Document O3GkrKp5MawJex5j8LrgGLMeL

Monsanto CROM A LOCATION) COMPANY CONFIDENTIAL C.F. Buckley - W.G. Krummrich Plant SUBJECT October 16, 1973 PCB Discharges TO : A.E. Leisy cc J.R. Savage - B2SL ' H.S. Bergen - B2SL W.B. Papageorge - BIND W.R. Richard - T3A P.B. Hodges - E1SF M.R. Foresman B.L. Caraway G.L. Bratsch G.A. Hippe . D.C. Otto P.E. Heisler W.C. Engman V. Brawley J.A. Munoz . This is in reference to Paul Hodges1 memo of 9/24/73 Paul Heisler's memo of 10/8/73* Jim Savage's memo of 10/11/73 and the monthly PCB control report. We will step up the PCB sampling program with the objective of determining what is required to reduce the PCB losses entering the Sauget WTP to less thqn 0.2 pounds per day. . The plan is: ' 1. Determine the amount leaving the WGK Plant in the 24" and 30" sewers. 2. Cross check the individual source losses by means of samples taken further downstream. 3. Balance these quantities with each other and the amounts entering the WTP. . '- 4. Make changes as needed in sample points and/or sample .... frequency to account for the Imbalance.- Details: . ' **'*.'- A. 3 more samplers will be installed at points 2A, IB, and"2B. B. All samplers will be the "Flip-Flop" type which sample intermittently at a velocity which is isokinetic with the flow In the sewer. These have been found by earlier studies to obtain samples most nearly'repre sentative of the stream. However, it Is recognized that phase separation and surface phenomena affect the sample and further improvement in sampling methods may be needed. C. The three additional samples will be composited over the same time period as the four samples presently .collected, that is the samples will represent the periods, of Oct. 16 thru 17, 18 thru 21, 22 thru 24, 25 thru 28, etc. DSW 310756 STLCOPCB4070742 Page 2 Memo to A.E. Leisy October 16, 1973 D. Grab samples will be taken from the North Sewer which should now be free of PCL. E. Findings thru Oct. 28 will be reviewed by Buckley, Munoz, Heisler, Engman and Leisy prior- to issuing the monthly report on 11/2/73. Further action will be outlined in this report. Reasons for the initial placement of 3 additional samplers: a. The sample taken at point 2A will represent the area surrounding the manufacturing departments before any other known source enters the sewer. The amount found should therefore equal that obtained at the department. b. The amount found at 2B will crosscheck the losses from the incinerator. c. The amount found at IB will include the amount passing 2B plus anything coming from the repair track. Any discrepancies in these results will indicate the next place to look. C.F. Buckley dm STLCOPCB4070743