Document Nm5L2YZ6O6oNr0QDeg13VX3V

1-c unjamry6.1953.1h.- .n:.j... , ..l- bearing rollers. Furnace auxiliaries Work then proceeded on the pip 'J!n n^nthcp.ojcccwns.HO.nstn.,- nuIl of .ho new heating fumacv , . and mill additions were installed or partially assembled as space and mill ing connections to the recuperator and combustion equipment, the j minimum of hunlVn ncv w,,h operations would permit. The old billet charger, pushing machinery, urixliicli1"1- This wns do,,- by - mill was shut down at 11:00 p.vt. billet ejector, pinch rolls, waste gas `mucm.u U ill an arK* cIus'' 10 tlu' Deceiulier 2d, 1932. The permanent piping, etc. m.w ,,,-t tiKMit ut location <>" lrM1rMy foundation in which heavy Inundation lor the new furnace was completed on December 27, and the A small temporary furnace 5 ft wide and 30 ft long Was installed to ,rack rails were imbedded. It was supported on 132 anti-friction roller new lurnaee rolled into position with hydraulic jacks. bridge the space between the furnace push-out door and the first stand of the old mill in order that production could proceed while the foundations for the new stands were being com pleted. Slabs heated to 2100 F started passing from the new furnace, through the small furnace and to the oil mill at 7:00 a.m. January 6, 1953, after 16'A days of construction. The new stands and gearing changes were then completed during mill oper ations. This installation is an example of effective modern engineering and planning between mill operators, engineers, and equipment builders wherein an important production unit obtained an increase in capacity with minimum loss of product at a reasonable cost. Besides the Elliott 1000-hp d-c motor, a number of Elliott C-W mill type and totally-enclosed fan-cooled motors are in service in this mill. PAGE