Document NkaQ52YD1b6RKr46MKd7V8M8

,uttec' Garments on "Operations Procedure for Asbestos Rsnoval" AWT Bdl Laboratories dale May 10, 1984 t.om c. P. Lichtenwalner m 77621 1F-110 X5399 H. R. Fitch: With regard to your April 3, 1984, Manorandun for Record on "Operations Procedure for Asbestos Ranoval" we have noted sev eral areas that were not addressed that we feel are essential to assure employee health and ocrpliance with regulatory require ments. 1. Protective clothing should be worn to prevent contamination of personal clothing and dispersion of asbestos-containing debris throughout the build ing and to the hemes of the enyloyees. 2. All respirators used must have NIOSH/>6HA approval for asbestos-containing dusts. 3. Any wastes containing asbestos must be sealed in inpeuneable containers, appropriately labelled, and disposed of in an approved landfill. Waste manifests and landfill receipts oust be retained to verity ccnpliance with EPA regulations. 4. Procedures should specify removal of respirators as final step of work operations. 5. Meticulous clean-tp of any work area is required to prevent dispersion of asbestos. We reccmmend oovering work area with disposable plastic drop cloths (to be removed as asbestos contaminated waste) and subsequent vacuuming of area with a EEPA filter equipped vacuun cleaner restricted in use for asbestos operations. 6. An asbestos program manager should be appointed to oversee all asbestos jobs including pre-survey and post-survey checkout of all work. 7 . Occupants and all other personnel not wearing respirators and protective clothing must be restricted from areas while work is proceeding. LLA 001727 H. R. Pitch - 2 8. If work is being performed in an area used as part of the supply or return air, the fans should be shut down, the area sealed, or the work performed out-of-hours during ndninal occupancy of the building. 9. Representative work operations should be monitored to assess exposure levels. 10. All individuals performing work requiring disturbance of asbestos-containing materials must be trained in: a. proper ranoval procedures, b. proper use of respirators, and c. hazards of asbestos. 11. Any work involving ranoval of more than 260 lineal feet of pipe or more than 160 ft2 of surface area requires notification of HA (and probably other regulatory agen cies. } You nay want to consider the attached "Procedures for Work Requiring Handling or Disruption of Asbestos-Oontaining Materials" which has been developed as a guideline for work operations with slight or minimal disruption of asbestos-containing material. If you need any further information please let us know. Sincerely, P. A. Buggins ir HB-77621-CPL-jve Copy to: W. W. Crawford D. Rainer W. J. Schreibeis G. M. Wilkening C. P. Licbtenelner LLA 001728