Document O3668v4GmrYndBzO2k9YpZ5KQ

'I PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING April 19, 1978 Present: G. W. Bostick J. E. Clark G. A. Danner R. Reinhard (for Daues) W. C. Fuller J. A. Glass W. H. Lane . C. M. McCullough D. W. Metten G. T. Ryan J. G. Trafton W. H. Triplett I. REVIEW OF STATISTICS -- Glass TEXAS CITY SAFETY PERFORMANCE SUMMARY MARCH 1978 ________________ TOTAL INJURY CASES 1977 1978 MTD YTD MTD YTD 24 55 28 81 RECORDABLE CASES 1977 MTD YTD (a) INJURIES WITHOUT LOST WORKDAYS (Medical Treatment Only) 0 3 (b) LOST WORKDAYS CASES Restricted Activity **B2 Days Awayfrom Work Cases 1 1 0 2 1 1 (c) FATALITIES 00 1978 MTD YTD 26 13 12 01 00 * TOTAL RECORDABLE CASES 15 39 * A+B+C = Total Recordable Injuries ** B1 + B2 = (B) Total Lost Workday Cases INJURY RATE PER 200,000 MANHOURS 1977 MTD YTD 1378 MTD YTD FEB YTD 1978 MCIC TIR - TOTAL INJURY RATE RIR - RECORDABLE INJURY RATE TLWR - TOTAL LOST WORKDAY CASE RATE DAWR- DAYS AWAY FROM WORK CASE RATE 15.82 .66 .66 0 12.87 1.17 .47 .23 18.50 1.98 .66 0 18.79 2.09 .70 .23 2.72 1.26 .68 TLWR TARGET: 1 .45 Cl/2 CHEM. IND. AVG.) sc 14085 STG 2430930 LAM015874 'I PMSB Minutes - 4/19/78 \ SC 14086 Page 2 3. OLD BUSINESS (from Minutes of March 15, 1978 PMSB Meeting) II. Accident Analysis Weekly Bulletin--Glass The weekly bulletin is being sent to members of the Plant Manager's expanded staff each Friday. III. B. Guards For Smooth Rotating Shafts -- Ryan The committee has reviewed the information received from a number of sources and they plan to report at the next meeting of the Board. III. D. Railroad Lighting -- Danner Last month's meeting minutes incorrectly listed the Distribution Department being responsible for issuing the PAFE for additional lighting. Bill Riddick, who is responsible for the railroad tracks, will prepare the request for Engineering Services for the Appropriation Request. The Engineering estimate for the improved rail road lighting is being prepared in Engineering Services. IV. B. Enlarged Representation on Housekeeping Inspections -- Triplett Chairman ofc SHAC Committee, Bill Triplett, proposed the addition of a foreman or first line supervisor to the inspection teams making the quarterly guest housekeeping inspections. The proposal was approved by the Board and will be incorporated into the procedure used for the next inspection. IV. D. Hose Task Force Report Status -- Triplett The SHAC committee proposed approval of two types of fittings to be used on hose connections as an interim step prior to the issuing of a more detailed definitive procedure bulletin on all aspects of hoses used throughout the plant. The target date for the overall plant hose procedure bulletin was set for July 15, 1978. IV. E. 1) Basic Safety Rule Training Status The various members of the Board reviewed the status of their supervisory safety rule training. It is expected to be completed plantwide by the end of April. 2) Basic Safety Training for Foremen -- Glass The pilot course for foreman safety training has been completed. Comments have been received and revisions will be made before the next offering, tentatively scheduled for June 1978. STG 2430931 LAM015875 PMSB Minutes - 4/19/78 Page 3 IV. E. 3) Job Safety Audits/Job Hazard Analyses (Status) -- Glass The basic training program for the unit safety promotion teams on these two safety analytical concepts has been delayed due to STEP-SAF training. It is now planned for May 1978. IV. E. 4) Critical Reviews A plantwide system for scheduling critical reviews through the plant work order system is being prepared by Paul Bailey and Arnold Glass. A report to the Board is tentatively scheduled for the May 1978 meeting of the Plant Manager's Safety Board. V. A. Engineering Design Specification for Attachments to 650# Steam Systems -- Danner Threaded connections should not be used on 650# steam systems. Anyone making changes in revisions on steam system should check the Corporate Engineering Standard as recorded in Plant Engineering Services. SHAC was requested to put out a plant notice to remind everyone in the plant of this requirement: NOT TO HAVE THREADED CONNECTIONS ON 650# STEAM SYSTEM. V. Property Loss Incident Notification and Reporting -- Metten The new Property Loss P-Bulletin reporting procedure is now in effect. Anyone having problems in interpreting it should contact Arnold Glass or Doug Metten. If training on its use is required, training sessions will be scheduled. VI. Superhazardous Fluid P-Bulletin -- Trafton The final copy of the P-Bulletin on Superhazardous Fluids is being typed for distribution for comments. Target date for final approval is next meeting of PMSB. 4. REPORT OF SAFETY ADVISORY COMMITTEE (SAC) -- G. T. Ryan The committee studying problems related to the controlled use of ground fault indicators (GFI's) are nearing a conclusion of their study. They have had an expert in this field in the plant consult ing with them and they feel that they will have a proposal ready for review by the next PMSB meeting. 5. REPORT OF SAFETY HOUSEKEEPING AND ACTION COMMITTEE (SHAC) -- W. H. Triplett a. Emergency Procedure Plan A test of the Emergency Procedure Plan is being developed and will be on the agenda of the next meeting of the PMSB. Tenta tively, plans are to have a plantwide test in late May. SC 14087 STG 2430932 LAM015876 PMSB Minutes - 4/19/78 Page 4 b. Annual Housekeeping Program Six committees are being formed to handle the details of the annual housekeeping inspection. SHAC is developing proposed staffing of the committees and members of the Board will be. be contacted for appointees. The work of these committees will start in May 1978. c. Hourly Safety Committee Meeting The chairman of SHAC and an alternate and Tony Ozarchuk met with the Hourly Safety Committee, reviewed their concerns, are investigating the items presented and are expecting to resolve them in an orderly way. d. SHAC Activity Status Reports Contrary to the statement of last month's PMSB meeting minutes, the SHAC activity status report will be issued quarterly to PMSB members, instead of monthly. 6. The following incidents were reviewed for possible plantwide appli cation and prevention efforts. 3/11/78 Fire at; 35V1-1 Cycle Gas Pipe Flange -- Daues 3/13/78 Serious Contractor Incident 15R1 -- McCullough 3/14/78 Fire Started from Peipfitter's Torch in Power 2 at a Leak in Flange of the Natural Gas Line -- Fuller 3/28/78 Titanium Tetrachloride Spill in Dept. 35P -- Daues 4/2/78 Benzene Leaking to North Ditch -- McCullough 4/6/78 Minor Injury - Near Miss, Serious Accident in Dept. 51 -- McCullough 4/10/78 Contractor Injury Report - Edward Crook (Leak Repair Serviceman) -- McCullough vf 4/27/78 J. A. Glass SC 14088 STG 2430933 LAM015877