after duei'noti'ce*. fails :to keep the area of-his work reasonably clean and . safe* or fails to clean this area at the completion of CHEVBB 0002695 STANDARD Oil* COMPANY OF TEXAS ENGINEERING IDEEARTMENT-;SAN -FRANCISCO0 ! SPECIFICATION?NOoi E-2691 MARCH 15, 1968 4 SECTION NOc 3 - PAGE .12 the work* the COMPANY may perform this' work arid' deduct! the cdstfrom thesums due or to become due the;CONTRACTOR <, 3ol6 COMPLETION Ther/workwiIl: be considered "complete" when CONTRACTOR hah* performed all'.work specifically stated or manifestly impliedrd-n this Specificetiono- . The /followings, illustrate the ;type :Of` work items'which must have, been satisfactorily accomplished before - the work:.will be ^considered complete s : 3.161. Completion -of. all-; required . tests.,: '! 3 i 162 Completion of all:required inspections including PSID checko : 3i 163- Pumps, machinery and drivers checked-for alignment -. after final tightening of cnnecting>ipiping,. > . bearings flushed and lubricated 3 164 Instruments,, alarms, and controls cleaned, . lubricated^ and-checked; : . 3i-165-Piping 'washed -o>r blown clean with :air All istrainers; : in place and cleanedo . | 3oI66 Electrical circuits tested*for grounds or shorts, motors checked for rotation ^andr run a minimuirof - two: .hours.. . All lights cleaned and operating,,' and all control circuits checked,, .j 3 167 Allsnameplates, identification stencils, etcjB. installedo 3.17 ACCEPTANCE 3 o-17-i -Custody of Plant for Initial Operation ! i When the Plant=is tested and completed in; accordance with the "requirements of ithis Specification.-^except' for finishing: work not: essential for the operation of-such Plant "which COMPANY and CONTRACTOR agree: - can.be completed-while the Plant is in the custody of COMPANY, such as painting,) -CONTRACTOR shall." CHFV BB 0002696 STANDARD:; OIL ; COMPANY OF TEXAS ENGINEERING ."DEPARTMENT SAN; FRANCISCO SPECIFICATIONSNOo MARCH:15,1968 SECTION:- NO i.3 PAGE. 13 E--2691 so notify COMPANY in' writing., i lifter receipt :of such notice, COMPANY stay then take custody of such * Plant-to. begin-initial operation to; verify that : the :Plant-conformswith requirements of-this Specificationo ' Such custody of -such Plant shall-: not be construed as Acceptance pursuant to -Paragraph ' 3 ol72 below*,.: Any additional work required to. be -performed by CONTRACTOR in-such Plant--after COMPANY ; has taken custody shall bexperformed on a work permit.'basis . 3172 Acceptance .i CONTRACTOR0S Jworks hereunder shall:be considered accepted on the:date COMPANY gives written notice to CONTRACTOR that -it-is satisfied all:work has been completed, in accordance with the ^requirements of .this Specification Acceptance^ by .COMPANY shall; in no -way relieve CONTRACTOR of* his obligation-or liabilities under the rCojatract^ THIS PAGE ENDS SECTION.- 3 ,, CHEVBB 0002697