Document O34N8GXKBNJJOdRpxq3MxkwxM
LOUISIANA DIVISION
Astestos ffikiMMmg IRcpi3irM]iiils
February 1993
DO A 044031
CONFIDENTIAL
DO A 044032 CONFIDENTIAL
SECTION I n. m. IV. V. VI. vn.
A.
B.
c.
D. E.
F. G. H.
I.
TABLE OF CONTENTS
TITLE
Purpose
Health Effects
Training Program Requirements
Asbestos Awareness
Building Survey
Asbestos Maintenance Requirements
Asbestos Operations Requirements
Cell Service, Chlor-Alkali-II, Chlorine Plant Requirements
Preventing Emissions From Cell Service, Chlor-Alkali-II, Chlorine Plants
Reporting Requirements For Demolition And Renovation Projects
Preventing Asbestos Emissions
Gasket/Packing Handling, Storage And Removal
Small-Scale, Short-Duration Projects
Large-Scale, Long-Duration Projects
Equipment Removed For Repair, Storage Or Scrap
Motorized Equipment Clutch And Brake Repair
PAGE (S) 4 5 6 7-11 12 12 13-23 13
14
15-16
17
18-19 20-22 22
23
24
2 rP5?_J 44033 C0 nFTDE-ntial
DO A 044034 CONFIDENTIAL.
SECTION vm.
APPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E
APPENDIX F APPENDIX G APPENDIX H APPENDIX I
TABLE OF CONTENTS -CONTINUED**
TITLE
Packaging, Handling And Disposal Of AsbestosContaining Waste Material Definitions Visible Emission Monitoring Procedure Visible Emission Monitoring Record Air Cleaning Device Inspection Checklist Demolition And Renovation Operations Notification Form Asbestos Disposal Verification Form Public Health Organizations Bag/Container Warning Label Vehicle Loading/Unloading Warning Sign
PAGE
25-26 27-31 32 33-34 35
36-38 39-41 42 43 44
DO A 044035 CONFIDENTIAL
DO A 044036 CONFIDENTIAL
SECTION I PURPOSE This document defines safe handling procedures for asbestos materials used in Louisiana Division. The intent is to control personnel exposure to asbestos through training, maintenance programs, safe work procedures, proper use of protective equipment, and substitution of non-asbestos containing materials. Asbestos has been widely used as insulation, structural wall board, roofing material, certain types of plastic equipment, etc. Asbestos fibers are currently in use as a mechanical reinforcing matrix in insulation, roofing paper, certain piping systems, gaskets, brake linings, clutch plates, etc. Dow Engineering Specifications were revised in 1970 to exclude asbestos-containing insulation before the enactment of Federal regulations controlling the use and handling of asbestos. It is Dow's philosophy to eliminate all uses of asbestos where adequate substitutes can be found. The OSHA standards (1910.1001 and 1926.58) which became effective July 21, 1986 define the precautions, procedures and controls required for asbestos handling. These standards also define the allowable exposure levels and the manner of determining exposure levels. The National Emission Standard for Hazardous Air Pollutants (NESHAP) also established specific requirements for removal and disposal of asbestos-containing materials (ACM). In Louisiana, the state has assumed responsibility for administering the Federal Regulation (NESHAP) through the auspices of a set of requirements entitled Louisiana Emission Standard For Hazardous Air Pollutants (LESHAP). Violations of these regulations may result in a citation or fine or both. Dow is committed to meeting or exceeding these government regulations, and to protecting the health and well being of personnel.
4
DO A 044037 CONFIDENTIAL
SECTION II POTENTIAL HEALTH EFFECTS HEALTH & ENVIRONMENTAL SCIENCES T.I.M.E. SYSTEM
ASBESTOS
9/21/92
Latest Revision: 04/02/92
Synonyms: Amphibole
Appearance: fibrous solid in various colors.
Exposure Guidelines:
OSHA fibers >5 micron: OSHA PEL is 0.2 fibers/cc TWA; 1 fiber cc for 30-minute short-term exposure.
ACGIH TLV is 0.5 fibers amosite/cc, 0.2 fibers crocidolite/cc. 2 fibers chrysotile and other forms/cc; A1A.
OSHA General Industry Standard 29CFR 1910.1001. OSHA Construction Standard 29CFR 1926.58.
Potential Health Effects
This section includes possible adverse effects which could occur if this material is not handled in the recommended manner. These effects apply to stated material and may not apply to dilutions or formulations of that material.
EYE - Mechanical injury only.
SKIN - Mechanical injury only. - Skin absorption is unlikely due to physical properties. Asbestos fibers may penetrate skin and form wart-like lesions or "corns".
INGESTION SINGLE dose oral LD50 has not been determined. -Small amounts swallowed incidental to normal handling operations are not likely to cause injury; swallowing amounts larger than that may cause injury.
ACUTE INHALATION EFFECTS - Excessive exposure to dust causes chronic inflammations of lung tissue and pleural membranes, as well as cancers, in both man and animals.
SUBCHRONIC EFFECTS - Prolonged exposure to asbestos dust has been found to cause pulmonary fibrosis (asbestosis), which may be disabling and even fatal,
CHRONIC EFFECTS/CARCINOGENICITY - Has been shown to cause cancer in humans. For hazard communication purposes under OSHA Standard CFR Pan 1910.1200, this chemical is listed as a carcinogen by NTP and IARC.
TERATOGENIC EFFECTS - Binh defects are unlikely. Exposures having no adverse effects on the mother should have no effect on the fetus.
REPRODUCTIVE EFFECTS - In animal studies, has been shown not to interfere with reproduction.
MUTAGENICITY -Some forms of asbestos have been reponed to induce chromosomal changes in tissue cultureand/or fruit flies.
5
'^TTAi
SECTION III ASBESTOS TRAINING PROGRAM REQUIREMENTS
Employees who handle asbestos must be trained before initial assignment and annually thereafter. The asbestos standards and regulations, and other training materials are available to employees upon request, from Industrial Hygiene. Information must be presented in a manner the employee can understand.
The following items must be included in the training program: 1. The health effects associated with asbestos. 2. The relationship between smoking and exposure to asbestos in producing lung cancer. 3. Methods of recognizing asbestos. 4. The quantity, location, manner of use, release, and storage of asbestos and the specific nature
of operations which could result in exposure to asbestos. 5. The engineering controls and work practices associated with the employee's job assignment. 6. The specific procedures implemented to protect employees from exposure to asbestos, such
as appropriate work practices, emergency and clean-up procedures, and personal protective equipment to be used. 7. The purpose, proper use, and limitations of respirators and protective clothing. 8. The purpose and a description of the medical surveillance program required by this standard. 9 A review of the OSHA standard, including appendices. 10. The names, addresses and phone numbers of public health organizations which provide information, materials and/or conduct programs concerning smoking cessation (see Appendix G). 11. The requirements for posting signs and affixing labels, and the meaning of the required legends for such signs and labels.
DO A 044039 CONFIDENTIAL
SECTION IV ASBESTOS AWARENESS
smmnBCTi asbestos <o*s an <dn*ts
This section is provided as general guidance when working with or near ACM.
1. Get positive identification. Sample and have bulk I.D. analysis performed at Industrial Hygiene. 2. Take sufficient samples. Some vessels, equipment, etc. may contain more than one type of
insulation. Asbestos materials may be covered by refractory, siding, or insulation. 3. Consult the appropriate section of this document if asbestos is present. Materials containing more
than 1% as determined by Polarized Light Microscopy (PLM) are considered ACM. 4. Put all asbestos waste (old insulation, transite, mastic, dust collector solids, disposable clothing,
gaskets, packing, shingles, Haveg piping or equipment, furnace refractories, pump packing, pipe gaskets, brake shoes, etc.) in approved containers for disposal. The containers must be properly labeled to warn of the asbestos hazard and sent to the proper Division landfill. 5. Inform all personnel in the general area that asbestos work is in progress.
HMD NOT
1. Use materials containing asbestos (l.e. insulation, fireproofing, transite siding, Haveg piping or equipment, weatherproofing, and cooling tower materials) where an adequate alternate exists. MAJOR MANAGER APPROVAL IS REQUIRED when using asbestos materials for matching replacement/ repair of existing asbestos covered structures or equipment if a suitable alternate is known.
2. Use asbestos labeled bags for disposal of general trash because of landfill permit requirements. 3. Sandblast or hydroblast materials containing asbestos. When sandblasting or hydroblasting adjacent
areas, protect the asbestos materials from overblast. Examples of items to be protected are transite walls, pipe insulation, fireproofing, etc. 4. Use compressed air to remove asbestos materials. For example, do not clean brake drums and clutch housings with compressed air. This procedure may fill the surrounding atmosphere with asbestos fibers. An acceptable method is to use an approved vacuum. Dispose of the debris in approved containers and send to the LAD landfill.
Do 4 7 CONFXD 44040
ASBESTOS AWARENESS M2) NDT (continued)
5. Eat, drink, smoke, chew gum/tobacco products, or apply cosmetics in a regulated or a decontamination area.
6. Dry sweep asbestos materials. 7. Spray asbestos-containing materials. 8. Use hand-operated or power-operated tools (such as but not limited to saws, scorers, abrasive wheels
and drills) without local exhaust ventilation if the use of these tools would cause asbestos exposures to personnel in excess of 0.2 fiber/cc. 8 hr. TWA, or 1 fiber/cc short-term excursion limit. 9. Hang plants or pictures on structures covered with asbestos-containing materials. 10. Sand asbestos-containing floor tiles. 11. Damage asbestos-containing materials while moving furniture or other objects. 12. Install curtains, drapes, or dividers in such a way that they damage asbestos-containing materials. 13. Dust floors, ceilings, moldings or other surfaces in asbestos-contaminated environments with a dry brush. 14. Use an ordinary vacuum to clean up asbestos-containing debris. 15. Remove ceiling tiles below asbestos-containing materials without wearing the proper respiratory protection, clearing the area of other people and observing asbestos removal waste disposal procedures. 16. Remove contaminated ventilation system filters without wetting. Do not shake.
NOTE: Item 5 through 16 are directly from the OSHA Asbestos Regulations.
DO A 044041 CONFIDENTIAL
SECTION IV
ASBESTOS-CONTAINING MATERIALS
GENERIC SUBDIVISION -NAME
ASBESTOS DATES (%) OF USE
BINDER/ SIZING
Surfacing material
Preformed thermal products
sprayed-or troweled-on
bans, blocks, and pipe covering
1-95
1935-1970
sodium silicate, Portland cement, organic binders.
Textiles
Cementitious concrete-like
Paper products
85% magnesia
15
calcium silicate
6
cloth
blankets (fire) 100
felts:
9(
blue stripe
81
red stripe
90
green stripe
95
sheets
50-95
cord/rope/yam
80-100
tubing
80-85
tape/strip
90
curtains (theater,
welding)
60-65
extrusion panels:
8
corrugated
20-45
flat 40-50
flexible
30-50
flexible perforated 30-50
laminated
35-50
(outer surface)
roof tiles
20-30
clapboard and shingles:
clapboard
12-15
siding shingles
12-14
roofing shingles
20-30
pipe 20-15
corrugated:
high temperature
90
moderate temp.
35-70
indented
98
millboard
80-85
1926-1949
1949-1971
1910-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present 1920-present
1945-present 1965-1977 1930-present 1930-present 1930-present 1930-present 1930-present
1930-present
1944-1945 unknown-present unknown-present 1935-present
1935-present 1910-present 1935-present
1925-present
magnesium carbonate calcium silicate
none cotton/wool cotton cotton cotton cotton cotton/wool cotton/wool cotton/wool
cotton Portland cement Portland cement Portland cement Portland cement Portland cement Portland cement
Portland cement
Portland cement Portland cement Portland cement Portland cement
sodium silicate starch cotton and organic binder starch, lime, clay
DO A 04404? CONFIDENTIAL
SECTION IV (Continued)
ASBESTOS-CONTAINING MATERIALS
GENERIC SUBDIVISION NAME
ASBESTOS DATES (%) OF USE
BINDER/ SIZING
Roofing felts
Asbestoscontaining compounds
smooth surface mineral surface shingles pipeline
caulking putties adhesive (cold applied) joint compound roofing asphalt mastics asphalt tile cement roof putty plaster/stucco spackles
sealants fire/water
cement, insulation cement, finishing cement, magnesia
Asbestos ebony products
10-15 10-15 1 10
30 5-25
5 5-25 13-25 10-25 2-10 3-5
50-55
20-100 55 15
50
1910-present 1910-present 1971-1974 1920-present
1930-present 1945-present
1945-1975 unknown-present 1920-present 1959-present unknown-present unknown-present 1930-1975
1935-present
1900-1973 1920-1973 1926-1950
1930-present
asphalt asphalt asphalt asphalt
linseed oil asphalt
asphalt asphalt asphalt asphalt asphalt Portland cement starch, casein, synthetic resins
caster oil or poly-isobutylene clay clay magnesium carbonate
Portland cement
Flooring tile and sheet goods
vinyl asbestos tile asphalt/asbestos tile resilient
21
26-33 30
1950-present
1920-present 1950-present
poly (vinyl) chloride
asphalt dry oils
Wall covering
vinyl wallpaper
6-8
unknown-present
-
Paints and coatings
roof coating air tight
4-7 15
1900-present 1940-present
asphalt asphalt
10 00 A O4404o
C0^TDENTlAi
SECTION IV ASBESTOS AWARENESS REQUIREMENTS FLOW-DIAGRAM
PLANT OR BUILDING
OWNER RESPONSIBILITY 1
1
INSPECT ALL AREAS
1
1
SAMPLE
SUSPECT MATERIALS
AND BRING TO
INDUSTRIAL HYGIENE
1
1 CONTAINS ASBESTOS (>0.1%)
1 1 DOCUMENT RESULTS AND RETAIN RECORDS 1 1 TRAIN PERSONNEL ON ASBESTOS (SECTION HI)
1
1 NO ASBESTOS (<0.1%)
I 1 DOCUMENT RESULTS AND RETAIN RECORDS 1 1
NO FURTHER ACTION REQUIRED
1
1
ANNUALLY INSPECT AND DOCUMENT FOR
MATERIAL CONDITION
AND VISUAL FIBER RELEASE
1
11
MATERIAL IN POOR
MATERIAL IN GOOD
CONDITION OR VISUAL
CONDITION, NO FIBER
FIBER RELEASE
RELEASE
11
11
1 DOCUMENT, LABEL AND
1 SET UP MAINTENANCE
1 PROGRAM (SECTION VII)
1 1
1 EVALUATE AND DECIDE FOR REMOVAL AND/OR REPAIR
1 1 CONTACT MAINTENANCE (8913, 6443)
11 DO A 044044
CONFIDENTIAL
SECTION V
BUILDING SURVEY
The Industrial Hygiene Department conducts surveys of buildings in this Division to assist in determining and documenting where asbestos is located. We are not required to remove the asbestos; however, the Labeling, Handling, and Maintenance Requirements of the regulations must be followed (See Section VI).
We are allowed to place signs at the entrance to each facility identifying the general presence of asbestos. This, of course, is when used in conjunction with an education and training course which includes written programs for the overall awareness of employees and people who might work in areas where asbestos is located. Signs are available from Division Stock.
Regulation requirements for asbestos removal from buildings is extremely extensive and expensive and therefore, will need to be handled on an individual basis utilizing the Industrial Hygiene Department,
SECTION VI
MINIMUM REQUIREMENTS FOR MAINTAINING ASBESTOS Although the removal of asbestos-containing material (ACM) is not currently required, all facilities having ACM present must conduct an asbestos maintenance program.
The minimum requirements of this program are:
1. An initial inspection of buildings (Responsibility of Industrial Hygiene) and process areas (Responsibility of Facility) to determine the presence or absence of asbestos containing materials.
2. Development of an inventory of all asbestos-containing materials in the facility. The inventory may be a blueprint, diagram or written description which identifies the location and approximate amount of asbestos. Records shall be maintained until the asbestos-containing materials are removed (Responsibility of Facility).
3. Maintenance of all labeling of asbestos-containing materials in the facility (Responsibility of Facility).
4. Prompt clean up of any asbestos contamination.
5. Inspection of all asbestos-containing materials annually to detect deterioration. If deterioration is found, corrective action must be taken and noted on the "Annual Inspection" record (Responsibility of Facility).
6. Written procedures for handling asbestos materials during the performance of maintenance, demolition and renovation activities (Responsibility of Facility).
7. Training of block personnel who may be required to handle asbestos-containing materials as outlined in the Training Section III of this document (Responsibility of Personnel Supervision).
8. Documentation of compliance with this program (Responsibility of Facility and/or Personnel Supervision).
12 Do A
COMp
SECTION VII ASBESTOS OPERATIONS REQUIREMENTS INTRODUCTION: The National Emission Standard for Hazardous Air Pollutants (NESHAP) established specific requirements for manufacturing, demolition and renovation, and waste disposal of ACM. The Louisiana Department of Environmental Quality has assumed responsibility for administering the NESHAP Standard Program. A, Requirements For Manufacturers- the following requirements apply to manufacturing operations using commercial asbestos (Cell Service, Chlorine and Chlor-Alkali II Plants). 1. No visible emissions may be discharged to outside air from these operations or from any building or structure in which they are conducted or from any other fugitive sources. 2. Specific methods listed in Section VII. paragraph B must be used to clean emission from these operations containing particulate asbestos material before they escape to, or are vented to, the outside air. 3. Monitor each potential source of asbestos emission from any part of the manufacturing facility, including air cleaning devices, process equipment, and buildings housing material processing and handling equipment, at least once each dav during daylight hours for visible emissions to the air during periods of operation (Cell Service Only). See Appendix B for the procedure for Visible Emission Monitoring. 4. Inspect each air cleaning device at least once each week for proper operation, potential for malfunctions, the presence of tears, holes, and abrasions in filter bags, and dust deposits on clean side of bags (Cell Service Only). See Appendix D for a copy of the Air Cleaning Device Inspection Checklist. 5. For air cleaning devices that cannot be inspected on a weekly basis, a written maintenance plan must be submitted to the administrator. 6. Retain a copy of all monitoring and inspection records for at least 2 years. 7. Submit quarterly a copy of the visible emission inspection records to the administrator, if visible emissions occurred during the report period. See Appendix C for a copy of the Record of Visible Emission Monitoring. Quarterly reports must be post marked by the 30th day following the end of the calendar quarter.
13
SECTION VII Prevention Of Asbestos Air Emissions From Manufacturing Operations the following requirements apply to manufacturing operations using commercial asbestos (Cell Service Only). 1. The following methods must be used to clean emissions from operations containing particulate
asbestos material before it escapes to, or is vented to, the outside air: a. Use fabric filter collection devices. b. Operate the fabric filter collection devices at a pressure drop of no more than 4 inches water gauge as measured across the filter fabric. c. Ensure air flow permeability does not exceed 30 ft3 min/ft2 for woven fabrics or 35 ft3/min/ft2 for felted fabrics. d. Ensure that felted fabric weighs at least 14 ounces per square yard and is at least onesixteenth inch thick. e. Avoid using synthetic fabrics that contain fill yard other than that which is spun.
2. Properly install, use, operate and maintain air cleaning equipment. Bypass devices may be used only during upset or emergency conditions, and then only for so long as it takes to shut down the operation generating the paniculate asbestos material.
3. For fabric filter collection devices installed after January 16,1989 provide for easy inspection for faulty bags.
4. If the use of fabric creates a fire or explosion hazard, or the administrative authority determines that a fabric filter is not feasible, the administrator may authorize as a substitute:. a. The use of wet collectors designed to operate at least at 40 inches water gage. b. The use of a HEPA filter that is certified to be at least 99.97 percent efficient for 0.3 micron particles. c. The administrator may authorize the use of other filtering equipment if the owner or operator demonstrates that it is equivalent in filtering particulate asbestos material.
14
DO A 044047 CONFIDENTIAL
SECTION VII
Reporting Renuirements For Demolition And Renovation Qperations-the following reporting requirements apply to demolition and renovation projects involving the presence of asbestoscontaining material.
1. Inspect the affected facility or part of the facility where the demolition or renovation activity will occur for the presence of asbestos, including Category I nonfriable and Category II nonfriable asbestos-containing materials prior to the start of work.
2. Provide a typed copy of Notification of Demolition and Renovation Form (Appendix E) to the administrative authority 10 working days prior to commencement of demolition and/or renovation work (commencement is considered to be the start of any activity that would break up, dislodge, or similarly disturb asbestos material).
3. Provide telephone notification of emergencies to the Louisiana Division Asbestos Manager (xl817 or 769*4462) who will notify the DEQ Regional Office, or the DEQ Emergency Hotline after working hours and weekends. DEQ Notification MUST occur immediately which is NO later than one hour after learning of the incident that induces emergency demolition or renovation operations. The notification by phone shall include:
a. The reason for the emergency
b. The steps taken to minimize the hazards to workers and the public
c. The estimated quantities of friable and nonfriable ACM to be handled.
Within 5 working days after notification by phone, a typed copy of Notification of Demolition and Renovation Form (Appendix E) must be submitted to the DEQ.
4. Provide an update of written notice, as necessary, including when the amount of asbestos affected changes by at least 20 percent.
5. Forward completed copy of notification form to Industrial Hygiene. Industrial Hygiene will finish processing the form, and then convey it to the DEQ.
6. For all demolition or renovation work, except nonscheduled operations (such as routine, non predictable maintenance involving less than one cubic yard) covered by the Division yearly blanket Asbestos Disposal Verification Form (ADVF), or emergency type renovations, the administrative authority must be renotified if either of the following situations
a. Start date will be later than that contained in the original notification; re notification must be made by telephone as soon as possible before the original start date. Written notification of the new start date must be made as soon as possible before, and no later than the original start date, or
b. Start date will be before that contained in the original notification; written re notification must be provided at least 10 working days before the new start date.
15 DO A 044048
CONFIDENTIAL
SECTION VII
7. Demolition or renovation operations covered by Paragraph (61 must not begin on a date other than the date contained in the written notice of the new start date.
8. For Demolitions where regulated asbestos-containing material (RACM) is present as Category I nonfriable material in good condition, or if RACM is not present, a typed copy of Notification of Demolition and Renovation Form (Appendix E) must be submitted to the DEQ at least 10 working days prior to beginning work.
9. Receipt and approval of the notification form by the DEQ will result in the issuance of an ADVF.
10. Within 24 hours after the Demolition or Renovation activity has ended and the work area has been cleaned, the LAD Asbestos Manager must be notified so that verbal notification of the completion of the project may be made to the DEQ Regional Office. The abatement activity will be considered complete only after the DEQ has been notified. Work area cleanup involves: a. Removing all loose debris in and adjacent to the immediate work area, and b. Encapsulating all remaining RACM in the immediate work area.
11. Sections of the ADVF must be filled out by the owner/generator (project/job designated individual), the waste material transporter, and the landfill operator who upon completing that section must return the original copy to the DEQ and a copy to the owner/generator.
12. ADVFs must be retained, including the copy of the shipment record signed by Environmental Operations, for at least two years.
13. Demolition or renovation contracts awarded by the Louisiana Division shall contain the requirement for notifying the State DEQ where asbestos-containing material is involved.
16
DO A 044049 CONFIDENTIAL
SECTION VII
Procedure For Preventing Asbestos Emissions- the following procedures must be used to prevent emissions of particulate asbestos material to the air.
1. Regulated asbestos-containing material (RACM) must be removed prior to beginning any demolition or renovation activity that would break up. dislodge, or similarly disturb the material or preclude access to the material for subsequent removal. Regulated asbestos-containing material (RACM) includes the following: a. Friable asbestos material; and b. Category I nonfriable ACM (asbestos-containing gaskets, packing, resilient floor coverings, asphalt roofing coverings); and c. Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; and d. Category II nonfriable ACM any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos that, when dry cannot be crumbled, pulverized, or reduced to powder by hand pressure)
2. Friable asbestos materials to be stripped or removed from any facility must be adequately wetted prior to stripping or removing.
3. Facility components covered or coated with friable asbestos materials may be taken out as units or as sections, provided the friable asbestos materials exposed during cutting or disjointing are adequately wetted.
4. Units or sections must be carefully lowered to the floor and/or ground level, not dropping, throwing, sliding, or otherwise damaging or disturbing the RACM.
5. All friable asbestos materials that have been removed or stripped must be adequately wetted to ensure they remain wet during all remaining stages of demolition or renovation and related handling operations.
6. L< il exhaust ventilation and collection systems may be used, instead of wetting, to prevent pi. culate asbestos emissions when wet removal would result in damage to equipment during renovation operations.
7. Prior written approval must be received before deviating from wet removal methods by use of any of the following emission control methods:
a. A local exhaust ventilation and collection system designed and operated to capture the particulate asbestos material.
b. A glove-bag system designed and operated to contain the paniculate asbestos material produced by the stripping and removal of material.
c. Leak-tight wrapping to contain all RACM prior to being dismantled.
DO A 044050 CONFIDENTIAL
SECTION VII
Asbestos Gasket and Packing Material Storage. Handling. And Removal.
1. STORAGE/HANDLING:
a. Preformed gaskets, sheet gasket material, and packing must be stored in a designated, clean, labeled area separate from non-asbestos containing material.
b. The storage area must be regularly cleaned with a HEPA filtered vacuum (as often as necessary) to prevent the accumulation of asbestos-containing dust and debris.
c. ACMs should be stored in low traffic areas and not in an area where personnel are normally located.
d. During storage and handling activities, gaskets and packing must be treated with care to minimize the potential for releasing fibers to the air.
e. When possible, it is recommended that gaskets, sheet gasket material, and packing be stored in labeled plastic bags or packaged in protective envelopes.
2. GASKET CUTTING:
a. The gasket fabrication area must be identified and labeled as an Asbestos Handling Area.
b. Sharp edged scissors or knives are the preferred tools for use in fabricating asbestos sheet gaskets. If a powered mechanical cutting device is used, the safety and protective equipment requirements of Small-scale, short duration projects (Section VII- Part F) must be followed, including the use of local exhaust ventilation equipped with a HEPA filter dust collection system.
c. Asbestos material, debris, or dust must not be allowed to accumulate on the sheet cutting surface (work area table),
d. The work area must be cleaned periodically with a HEPA filter equipped vacuum cleaner (may involve abatement personnel) to prevent the accumulation of dust and loose material.
e. Dispose of scrap material or any other items that may be contaminated in a properly labeled asbestos disposal bag.
3. SAFETY/PERSONAL PROTECTIVE EQUIPMENT:
a. Work permits and personal protective equipment appropriate for the job and its location must be obtained prior to removing gaskets and/or packing.
b. Minimum personal safety equipment required for the removal of a gasket or packing material will be the same as the job location requirements as long as the removal is performed so that material does not become friable (i.e. wet removal, removal by hand, or no sanding, cutting, grinding, or abrading).
c. Gasket or packing material in poor condition, friable, or which will be subjected to mechanical removal techniques (such as sanding, grinding, abrading, drilling, cutting, chipping) must be handled by certified asbestos abatement personnel.
d. Professional, licensed asbestos abatement contractor personnel that work with ACM on a daily basis follow additional and more stringent safety requirements.
18
Do a confTd f^4sa
SECTION VII 4. MONITORING:
Periodic personnel monitoring must be conducted during gasket or packing removal work to substantiate that the level of emissions are below the PEL (0.2 fiber/cc) and/or STEL (1 f/cc), and to maintain a current data base for the Division. Consult Industrial Hygiene for monitoring information for the job in question.
5. REMOVAL PROCEDURES: a. The removal of nonfriable preformed gaskets and packings can be performed by trained block personnel including maintenance workers, or by an asbestos abatement contractor depending on Plant/Block preference. b. All gaskets and packings must be wetted down before, during, and after removal handling operations to prevent the release of airborne fibers. c. The water used for wetting must contain a surfactant to improve it's ability to penetrate the material. Fantastik, a liquid spray cleaner, is widely accepted as the wetting agent of choice for ACM. Care should be taken not to apply an excessive amount of spray which could cause the material to crumble and/or become mushy. d. A gasket or packing material that requires the use of sanding, grinding, or abrading (including drilling, cutting, or chipping) must be handled by certified asbestos abatement personnel. e. The use of powered mechanical tools that will cause damage to the nonfriable ACM must be equipped to eliminate or minimize the potential for fiber release. A powered buffer equipped with a local exhaust and ventilation collection system is available from the Division Tool Room. f. Waste gasket and packing material must be disposed of in the plant by placing it in labeled plastic bags. g. Waste material must be properly labeled and packaged for acceptance at the landfill for disposal. See Appendix H for Labeling Specifications, and Section Vm for the requirements for Handling and Packaging for Disposal.
DO A 044052 CONFIDENTIAL
Addendum to the Louisiana Division Asbestos Handling Guidelines
Modification to Asbestos Gasket Removal Procedures
As part of the Division's effort to reduce expenses, attention has been given to the cost of removing asbestos gaskets. These procedures have evolved over the years and it was in 1991 when Dow and "Nestor" contractor maintenance groups asked Industrial Hygiene to work with them to develop a simpler procedure. They felt that many of the procedural requirements under the regulations were too complicated They wanted a fool proof means of minimizing the potential of asbestos exposure.
We all agreed in principle that if a gasket could be removed intact, then there would be no asbestos friability issue. Furthermore, if the gasket was bonded to the flange face and could only be removed by tearing, then the Petrin asbestos contractor would be called to finish the job. This then became the accepted practice.
A review of 1992 costs showed that -$60,000 was spent having Petrin remove those bonded gaskets. However, a great majority of the work involved using a simple hand tool (such as a putty knife scrapper), keeping the surface wet, and capturing all of the gasket pieces and any wetting agent run off. Based on these removal practices, we have an opportunity to significantly reduce the above cost by doing a great deal of the gasket removal work ourselves.
Historical exposure monitoring data shows very low fiber counts for gasket removal work (we are currently gathering additional and specific data points), and talking with others (both inside and outside of Dow) would suggest that plant operations and maintenance personnel should be able to do most gasket removal without creating airborne fibers using the above procedure. Therefore, this would require no special training or special personal protective equipment The key is a careful awareness to keep gaskets wet and containing all gasket pieces and run-off for proper disposal It is predicted that this procedure should cover > 90% of the gasket removal in the Division.
However, there is a judgment factor that enters into this scenario. That is, if the gasket is so tightly bonded that it will not come off without using aggressive techniques (such as sanding, grinding, abrading, cutting, chipping) or that a gasket, because of the type of service, is highly friable at the breaking of the flange, that these removals would require asbestos trained personnel This could be either in-block or Petrin contractors wearing proper PPE (such as half face respirator with HEPA filters and disposable clothing) and using prescribed removal techniques.
The attached procedure outlines the requirements for removing nonfriable gaskets.
4/93
Page 19 A
DO A 044053 CONFIDENTIAL
Addendum to the Louisiana Division Asbestos Handling Guidelines
Nonfriable Asbestos Gasket Removal Procedure
1, Safety/Personal Protective Equipment a. Train (HAZCOM information) individuals involved in removing nonfriable gaskets initially and annually thereafter on hazards of material (MSDS/CETA). b. Issue work permit for the job listing minimum PPE required. Minimum PPE for nonfriable asbestos gasket removal will be the same as the job location requirements.
2. Removal a. Spray the gasket surface with the wetting agent (Fantastik or approved substitute) before removal. b. Lift the gasket out, or if necessary insert the blade of a scrapper (putty knife) to free up the gasket. c. Utilize some means (e.g. plastic bag, visqueen) to catch any pieces of gasket material produced during removal, and any wetting agent run off. d. Dispose of the waste gasket and other associated debris in a labeled plastic bag. Apply a few squirts of the wetting agent to the material and die inside surface of the bag before closing. e. Division implementation of this procedure should capture 90 - 95% of the gasket removal work. f. Gaskets that are friable because of the service they are in, or their removal requires the use of aggressive techniques would require the involvement of asbestos trained personnel. Friable gasket removal can be handled by either in-block or Petrin Asbestos Personnel, that have been properly trained, that are wearing personal protective equipment (e.g. half face respirators with HEPA filter and disposable outer garments) and that are able to follow the appropriate work practices (Dow/OSHA).
4/93
SECTION VII
Small-Stale, Short-Puration-Eroto
The following requirements apply to small-scale, short-duration asbestos renovation(repair and maintenance activities) and/or demolition projects: 1. SCOPE- small-scale, short-duration renovation and maintenance activities are tasks such as, but
not limited to: a. Removal of asbestos-containing insulation on pipes for repair work, or b. Removal of small quantities of asbestos-containing insulation on beams or above ceiling,
or c. Removal and replacement of valves, gaskets, or d. Installation or removal of small sections of asbestos-containing drywall (not gypsum based
products) or roofing, or e. Installation of electrical conduits through or proximate to asbestos-containing materials. 2. TRAINING: a. All personnel involved with the removal, handling, and disposal of asbestos must be
trained before initial assignment and annually thereafter. b. The required contents of the employee training program are outlined in Section III of this
document.
3. SAFETY/PROTECTIVE EQUIPMENT: a. Work permits and personal protective equipment appropriate for the job and its location must be obtained prior to starting work. b. Respirators equipped with HEPA filters must be worn during removal and cleanup activities. A dust mask or disposable type respirator arc not permitted for asbestos work. c. Medical approval must be obtained prior to assigning work that requires wearing of a respirator.
d. Employees wearing respirators for asbestos work must have been fit tested within the last six months.
e. Disposable protective coveralls must be worn during removal and cleanup operations: acceptable footwear includes rubber boots or coverall boots.
4. MONITORING: a. Personnel monitoring must be performed at the beginning of the job unless workers) wear air-supplied, positive-pressure, full-facepiece respirators, or previous monitoring of similar jobs indicate 8 hour TWA exposure potentials are less than the action level of 0.1 fibers/cc. Consult Industrial Hygiene prior to starting work for information on monitoring requirements for the job in question. b. Monitoring results must be reported to affected employees as soon as possible following receipt of the results. c. Monitoring results must be communicated to the affected employee(s) in writing either individually or by posting at a centrally located place that is accessible to the affected employee(s).
DO A 04405R CONFIDENTIAL
5. RESTRICTED AREA:
SECTION VII
a. A restricted area must be established and asbestos warning signs posted to restrict access to authorized personnel only.
b. All persons entering a restricted area must be supplied with the proper respirator.
c. Movable objects must be removed from the work area to protect them from asbestos contamination.
d. Objects that cannot be removed must be covered with 6 mil-thick polyethylene plastic sheeting as well as underneath the work area.
e. Scaffold landings must be covered with 6-mil-thick polyethylene.
f. Materials must be lowered to ground level not dropped.
g. Pre-job planning must include provisions for keeping deteriorated asbestos-containing materia] in place after outer jacketing is removed.
h. Mini-enclosures or negative pressure enclosures must be used for jobs when ever feasible if the potential exposure level may equal or exceed the 8 hour TWA of 0.2 f/cc (local exhaust ventilation collection systems or other engineering control methods may eliminate the need for enclosures).
6. REMOVAL:- the following procedures must be employed singly, or in combination to achieve compliance with the permissible exposure limit of 0.2 fibers/cc.
a. Whenever feasible, wet removal methods must be used during small-scale, short-duration maintenance and renovation operations.
b. Wet methods, wetting agents, or removal encapsulates must be used before, during (e.g., cutting, removal) and after removal (e.g,, handling and cleanup).
c. Asbestos-containing material must be thoroughly wetted, but not excessively so that the material loses it integrity.
d. Dry removal may be performed with prior approval from the DEQ only in cases where asbestos removal work must be performed on live electrical equipment, on hot steam lines, or in other areas where water will seriously damage materials or equipment.
e. Dry removal must be performed using local exhaust ventilation systems equipped with HEPA Filter dust collection system, and/or enclosure or isolation of work area.
f. Hand operated or power operated tools (such as but not limited to saws, scorers, abrasive wheels, and drills) used must be equipped with local exhaust ventilation provided with HEPA filter dust collection systems.
g. Any vacuuming work performed must be done with equipment having HEPA filtering systems.
h. When ACM is removed, it must be promptly placed in labeled containers (plastic bags or wrapping). See Appendix H for labeling specifications, and Section VIII for requirements on packaging asbestos-containing waste material.
i. Whenever feasible, the surface from which the asbestos has been removed must be wetted and cleaned.
j. Termination points of exposed asbestos must be encapsulated.
k. Bags or containers of asbestos-containing waste material must be lowered to the ground, not dropped.
21
DO A 044056 confidential
SECTION VII
6. REMOVAL (continued): l. Upon completion of the removal work, a thorough inspection and cleanup of the area must be conducted. Polyethylene plastic used as covering material must be disposed of in disposal containers, and contaminated or broken disposal bags must be double bagged. m. The work area must be washed down or vacuumed as required. n. Items removed from the restricted area during removal work must be decontaminated. o. Decontamination requirements include rinsing or vacuuming gloves and boots, and the removal and disposal of suits at the work site in sealed disposal bags or containers. p. All materials used to establish the restricted area must be removed. q. Bags/plastic wrapped asbestos-containing waste materials must be transported by Environmental Operations to the Division disposal site.
G. Large-Scale, Long-Duration Asbestos Projects Large-scale, long-duration asbestos-containing material removal operations should be handled by a professional, licensed abatement contractor. Projects of this size and scope require extensive equipment, elaborate planning and procedures, decontamination, training requirements, and medical surveillance program. Operations of this magnitude will be evaluated on a project by project basis by Industrial Hygiene, Maintenance and Project Supervision.
22 DO A
conft dent i
SECTION VII
H. Equipment-Removed For Repair. Storage Or Scrap The removal of certain pieces of equipment for repair in shops, storage in equipment yards or discarding as scrap may be handled as follows: 1. For large facility components such as insulated reactor vessels, large tanks, and steam generators being sent to repair shops or storage, the regulated asbestos-containing material (RACM) is not required to be stripped if the following requirements are met: a. The equipment is removed as a unit or in sections without disturbing or damaging the RACM. b. The exposed RACM is kept adequately wet during cutting or disjoining. c. Each section or unit is carefully lowered to the floor and/or to ground level, not dropping, throwing, sliding, or otherwise damaging or disturbing the RACM. d. The component is encased in leak-tight plastic wrapping, and the leak-tight wrapping is labeled as per APPENDIX H e. The component is transported, stored, or repaired and reinstalled without damaging or disturbing the RACM. f. The vehicle(s) used for transporting the component is marked as per APPENDIX I during loading and unloading. 2. For equipment being sent to repair shops or storage equipped with nonfriable gasket and/or packing material, the gasket and/or packing is not required to be removed if the following requirements are met: a. The equipment is removed, transported, repaired, and reinstalled without damaging or disturbing the ACM. b. The presence of asbestos-containing material is conveyed to repair shop supervision. 3. For pipe equipped with nonfriable gaskets, that is being removed for the purpose of scraping, the gaskets are not required to be removed if the following requirements are met: a. The asbestos-containing pipe insulation is removed. b. The line is removed, transported and handled without damaging and disturbing the gaskets.
DO A 044058 CONFIDENTIAL
SECTION VII
I. Motorized Enuipment Clutch And Brake Repair
GENERAL: 1. Employees who work with asbestos must receive training in asbestos hazards before initial
assignment and annually thereafter.
2. Do NOT use compressed air to remove asbestos materials or dust from brake drums or clutch housing.
3. Place 6-mil polyethylene plastic sheeting underneath the work area.
SAFETY REQUIREMENTS: 1. Safety equipment required by the job location must be worn.
2. An approved respirator must be worn during material removal and clean up. Employees must have completed the mandatory fit test within the last six months.
3. Barricade area with yellow tape or rope to limit access.
REMOVAL: 1. Two methods can be used to reduce exposure to asbestos fibers. They are the Enclosed Cylinder
HEPA Vacuum System Method or the Wetting Method. a. The Enclosed Cylinder HEPA Filter Vacuum System Method consists of three components:
A wheel-shaped cylinder designed to cover and enclose the wheel assembly A compressed-air hose and nozzle that fits into a port in the cylinder, and A HEPA-filter vacuum used to evacuate airborne dust generated within the cylinder by the compressed air. b. The Wetting Method consists of spraying water containing a surfactant to loosen the asbestos containing residue and to capture the resulting airborne panicles in the water mist. Begin spraying the asbestos-containing pans at a sufficient distance to ensure that the asbestos panicles are not dislodged by the velocity of the water spray. When the asbestos panicles are thoroughly wetted, the spray may be brought closer to the parts and the pans may be sprayed as necessary to remove grease and other material. The parts must then be wiped and with disposable rags or towels which must be placed in a labeled plastic bag and sealed while they are still wet. Proper protective equipment and disposal is recommended (see Section VII. F).
2. Replaced brake shoes or pads, clutch plates, disposal rags or towels and other contaminated materials for disposal must be handled as asbestos-containing waste material (See Section VIII for information on packaging and disposal).
3. When the job is completed, a thorough inspection must be made to ensure all asbestos contaminated materials have been picked up. The work area must be vacuumed with a HEPA vac or washed down.
24
DO A 044059 CONFIDENTIAL
SECTION VIII PACKAGING. HANDLING AND DISPOSAL OF ASBESTOS-CONTAINING WASTE MATERIAL 1. No visible emissions may be discharged to the outside air during collection, processing, packaging, or
transporting of asbestos-containing waste material. The following methods must be used to control emissions: a. Adequately wet the asbestos material using a surfactant containing liquid (Fantastik) or methods
described in Section VII. Part D. (Preventing Asbestos Emissions), b. After wetting, seal the material in plastic bags labeled with an approved asbestos label (See Appendix
H for label specifications); or for materials that will not fit into bags without additional breaking, wrap materials with leak-tight 6-mil polyethylene plastic sheeting and label. c. Polyethylene bags must be sealed by duct tape or tying; tom bags must be double bagged. 2. Disposable clothing worn during asbestos removal packaging, and disposal must be placed into properly labeled polyethylene bags and disposed of as asbestos-containing waste material. 3. A plastic pack containing a polyethylene bag liner may be used to accumulate small quantities of bagged and sealed asbestos-containing wastes (Brake shoes, Brake dust, Garlock Gaskets, etc.). The drum must be labeled with an approved warning label, be labeled "For Asbestos-Containing Waste Material Only", and the top must be kept on except during deposit of waste. 4. For asbestos-containing waste material that must be transported off-site from where it is generated (Brine Production, Promix, Areas outside Dow Plaquemine Site) for disposal in the Division Landfill must in addition to the specified OSHA label, label the bags/containers or wrapped materials with the name of the waste generator and the location at which the waste was generated. 5. All asbestos-containing waste material shall be deposited as soon as practical at the approved Division Landfill. 6. Dumpsters used for unbagged asbestos-containing waste material must contain a disposable polyethylene liner obtained from, or approved by. Environmental Operations. 7. Dumpster boxes must not be filled higher than the top of the side walls.
25 Oo CO/vr I0^%
SECTION VIII 8. Dumpster liners must be lapped over and secured for temporary closure whenever the work is
discontinued for an extended period of time (overnight, holiday, weekend). 9. Dumpster liners must be securely closed before transporting the dumpsters; the sides and ends are to be
lapped over and then secured. Proper lapping and sealing procedures are provided in instructions available from Environmental Operations. 10. Tie-downs for dumpster liners must not be attached to the dumpster boxes. 11. Dumpster boxes used for asbestos-containing waste material packaging and hauling, and all bags/containers of asbestos waste (including dumpster liners) must be labeled with an OSHA approved label. 12. Warning signs, which are visible to individuals nearby, must be used on vehicles loading and unloading asbestos-containing waste material into dumpsters or vehicles used to transport the material to the Division Landfill. The signs must conform with specifications in Appendix I. 13. For asbestos-containing waste material transported to landfill for disposal (excluding material covered by yearly, blanket ADVF):
a. A record of the shipment must be completed by filling out the ADVF. b. A copy of the ADVF, including the copy signed by the Landfill Representative, must be retained
for at least 2 years by the waste generator. c. A copy of the ADVF, signed by the landfill representative, must be received by the
generator(plant/department) within 35 days of the date the waste was accepted by the transporter. If the generator does not receive the signed copy of the ADVF, they should contact Environmental Operations immediately. d. If a copy of the ADVF, signed by the Landfill Representative, is not received by the generator within 45 days of the date it was shipped to the landfill, a written report must be made to the Air Quality Division of the Department of Environmental Quality.
26 DO COf\lpr
APPENDIX A
DEFINITIONS
ACUYE WASTE DISPOSAL SITE Any disposal site other than an inactive site.
ACTION LEVEL An airborne concentration of asbestos of 0.1 fiber per cubic centimeter (f/cc) of air calculated as an eight (8)-hour time-weighted average.
ADEQUATELY WET Sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing material, then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wet. Once contained, water droplets formed inside the disposal containers will be sufficient evidence of being adequately wetted.
ASBESTOS
The asbestiform varieties of Serpentinite (Chrysotile), Riebeckite (Crocidolite), Cummingtonite-Grunerite, Anthophyllite, and Actinolite-Tremolite are considered asbestos.
ASBESTOS-CONTAINING MATERIAL IACMI Material composed of asbestos of any type and in an amount greater than 1 % by weight, either alone or mixed with other fibrous or non-fibrous materials.
ASBESTOS-CONTAINING WASTE MATERIAL (ACWM) This term includes: filters from control devices, friable asbestos waste material, and bags or other similar packing contaminated with commercial asbestos. As applied to demolition and renovation operations, this term includes: R ACM waste, materials contaminated with asbestos, and disposable equipment and clothing.
ASBESTOS MATERIAL Asbestos or any material containing asbestos.
AUTHORIZED PERSONNEL Any person authorized by the employer and required by work duties to be present in regulated areas.
CATEGORY I NONFRIABLE ACM Asbestos-containing packing, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos as determined using polarized light microscopy (PLM).
CATEGORY II NONFRIABLE ACM Any material excluding Category I nonfriable ACM, containing more than 1 percent asbestos as determined by PLM that, when dry cannot be crumbled, pulverized, or reduced to powder by hand pressure.
DO A 044062 27 CONFIDENTIAL
CLEANROOM
An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.
COMPETENT PERSON One who is capable of identifying existing asbestos, hazards, in the work place and who has the authority to take prompt corrective measures to eliminate them. The duties of the competent person include at least the following: establishing the negative-pressure enclosure, ensuring its integrity, and controlling entry to and exit from the enclosure; supervising any employee exposure monitoring required by the standard; ensuring that all employees working within such an enclosure wear the appropriate personal protective equipment, are trained in the use of appropriate methods of exposure control, and use the hygiene facilities and decontamination procedures specified in the standard; and ensuring that engineering controls in use are in proper operating condition and are functioning properly.
CUTTING Penetrating with a sharp-edged instrument including sawing, but not including shearing, slicing, or punching.
DECONTAMINATION AREA An enclosed area consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment contaminated with asbestos. The decontamination area may be adjacent and connected to the regulated area or located remotely. Workers must vacuum protective clothing, remove them and put on clean clothing before proceeding to the decontamination area if it is remotely located.
DEMOLITION The wrecking or taking out of any load-supporting structural member of a facility together with any related handling, operations, or the intentional burning of any facility .
EMERGENCY DEMOLITION / RENOVATION OPERATION A demolition or renovation operation that was not planned but results from a sudden, unexpected event that, if not immediately attended to, presents a safety or public health hazard, is necessary to protect equipment damage, or is necessary to avoid imposing an unreasonable financial burden. This term includes operations necessitated by non routine failures of equipment.
EMPLOYEE EXPOSURE Exposure to airborne asbestos that would occur if the employee were not using respiratory protective equipment.
EQUIPMENT ROOM (CHANGE ROOM! A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment.
EXCURSION LIMIT An airborne concentration of asbestos of 1.0 fiber per cubic centimeter of air (1 fiber/cc averaged over a 30 minute sampling period.
Do A 04406? 28 CONFIDENTTAL
FACILITY Any commercial, public, or industrial structure, installation, or building; any ship; and any active or inactive waste disposal site.
EACILITY COMPONENT Any part of a facility including equipment.
EIBER
A particulate form of asbestos 3 micrometers or longer, with a length-to-diameter ratio of at least 3 to 1.
FRIABLE ASBESTOS MATERIAL
Any material containing more than 1 percent as determined using PLM, that, when dry can be crumbled, pulverized, or reduced to powder by hand pressure. If the asbestos is less than 10 percent as determined by a method other than point counting by PLM, the asbestos content must be verified by point counting using PLM.
GRINDING Reduce to powder or small fragments and includes mechanical chipping or drilling.
HIGH-EFFICIENCY PARTICULATE AIR (HEPA) FILTER A filter capable of trapping and retaining at least 99.97 percent of all monodispersed particles of 0.3 micrometers in diameter or larger.
LNPQOR CONDITION The binding of the material is losing its integrity as indicated by peeling, cracking, or crumbling of the material.
INACTIVE WASTE DISPOSAL SITE Any disposal site or portion of it where additional asbestos containing waste material has not been deposited within the past year.
LEAK-TIGHT
Solids or liquids cannot escape or spill out of. It also means dust-tight.
MANUFACTURING The combining of commercial asbestos with any other material(s and the processing of this combination into a product. Chlorine production is considered a pan of manufacturing.
MINI-ENCLOSURE An enclosure constructed of 6 mil polyethylene sheeting to restrict access to the area where small-scale, short duration asbestos maintenance or renovation work is to be performed. The enclosure must have a contiguous change room where workers vacuum off protective coveralls and remove them before Leaving the work area.
29 DO A 044064
CONFIDENTIAL
NEGATIVE PRESSURE ENCLOSURE An enclosure for large-scale long duration projects constructed of 6-mil polyethylene sheeting and equipped with a ventilation system (which discharges through a HEPA filter) capable of creating a negative pressure of 0.02 inches of water inside the enclosure. Where feasible, a decontamination area should be continuous to the enclosure and should be the only means of egress.
NONFRIABLE ASBESTOS-CONTAINING MATERIAL Any material containing more than 1 percent asbestos as determined using PLM, that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
NONSCHEDULED OPERATIONS Any individual renovation and/or demolition operation necessitated solely by the need for repair or maintenance of facility components, and involves a total of less than one cubic yard of RACM per operation. An operation cannot be artificially sub-divided into several smaller operations for the purpose of meeting the less than one cubic yard requirement.
PERMISSIBLE EXPOSURE LIMIT (PEL) No employee shall be exposed to an airborne concentration of asbestos in excess of 0.2 fibers per cubic centimeter of air as an eight-hour time-weighted average (8 hr. TWA.)
PLANNED OPERATIONS A demolition and/or renovation operation, or a number of such operations, in which the amount of friable asbestos material that will be removed or stripped within a given period of time can be predicted. Individual nonscheduled operations are included if a number of such operations can be predicted to occur during a given period of time based on operating experience.
REGULATED AREA An area established by the employer to demarcate areas where airborne concentrations of asbestos exceed or can reasonably be expected to exceed the permissible exposure limit and/or the 1 fiber/cc short-term excursion limit. The regulated area may take the form of a temporary enclosure, or an area demarcated to restrict area and minimize the number of employees potentially exposed to asbestos.
REGULATED ASBESTOS-CONTAINING MATERIAL (RACM) Friable asbestos material; Category I nonfriable AC that has become friable; Category I nonfriable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading; Category II nonfriable ACM that has high probability of becoming or has become crumbled, pulverized, or reduced to powder by forces expected to act on the material in the course of demolition or renovation operations.
RLMQ.YE To take out RACM or facility components that contain or are covered with RACM from any facility.
RENOVATION Altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component, that is to be returned or to remain in place. Operations in which loadsupporting structural members are wrecked or taken out are considered demolitions.
DO A 044065 30 conftdfntial
REPAIR Overhauling, rebuilding, reconstructing, or reconditioning of structures or substances where asbestos is present. RESILIENT FLOOR COVERING Asbestos-containing floor tile, including asphalt and vinyl floor tile, and sheet vinyl floor covering containing more than 1 percent asbestos as determined by polarized light microscopy, SMALL-SCALE. SHORT-DURATION ACTIVITIES The tasks such as, but not limited to: the removal of asbestos-containing insulation on pipes to repair; the removal of small quantities of asbestos-containing insulation on beams or above ceilings; the replacement of an asbestos-containing gasket on a valve or a flange; the installation or removal of a small section of DRY WALL material containing asbestos; or the installation of electrical conduits, pipe, or cable through or proximate to asbestos-containing materials. SURFACTANTS Chemicals added to a material (e.g, soaps, herbicides, paints, etc.) to improve its wetting ability, VISIBLE EMISSIONS Any emissions, which are visually detectable without the aid of instruments, coming from RACM or asbestos-containing waste material, or from any asbestos milling, manufacturing, or fabricating operation. WASTE FROM ASBESTOS CONTROL DEVICES Any waste material that is placed or collected in asbestos control equipment. WASTE GENERATOR Any owner or operator of a source whose act or process produces ACM. WASTE SHIPMENT RECORD The shipment document (ADVF) required to be originated and signed by the waste generator or the owner or operator of a demolition or renovation activity, used to track and substantiate the disposition of ACWM. WET REMOVAL The application of a wetting agent to asbestos or asbestos containing material prior to and during removal and/or stripping work. WORKING DAY Monday through Friday, including holidays that fall on any of the days Monday through Friday.
31 00
COA/f-
APPENDIX B VISUAL EMISSION MONITORING METHOD This method applies to the visual monitoring of each potential source of asbestos emissions from any manufacturing or fabricating facility, including air cleaning devices, process equipment, and buildings housing material processing and handling equipment, at least once per days during daylight hours for visible emissions to the outside air during periods of operation. 1. The log sheet included in Appendix C must be used to document the daily visual observations. 2. Both outside observation of sources of potential emissions (e.g. from building/structure, tanks/vessels, equipment vents, etc.), and inside observation for emissions directly emitted from the affected facility process. 3. The observer should select a position that provides a clear view of the potential emission points. 4. A position of a least 15 feet from the emission source is recommended. For outdoor locations, select a position where the sun is directly in back of point source if possible. For indoor observations, select a position where illumination is directly in back or over the source of potential source of emissions. 5. The observation must be made for at least 15 seconds per emission source. 6. During the observation period, continuously watch the emission source (condensed water vapor is not considered an emission). 7. The observation of intermittent or cyclic sources of potential emissions should coincide with that period of the process cycle. 8. Occasionally, the view of the potential emission source may be obscured due to atmospheric interferences (e.g., road dust, fog, smoke, etc.). When this situation occurs, the observation should be terminated, and the observer should clearly note this fact on the data form.
32 0 A 044067
CONFIDENTIAL
APPENDIX C RECORD QF VISIBLE EMISSION MONITORING The following instructions should be followed in filling out the visible Emission Monitoring Record Sheet (see attached copy). 1. Fill in date and time of each inspection. 2. Identify air cleaning device, process equipment, and buildings housing material processing and handling equipment. 3. Record presence (Yes or absence (No) of visible emissions observed, and corrective action taken to eliminate emissions if necessary. The monitoring must be a visual observation of at least 15 seconds per potential source of emissions. 4. Record daily hours of operation for each air cleaning device. 5. Individual performing visible emission monitoring must initial monitoring record. 6. Retain visible emission monitoring record sheet for at least 2 years.
DO A 044068 CONFIDENTIAL
APPENDIX C
RECORD OF.Y1SIBIE EMISSION MONITORING
Date of
Inspection
(mm/dd/yy)
Time of
Inspection
(A.M./P.M.)
Air Cleaning Device or Fugitive Source Designation or Number
Visible Emissions Observed
(yes/no)
Corrective Action Taken
Daily Operating
Hours
(A.M./P.M.)
Inspector's Initial
oo
34 co/vr
APPENDIX D
AIR CLEANING DEVICE INSPECTION CHECKLIST
1. Air cleaning device designation or number
________________
2. Date of inspection
________________
3. Time of inspection
____________ ,,
4. Is air cleaning device operating properly (yes/no)
________________
5. Tears, holes, or abrasions in fabric filter (yes/no)
________________
6. Dust on clean side of fabric filters (yes/no)
_______________
7. Other signs of malfunction or potential malfunctions (yes/no)
_______________
8. Describe other malfunctions or signs of potential malfunctions.
9. Describe corrective action (s) taken.
10. Date and time corrective action taken 11. Inspected by:
_________________
(Print/Type Name)
Title
Signature
NOTE: Retain inspection checklist for at least 2 years.
Date
044070 DO
35 CONF
APPENDIX E
NOTICK.OF INTENTION FOR DEMOLITION OR RENOVATION
The following instructions should be followed in filling out the Notice of Demolition or Renovation (see attached copy) for the purpose of obtaining an ADVF.
1. Fill out the specified sections explained in Item #3 below in pencil and forward to Industrial Hygiene for completion and transmittal to the DEQ.
.2 Sections numbered III, IV, V, VI, VII, VIII, IX, X and XI should be completed by
the appropriate plant, building, or project associated Dow representative.
3. Section III: Complete this section by specifying the type of operation.
Section IV: Mark if asbestos is present or not.
Section V:
Complete this section by specifying the plant or building name, and the telephone number of the Dow person closely associated with the job. If the job directly involves a building then information on it's size, number of floors, age, present use, and prior use must be provided.
Section VI: Specify whether a sample of the material was taken and I.D. analysis was performed or not.
Section VII:
Under the column designated RACM, list the amount of asbestoscontaining material being abated on the proper line. Place a check mark behind the unit of measurement in that portion of this section.
Section VIII: Specify the dates on which asbestos removal will start and will be completed.
Section IX: Specify the dates for the demolition or renovation work of which the asbestos removal is a part.
Section X:
Write a brief description of the demolition or renovation work to be done.
Section XI:
List the work practices and engineering controls (e.g. wet method, glove bag (s), plastic wrap, mini enclosure, total enclosure, etc.) that will be used to prevent emissions.
4. Forward the completed form to the Industrial Hygiene Department 18 * 20 days prior to start of any work associated with the demolition and/or renovation (Starting work is considered to be any activity that would break up, dislodge, or similarly disturb asbestos material).
36 OAAOV'i DO A
COHFl
_______NOTIFICATION OF DEMOLITION AND RENOVATION
# of ADVFs Requested
Parish #
Source #
I. TYPe 6f NOTIFICATION (Q=Original
R=Revised
11 FACILITY INFORMATION (Identify owner, removal contractor, and other operator)
OWNER NAME:
FORM AAC-2 REV 7/17/91 TELEPHONE (504)765-0219
ADVF# C=Cancelled):
Address:
City:
State:
Zip:
Contact: IEM0VAL^6MtRACr0k:
La. Contractor's License #:
Tel:
DEQ Supervisor #:
Address:
City:
State:
Zip:
Contact:
Tel:
OTHER
Address:
City:
State:
Zip:
Contact:
Tel:
ID. TYPE OF OPERATION (D=Dcmo Q=Ordered Demo R=Renovation E=Emer. Reno):
IV. IS ASBESTOS PRESENT? (Yes/No)
V. FACILIT Y DESCRIPTION (Include building name, number and floor or room number)
Bldg. Name: Address:
Fire Marshall Project #:
City: Site Location:
Zip:
State:
Parish:
Tel:
Building Size:
# of Floors:
Age in Years:
Present Use:
Prior Use:
VI. PROCEDURE, INCLUDING ANALYTICAL METHOD IF APPROPRIATE, USED TO DETECT THE PRESENCE OF
ASBESTOS MATERIAL:
Nonfria ble
VH. APPROXIMATE AMOUNT OF ASBESTOS, INCLUDING:
asbesto s materia1
Indicate Unit
1. Regulated ACM to be removed 2. Category I ACM Not Removed
RACM To Be
NOTT 0 Be Rentoved
_____ Measurement
Below
3. Category II ACM Not Removed
Removed
Cat I Cat n
UNIT
Pipes
Ln Ft:
Ln m:
Surface Area
Sq Ft:
Sq m:
Vol RACM Off Facility Component
CuFt:
Cu m:
Vm. SCHEDULED DATES ASBESTOS REMOVAL (MM/DD/YY) START:
COMPLETE:
IX. SCHEDULED DATES DEMO/RENOVATION (MM/DD/YY) start:
COMPLETE:
REMIT TO: DEQ/AIR QUALITY DIV. P.O.BOX 82135 BATON ROUGE 70884-2135
DO A 044072 CONFIDENTIAL
37
_____________________ NOTIFICATION OF RENOVATION__________________ (continued)
X. DESCRIPTION OF PLANNED DEMOLITION OR RENOVATION WORK, AND METHOD(S) TO BE USED:
XI. DESCRIPTION OF WORK PRACTICES AND ENGINEERING CONTROLS TO BE USED TO PREVENT EMISSIONS OF ASBESTOS AT THE DEMOLITION AND RENOVATION SITE:
m WASte tRANSpSETER #ir
Name:
Address:
City:
State:
Contact Person:
XXL WASTE tfeAMSWkTfeR # 2:
Zip: Telephone:
Name:
Address:
City: Contact Person:
State:
Zip: Telephone:
Xm. WASTE DISPOSAL SITE: Name:
Location:
City:
State:
Telephone: XIVJF DEMOLITION ORDERED BY A GOVERNS ENT A6fchlCY,t>LfcASfe IDEI^tlfY THE aOnCV:
Name: Authority: Date of order (MM/DD/YY):
Title: Date ordered to begin (MM/DD/YY):
XV. FOR EMERGENCY RENOVATIONS: Date and hour of emergency (MM/DD/YY):
Description of the Sudden, Unexpected Event:
Explanation of how the event caused unsafe conditions or would cause equipment damage (or an unreasonable
financial burden):
______________
XVI. DESCRIPTION OF PROCEDURES TO BE FOLLOWED IN THE EVENT THAT UNEXPECTED ASBESTOS IS FOUND
OR PREVIOUSLY NONFRIABLE ASBESTOS MATERIAL BECOMES CRUMBLED, PULVERIZED, OR REDUCED TO POWDER.
XVII. I CERTIFY THAT AN INDIVIDUAL TRAINED IN THE PROVISIONS OF THIS REGULATION (40 CFR PART 61,
SUBPART M) WILL BE ON-SITE DURING THE DEMOLITIONOR RENOVATION AND EVIDENCE THAT THE REQUIRED TRAINING HAS BEEN ACCOMPLISHED BY THIS PERSON WILL BE AVAILABLE FOR INSPECTION DURING NORMAL BUSINESS
HOURS. (Required 1 year after promulgation)
(Signature of Owner/Operator)
XVii. I Certify THaT THE ABOVE i^POrmatiON is COrreCt
(date)
(Signature of Owner/Operator)
(date)
PURSUANT TO R.S. 40:1574 A&B. BE ADVISED THAT NO CONSTRUCTION OR RENOVATION CAN BEGIN UNTIL THE PLANS AND
SPECIFICATIONS ARE REVIEWED BY THE OFFICE OF THE STATE FIRE MARSHAL OR IT IS DETERMINED BY THAT OFFICE THAT
PLANS ARE NOT REQUIRED TO BE SUBMITTED.
38
DO A 044073 CONFIDENTIAL.
APPENDIX F
ASBESTOS DISPOSAL VERIFICATION FORM (ADVE1
The following instructions should be followed in completing the Asbestos Disposal Verifications Form (see attached copy). 1. Instruction for Generator of asbestos-containing waste material:
a. An ADVF number and facility code will be assigned by the DEQ and will be located at the top of form.
b. Line 15 - list name of waste transporter (i.e., Dow Environmental Operations).
c. Line 16 - a project number will be assigned by DEQ for work for which the ADVF was issued.
d. Line 17 - list quantity of individual loads of asbestos-containing waste material transported to landfill.
e. Line 18 - list date of shipment for each load listed on line 17.
f. Line 19 - list the following disposal site information - Dow Chemical U.S.A., Louisiana Division, Block 80, Solid Waste Landfill.
g. Line 20 - list the date of final shipment of asbestos-containing waste material to landfill.
h. Line 21 - name of project associated Dow individual.
i. Line 22 - signature of individual listed on Line 21.
j. Remove green copy of multiple copy ADVF form.
k. Present remaining copies of ADVF to waste transporter on final shipment of waste material.
2. Instructions for Transporter of asbestos-containing waste material: a. Insure all asbestos-containing waste material is in leak-tight, undamaged containers.
b. Insure Generator has filled out all items that must be completed before acceptance of ADVF.
c. Line 23 - list date of acceptance of ADVF.
d. Line 24 - list date of delivery to landfill.
e. Line 25 - name of individual who delivered asbestos-containing waste material to landfill.
f. Signature of individual listed on Line 25.
g. Remove pink copy of multiple copy ADVF form.
h. Present remaining copies of ADVF to landfill responsible personnel.
39
APPENDIX F (continued) Instruction for Landfill Operator for asbestos-containing waste material. a. Insure all asbestos-containing waste material is in leak-tight, undamaged
containers. b. Check expirations date (line 4) of ADVF. Expired ADVFs must not be
accepted. C. Line 27 list total quantity of asbestos-containing waste material
received for work covered by the ADVF. d. Line 28 - list date material is buried. Material must be buried as per
DEQ approved procedures. e. Line 29 - name of individual receiving last shipment of waste material
for the removal work covered by the ADVF. f. Signature of individual listed on line 29. g. Remove gold copy of multiple copy of ADVF form and return it
to generator listed on line 21. h. Retain yellow copy of ADVF. i. Mail original completed copy (white) of ADVF to the DEQ
(address located on top of form).
Do A 04407s CONFIDENTIAL
40
State Of Louisiana Department of Environmental Quality Air Quality Division P.O. Box 44096 Baton Rouge, LA 70804-4096
APPENDIX F
__________________ ADVF#
Facility"HodeT^
ASBESTOS DISPOSAL VERIFICATION FORM
1) OWNER'S NAME & MAILING ADDRESS-ZIP
3)ISSUE DATE
4)EXPIRATION DATE
21 OWNER'S PHONE (
1
5) CONTRACTOR'S NAME & MAILING ADDRESS-ZIP
7)PROJECT START DATE 8)PROJECT COMPLETE DATE
61 CONTRACTOR'S PHONE (
1
9) PROJECT LOCATION & MAILING ADDRESS-ZIP
1 l)PROJECT START DATE 12)PROJECT COMPLETE DATE
101 CONTRACTOR'S PHONE (
13) PRINTED /TYPED NAME
OWNER/OPERATOR 15) WASTE TRANSPORTER
1
19) DISPOSAL SITE
201 DATE SHIPPED 21) PRINTED/TYPED NAME
TRANSPORTER 231 DATE RECEIVED 25) PRINTED/TYPED NAME
LANDFILL 271 OUANTITY RECEIVED 29) PRINTED/TYPED NAME
31) SPECIAL CONDITIONS OR COMMENTS:
14) SIGNATURE
16)PROJ#
DATE 17)QUAN. 18)COMPLETED
1. 2.
3. 4.
22) SIGNATURE
241 DATE DELIVERED 26) SIGNATURE
28) DATE BURIED 30) SIGNATURE
COPIES: WHITE - DEQ; GREEN - OWNER; YELLOW - LANDFILL; PINK - TRANSPORTER; GOLD - OWNER
41 0 A
cO 4407/z ^ttai
APPENDIX G
PUBLIC HEALTH ORGANIZATIONS
The following organizations provide smoking cessation information and program material:
1. Office of Cancer Communications National Cancer Institute National Institutes of Health Building 31, Room 10A24 Bethesda, Maryland 20892
2. American Cancer Society 3340 Peachtree Road, NE Atlanta, Georgia 30062 (404) 320-3333
3. American Heart Association
7320 Greenville Avenue
Dallas, Texas 75231
(214)750-5300
4. American Lung Association 1740 Broadway New York, NY 10019 (212) 245-8000
5. Office on Smoking and Health U.S. Department of Health and Human Services
5600 Fischers Lane Park Building, Room 110 Rockville, Maryland 20357
DO A 044077 CONFIDENTIAL
APPENDIX H WARNING LABEL FOR BAGS7 CONTAINERS In order to communicate the hazards of asbestos-containing waste material in plastic bags and containers, labeling must be done in accordance with the following requirements: 1. OSHA approved warning labels must be affixed to all bags, containers, or wrapped packages of asbestos-containing waste material. 2. Labels and lettering must be of sufficient size and contrast so as to be readily visible and legible. 3. Labels must display the following legend: Labels on bag/container/wrapped packages:
DANGER CONTAINS ASBESTOS FIBERS
AVOID BREATHING DUST CANCER AND LUNG DISEASE HAZARD
DO A 044078
43 CONFIDENTIAL
APPENDIX I WARNING SIGN FOR VEHICLE LOADING/IINLOADINO In order to communicate the hazards of asbestos-containing waste material during the loading/unloading operation, the transporting vehicle must comply with the following requirements: 1. Vehicles used to transport asbestos-containing waste material must be marked during the loading and unloading of the waste. 2. Vehicle marking must be visible and be displayed in such a manner and location that a person can easily read the legend. 3. The sign must be 20" X 14" with the spacing between any two lines at least equal to the height of the upper of the two lines. 4. The markings must display the following legend:
DANGER ASBESTOS DUST HAZARD CANCER AND LUNG DISEASE HAZARD
Authorized Personnel Only
DO A 044079 CONFIDENTIAL
44