Document O1R56pJNb0xmeN0k6gLQeXZ7j
Monsanto
FROM (NAME ft LOCATION) JJ
J) # St6
Krummrich
>te =. January 17# 1972
:
REFERENCE
:
PCB ENVIRONMENTAL CONTROL SAMPLING
TO :
Mr. A. E. Leisy
CC: G. L. Bfatsch C. F. Buckley B. L. Caraway W. C. Engman P. E. Heisler G. A. Hippe R. M. McCutchan. J. R. Savage - G.O.
We have reviewed the existing sampling system to control
PCB losses within the plant and to provide historical
data related to the effectiveness of the PCB control
program.
.
At present; We obtain samples on a routine basis. (Thursday and Monday) at five locations
b-Z
Department Effluent
2-A
2b" plant exit sewer
1-B
30M plant exit sewer
Influent Waste Treatment Plant
Effluent Waste Treatment Plant
Future:
Per our discussions we will eliminate sampling 'b-Z, 2-A and 1-B on a routine basis. We will
limit our routine sampling to the Waste Treatment Plant In-fluent and Effluent.
The Waste Treatment Plant Influent best reflects the true losses from the plant. At this point we note trends and can evaluate effects of the control program.
The Waste Treatment Effluent indicates PCB*losses to the river. Our goal at this point is 1 #/day. Measurements at this point would be of prime concern to any control agency because at this point the stream flows to the river.
All other samples are for control purposes and will be on a non-routine basis as we further perfect sampling techniques and want to better define sources requiring additional control.
We plan to continue to perfect the PCB sampling technique such that the results truly reflect the amount of PCB's present in the sampled stream.
DSW 296284
STLCOPCB4066228
Mr. A. E. Leisy PCB ENVIRONMENTAL CONTROL SAMPLING
Page 2 1/17/72 WGK
A PCB laboratory analysis costs about $50. Our program is designed to give us the required control data at mini mum costs.
Edward E. Stewart Technical Services Department
/tm
DSW 296285
STLCOPCB4066229