Document O1gLoE5v7aqrYkK9qDzmR8BqQ
McGRAW
CONSTRUCTION COMPANY INC ENGINEERS & CONSTRUCTORS
TO: DISTRIBUTION
FROM: P. 2IEGLER
SUBJECT: EMPLOYEE EXPENSE REPORTS
APRIL 16, 1990
This is an updated contract status list of project mangers responsible for approving all expense reports with charge numbers to their contracts.
PLEASE REMEMBER THAT ALL SIGNATURES SHOULD BE FIRST AND LAST NAME - NO INITIALS'
The following is a list of the project managers on the active contracts:
CONTRACT
DESCRIPTION
PROJECT MANAGER
146S 1466
1478 1479 1484
1492 1499 1503 1504
1505 1510 1511 1513 1514
1515 1516 1517 1519 1520 1521 1522 1523 1524
1525 1526 1527 1528 1529 1530 1531 1 532 1533 1534
1535 1 536 1537
1536 1539 1540 154 1
1542 5000
MANN DEMAG, ARMCO CASTER-CONST MANN DEMAG, ARMCO CASTER-ENG BETH ST, PUSHING EMISSION WORLDSOURCE, COIL COATING MANN DEMAG, NEWPORT, SLAB CASTER
ARMCO, REBUILD STOVES BETH ST, COKE SHED ELECTRIC METALLURGY, LADLE fUR INCO ALLOYS, BAR t WIRE MIL1 DAVY MCKEE, WALKING BEAM ARMCO, COIL PAINT FUME VENT ARMCO. TUNDISHWATER MODEL ARISTECH, PROJECT ENGINEER NAT *L ST, 0-4 BLAST FURNANCE ARMCO, OXYGEN PIPE CLEANING ARISTECH, VALVE ACCESS IMPR ARISTECH. DRAFTING SUPPORT INCO ALLOYS, WEST VA ARMCO, INST OF COMMUNICATION SYS NAT'L STEEL - GRANITE CITY BARMET ALUM, PHASE 1 MARION STEEL GEORGIA POWER BARMET ALUMINUM, PHASE 11 SOUTHPOINT ETHANOL LATHROP COMPANY MITSUBISHI BARMET ALUMINUM
ARMCO SOUTH POINT ETHANOL DUPONT AMETEK MARION STEEL ARMCO - ASHLAND ITALIMPIAN TI
INCO ALLOY
INCO ALLOY MARION STEEL MANN DEMAG CALGON carbon ARMCO STEEL MAINTENANCE CONTRACTS
RON AUSTIN RON AUSTIN MIKE PRESTA MIKE KUNTZ JOHN BLOUNT MIKE NEI8ERT MIKE PRESTA DAVID VICE DAVID VICE
HAnurrw ftyuu- /Wwes4rt<-<-
MIKE NEIBERT DON BARSALOU BILL HALL JIM CRUM RON AUSTIN
DAVID VICE BILL HALL LARRY LAMERSON RON AUSTIN JIM CRUM KEN BLEVINS DAN FORSEYTHE KEN BLEVINS KEN BLEVINS GENE BOWDEN LEE WARNER KEN BLEVINS KEN BLEVINS LEE WARNER GENE 80WDEN LARRY LAMERSON LARRY WORKMAN DAN FORSEYTHE LARRY WORKMAN WARREN FRETWELL JOHN HOLMBERG
JOHN HOLMBERG DAN FORSEYTHE JIM GARDNER
BILL HALL LEE WARNER LEE WARNER
T: JFC, SCH, DBB, DEV, LJW, RFA, IMN, JWB, MDP, MJK, SDB, JYC, RMF, VNH, JBK, RHL, LEL, DPF, ERB, LGW, JPH JTG, WTH, WEF, KRB
McGCon 201 136
M*C*G*R*A*W**C*O**N*S*T*R*U*C*T*IO*N***********14**92***C*H*A.*x*T**O*F**A*C*C*O*U*N*T*S
0100-0110 0902-0820 0902-0860 0902-0914 0902-0931
0902-0932 0902-0985 0902-0990 0902-0991 106 0-0010_ 1060-0020 2100-0020
2100-0030 2120-0030 4140-0040 4140-0051 4140-0070 4170-0090 4170-0092 4170-0074 4170-0096 4180-0010 4200-0120 4200-0124 4230-0130 4230-0134 4410-0140 5330-0150 5340-0160 5340-0170 5590-0180 5610-0190 5640-0020 5680-0210 5710-0220 5720-0230' 5800-0240 7000-0300 7000-0310
EQUIPMENT RENTAL
SMALL TOOLS CONSUMABLES
TEMPORARY FACILITIES SCHEDULING/COST
/no
FIELD SUPPORT
FIELD STAFF
CONSTRUCTION MGMT
WINTER PROTECTION
MISC MATERIAL SWINGING SCAFFOLD - INTERIOR/EXTERIOR
FABRICATE SWINGING SCAFFOLD
ANCHOR BOLTS
PLUM STOVE
DOME ACCESS
STOVE TEAR OUT
INSTALL COLUMNS AND CASTINGS
ASBESTOS REMOVAL
STOVE BURNER WORK
BURNER VALVE AND NOZZEL WORK
INSTALL OPENING
REINSTALL BURNER SHELL PLATE
STOVE DOME STEELWORK
STOVE BOTTOM AND FOUNDATIONS
POUR CASTABLE BOTTOM
STOVE REFRACTORY
STOVE DOME REFRACTORY
CONNECT/DISCONNECT COOLING WATER PIPE
STOVE GAS MAIN
REMOVE/REPLACE GAS VALVES
REMOVE/REPLACE HOT BLAST VALVES
REMOVE/REPLACE BLOW-OFF VALVES
REALIGN HOT BLAST CONNECTION
REMOVE/REPLACE COMBUSTION AIR VALVES
CONNECT/DISCONNECT STOVE SERVICE PIPE
PAINT STOVE
STOVE LIGHTING
REMOVE/REPLACE COLD BLAST VALVES
EQUIPMENT OPERATOR SUPPORT
SCAFFOLD LABOR SUPPORT
9800-0020 9800-0021 9800-0022 9800-0023 9800-0024 9800-0025 - 9800-0026 9800-0027 9800-0028 9800-0029
9800-0030 9800-0031 9800-0032 9800-0033 9800-0034
30" LINE 10" LINE MODIFY HOT BLAST VALVE REMODIFY THE HOT BLAST OPENING #2 FABRICATE BRACKET GAS VALVE WORK REMOVE/REPLACE HOT BLAST VALVE #2 15* x 16' SHELL PLATE WORK REPLACE STOVE BOTTOM
REPAIR CRACKS #3 STOVE SHELL
REWORK DOME BRICK RING SUPPORT STEEL LUGS #3 REWORK DOME BRICK RING SUPPORT STEEL LUGS #1 REROUTE STOVE H GAS WASHER ACCESS PLATFORM STOVE BURNER
REPAIR BRICK IN BREECH AND CHIMNEY VALVE CONNECTION
McGCon 201137
MCGRAW CONSTRUCTION
1492 CHART OF ACCOUNTS
^***'**'<r--*j***'*-*****'*-*''ilr****'*f****'*'*'*r*'**'*'*** + ****'*'-******1^^%^
9800-0035 9890-0036 9300-0037 9800-0033
9800-0039
ACCESS PLATFORM TO THE 8" BUTTERFLY & KNIFE GATE VALVE FOR GAS ENRICHMENT SYSTEM
MODIFY BURNER AIR FANS/VANE OPERATORS
MODIFY EXISTING PLATFORM FOR BURNER VALVE AC
ELECTIC FROM THE ELEVATOR AREA OVER THE NEW WALKWAY THAT IS LOCATED ABOVE THE 10" NITROG LINE TO THE GAS WASHER.
NSW AIR LINE TO GAS ENRICHMENT VALVE