Document O3b2MVR1dBEwKLLM37EDx1oR1
Monsanto
prom <name at location) R> M
Kountz (4-8151) General Offices------F4WA
DATE 5UBJECT REFERENCE
September CE^^2^S^-^CroctLpr Waste
Dusposajr, WGK sWi^feup Status Report No. 7
cc N. B. Wolk
TO Messrs: f Is. . Bergen
UTm. Depp
M. Dmytryszyn R. E. Howard F. P. LaBelle R. E. Lenz R. L. Miller
Accomplishments:
John Zink Co. completed relining the quench pot and scrubber. Operations resumed September 2, and the incinerator has been operating continuously since that time. Approximately 20,000 gal. of waste has been burned during this interval. Wastes leaving-' the__sy^tem--are-with-in-^specjL_ication as followsT"
Vapors from Stack Chlorine HCl Particulate
Performance 2 ppm 0.5 lb/hr 0.05 grains/
standard cubic foot
Specification 50 ppm 5 lb/hr negligible
Water to Sewer PCB' s
5 ppb
15 ppb
Problems:
Nothing significant. It is anticipated that the project will be closed out after completing final financial settlement with the John Zink Co.
Status:
The system is running well and it has largely been turned over to the operators.
This is the final report for this project unless something significant develops.
RMK/jc