CEI2 : THE CHEMICAL EXPOSURE INDEX CALCULATION SYSTEM
Reference: "Chemical Exposure Index Guide" - Second Edition, September-1993 Corporate Safety and Loss Prevention, The Dow Chemical Company
Plant or Project Name: CA2 Location: PLAQUEMINE
Plant Superintendent or Manager: GRETCHEN LEBLANC Site Review Representative: STEVE TEDESCHI
Prepared By: STEVE TEDESCHI Date Prepared: 10/26/94________
Reviewed By: BUCK BAILEY Date Reviewed: 10/31/94
I. CASE DATA Case Number Release Scenario
1 Liquid Release Pipe/Vessel/Hose
2 Liquid Release Pipe/Vessel/Hose
Chemical Name
Release Scenario Description
EMERGENCY RESPONSE PLANNING GUIDELINES (ERPG) VALUES Dow IHG (ppm) ACGIH TLV-TWA (ppm) STEL (ppm)
ERPG-1 (ppm) ERPG-2 (ppm) ERPG-3 (ppm)
PLANT DATA Total Quantity in Plant, (lb) Largest Single Containment, (lb) Pressure of Containment, (psig) DISTANCES TO (feet):
1. Public 2. Other in-company facility 3. Non-company plant or business
PHYSICAL PROPERTIES Operating Temperature of Liquid, Ts (0F) Molecular Weight, MW Normal Boiling Point of Liquid, Tb (F) Vapor Pressure at Ts, Pvap (psia) Liquid Density at Ts, Rho (Ib/ft3) Heat Capacity, Cp (Btu/lb/F) Heat of Vaporization, Hv (Btu/lb)
II, AIRBORNE QUANTITY ESTIMATION
Liquid System Inventory, (gal)
Chlorine
Chlorine
T-35 DEVELOPES 2" HOLE IN BOTTOM OF 1 AN*; 10
4" TRANSFER LINE (XS PIPESIZE) DEVELOPES 2" UIA. HOLE; NU
-
1 3 20
300000 250000
6
675 375 1310
-10.0 70.9 -29.3 20.892 95.89 0.216 120.96
-
1 3 20
300000 55000
170
675 375 1310
-10.0 70.9 -29.3 20.892 95.89 0.216 120.96
19500 Prii it Date: W/47/94
HO A 04654R CONFTDFNTT Al
1. FROM A RELIEF DEVICE or OTHER Input Release Rate (Ib/min)
2. FROM A GAS RELEASE Gauge Pressure, Pg (psig) Diameter of Hole, D (in)
3. FROM A LIQUID RELEASE (PIPE/VESSEL, HOSE) Process Pipe/Vessel? or Hose? Diameter of Hole, D (in) Gauge Pressure, Pg (psig) Height of Liquid Above Release Point, sh (ft) Diked area (ft2)
4. FROM A LIQUID OVERFLOW/SPILL Filling or Unloading Rate (gpm) Diked area (ft2)
CHEMICAL EXPOSURE INDEX
Release Scenario
Airborne Quantity, AQ (Ib/min)
CEI
Hazard Distance, HD-1 (feet) Hazard Distance, HD-2 (feet) Hazard Distance, HD-3 (feet) TcEI-2 System Ver-2.0 - 8/1/94]
Pipe/Vessel 2.00 6.2 9,5 1150
Pipe/Vessel 2.00 160.0 30.0 0
Liquid Release Pipe/Vessel/Hose
Liquid Release Pipe/Vessel/Hose
943.5 593
32800 19466
7539
1471.5 741
32800 24310
9415
DO A 04 6-cj4W CONFTOFNTTAi
Print Date: 10/27/94
CEI2 - INTERMEDIATE SUPPORTING CALCULATIONS Plant or Project Name CA2 Location PLAQUEMINE
Prepared By STEVE TEDESCHI Date Prepared 10/26/94
Case Number Release Scenario
1. RELIEF DEVICE or OTHER CALCS. Input Release Rate (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQr (Ib/min)
2. GAS RELEASE CALCS. Calculated Release Rate, (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQg (Ib/min)
3. LIQUID RELEASE CALCS. (PIPE/VESSEL, HOSE) Step 1: Liquid Flow Rate Released
Calculated Diameter to Use, Dcalc (in) Calculated Liquid Release Rate, Lcalc (Ib/min) Time to Deplete System Inventory, (min) Liquid Release Rate to Use, L (Ib/min) Step 2: Total Liquid Released Calculated Total Liquid Release, WTcalc (lb) System Inventory, Wlnvt (lb) Total Liquid Release, WT (lb) Step 3: Fraction Flashed Fraction Flashed, Fv Calculated Flash Rate, AQfcalc (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity by Flash to Use, AQf (Ib/min) Step 4: Liquid Pool Size Mass of Liquid Entering Pool, Wp (lb) Calculated Liquid Pool Area, Ap calc (ft2) Liquid Pool Area, Ap (ft2) Step 5: Evaporation from Pool Surface Molecular Weight, MW Characteristic Pool Temperature, T (F) Vapor Pressure at Ts, Pvap (psia) Vapor Pressure at T, Pvap (psia) Evaporation from Pool Surface, AQp (Ib/min) Step 6: Total Airborne Quantity Calculated Airborne Rate, AQIcalc (Ib/min)
1
Liquid Release Pipe/Vessel/Hose
2
Liquid Release Pipe/Vessel/Hose
-
,*
-
-
-
-
2.00 3716.4
67.3 3716.4
2.00 14087.1
0.5 1471.5
55746.1 249950.5 55746.1
211307.1 7357.5 7357.5
0.035 641.5 389.6 641.5
0.035 1471.5
5.0 1471.5
46123.6 14670 1150
6087.5 1936 1936
70.9 -29.3 20.892 14.700 302.0
70.9 -29.3 20.892 14.700 495.4
943.5
1471.5 Print Date: 10/27/94
DO A 046550 CONFTDFNTTAL
Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQI (Ib/min)
4. LIQUID OVERFLOW/SPILL CALCS. Step 1: Liquid Flow Rate Released
Calculated Liquid Release Rate, Lcalc (Ib/min) Time to Deplete System Inventory, (min) Liquid Release Rate to Use, L (Ib/min) Step 2: Total Liquid Released Calculated Total Liquid Release, WTcalc (lb) System Inventory, Wlnvt (lb) Total Liquid Release, WT (lb) Step 3: Fraction Flashed Fraction Flashed, Fv Calculated Flash Rate, AQfcalc (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity by Flash to Use, AQf (Ib/min) Step 4: Liquid Pool Size Mass of Liquid Entering Pool, Wp (lb) Calculated Liquid Pool Area, Ap calc (ft2) Liquid Pool Area, Ap (ft2) Step 5: Evaporation from Pool Surface Molecular Weight, MW Characteristic Pool Temperature, T (F) Vapor Pressure at Ts, Pvap (psia) Vapor Pressure at T, Pvap (psia) Evaporation from Pool Surface, AQp (Ib/min) Step 6: Total Airborne Quantity Calculated Airborne Rate, AQoscalc (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQos (Ib/min)
[CEI-2 System Ver-2.0 8/1/94]
264.9 943.5
*
-
-
-
-
-
5.0 1471.5
-
-
-
-
-
-
DC A 04^551
confident tai
Print Date: 10/27/94
CEI2 : THE CHEMICAL EXPOSURE INDEX CALCULATION
Reference: "Chemical Exposure Index Guide" - Second Edi Corporate Safety and Loss Prevention, The Dow Chemical
Work File Name CA294.XLS
Plant or Project Name: CA2 ____________ Location: PLAQUEMINE
Plant Superintendent or Manager: GRETCHEN LEBLAN Site Review Representative: STEVE TEDESCHI
I. CASE DATA Case Number Release Scenario
3 Relief Device
Chemical Name
Release Scenario Description
EMERGENCY RESPONSE PLANNING GUIDELINES (ERPG) VALUES Dow IHG (ppm) ACGIH TLV-TWA (ppm) STEL (ppm)
ERPG-1 (ppm) ERPG-2 (ppm) ERPG-3 (ppm)
PLANT DATA Total Quantity in Plant, (lb) Largest Single Containment, (lb) Pressure of Containment, (psig) DISTANCES TO (feet):
1. Public 2. Other in-company facility 3. Non-company plant or business
PHYSICAL PROPERTIES Operating Temperature of Liquid, Ts (F) Molecular Weight, MW Normal Boiling Point of Liquid, Tb (F) Vapor Pressure at Ts, Pvap (psia) Liquid Density at Ts, Rho (Ib/ft3) Heat Capacity, Cp (Btu/lb/F) Heat of Vaporization, Hv (Btu/lb)
II. AIRBORNE QUANTITY ESTIMATION
Liquid System Inventory, (gal)
Chlorine
C-201A DEVELOPES A DISCHARGE LINE _(T0") LtAK lb"
1 _3_ 20
300000 8500 67
675 375 1310
170.0 70.9 -29.3 358.263 76.47 0.256 85.51
DO A 04655? OONFTDFNTTAl
1000
Print Date: 10/27/94
1. FROM A RELIEF DEVICE or OTHER Input Release Rate (Ib/min)
2. FROM A GAS RELEASE Gauge Pressure, Pg (psig) Diameter of Hole, D (in)
3. FROM A LIQUID RELEASE (PIPE/VESSEL, HOSE) Process Pipe/Vessel? or Hose? Diameter of Hole, D (in) Gauge Pressure, Pg (psig) Height of Liquid Above Release Point, Jh (ft) Diked area (ft2)
4. FROM A LIQUID OVERFLOW/SPILL Filling or Unloading Rate (gpm) Diked area (ft2)
CHEMICAL EXPOSURE INDEX
Release Scenario
Airborne Quantity, AQ (Ib/min)
CEI
Hazard Distance, HD-1 (feet) Hazard Distance, HD-2 (feet) Hazard Distance, HD-3 (feet)
[CEI-2 System Ver-2.0 - 8/1/94]
1700.0
Relief Device 1700.0 797 32800 26129 10120
DO A 046S53 OONF T DFNT T Ai
Print Date: 10/27/94
CEI2 - INTERMEDIATE SUPPORTING CALCULATIONS Plant or Project Name: CA2 Location: PLAQUEMINE Prepared By: STEVE TEDESCHI Date Prepared: 10/26/94
Case Number Release Scenario
3 Relief Device
1. RELIEF DEVICE or OTHER CALCS. Input Release Rate (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQr (Ib/min)
2. GAS RELEASE CALCS. Calculated Release Rate, (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQg (Ib/min)
3. LIQUID RELEASE CALCS. (PIPE/VESSEL, HOSE) Step 1: Liquid Flow Rate Released
Calculated Diameter to Use, Dcalc (in) Calculated Liquid Release Rate, Lcalc (Ib/min) Time to Deplete System Inventory, (min) Liquid Release Rate to Use, L (Ib/min) Step 2: Total Liquid Released Calculated Total Liquid Release, WTcalc (lb) System Inventory, Wlnvt (lb) Total Liquid Release, WT (lb) Step 3: Fraction Flashed Fraction Flashed, Fv Calculated Flash Rate, AQfcalc (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity by Flash to Use, AQf (Ib/min) Step 4: Liquid Pool Size Mass of Liquid Entering Pool, Wp (lb) Calculated Liquid Pool Area, Ap calc (ft2) Liquid Pool Area, Ap (ft2) Step 5: Evaporation from Pool Surface Molecular Weight, MW Characteristic Pool Temperature, T (F) Vapor Pressure at Ts, Pvap (psia) Vapor Pressure at T, Pvap (psia) , Evaporation from Pool Surface, AQp (Ib/min) Step 6: Total Airborne Quantity Calculated Airborne Rate, AQIcalc (Ib/min)
1700.0 6.0
1700.0
-
-
-
-
-
-
-
-
-
-
-
-
00 A 046554 C.ONFTDFNTT AL
Print Date: 10/27/94
Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQI (Ib/min)
4. LIQUID OVERFLOW/SPILL CALCS. Step 1: Liquid Flow Rate Released
Calculated Liquid Release Rate, Lcalc (Ib/min) Time to Deplete System Inventory, (min) Liquid Release Rate to Use, L (Ib/min) Step 2: Total Liquid Released Calculated Total Liquid Release, WTcalc (lb) System Inventory, Wlnvt (lb) Total Liquid Release, WT (lb) Step 3: Fraction Flashed Fraction Flashed, Fv Calculated Flash Rate, AQfcalc (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity by Flash to Use, AQf (Ib/min) Step 4: Liquid Pool Size Mass of Liquid Entering Pool, Wp (lb) Calculated Liquid Pool Area, Ap calc (ft2) Liquid Pool Area, Ap (ft2) Step 5: Evaporation from Pool Surface Molecular Weight, MW Characteristic Pool Temperature, T (F) Vapor Pressure at Ts, Pvap (psia) Vapor Pressure at T, Pvap (psia) Evaporation from Pool Surface, AQp (Ib/min) Step 6: Total Airborne Quantity Calculated Airborne Rate, AQoscalc (Ib/min) Time to Deplete System Inventory, (min) Airborne Quantity for CEI, AQos (Ib/min)
[CEI-2 System Ver-2.0 - 8/1/94]
* -
-
-
-
-
-
-