JONES MILLS REDUCTION PLANT ASBESTOS STUDY
March 5, 1983
SAMPLE NO. & DESCRIPTION
A-l Parrish, W., Pipe Fitter, removing insul. #110 Carbon Plant Mixer, E. Side
A-2 Parrish, W., removing insul. from E & S Sides, beginning clean-up
A-3 Parrish, W., Clean-up, removing insul. from mixer door
B-l Newell, J. D., Pipe Fitter, removing insul. #110 Carbon Plant Mixer, N. Side
B-2 Newell, J4. D., Removing insul. from W & S Sides
B-3 Newell, J. D., Removing insul. from S Side
B-4 Newell, J.' D., Removing insul. from S Side and clean-up
TIME (min.)
15
18
62
19
36 18 62
CONC.ASBESTOS (Fibers/cc)1
0.42^
1.50
0.20,,
2.24
0.70
>
0.18
0.13
J
8-RR.TWA CONC. (Fibers/cc)2
0.10
0.16
1 OSHA standards for IS min.- ceiling value for asbestos is 10 fibers/cc.
2 OSHA 8-hr. TWA standard for asbestos is 2 fibers/cc. Medical surveillance is required when 8-hr.TWA is 0.1 fiber/cc or greater.