Document NermKq4eGrz00gpvOJqJbryjD
September 3, 1969
TO: FROM:
W. J. Sheehan E. F. Holy
SUBJECT:
Activity Report for August, 1969 Raw Material Division
Department 201
Wet Machine Operation performed during the first two weeks of August. Received first delivery of purchased #70 Asbestos Board.
Department 203 - 204
No unusual activity to report in this area.
Department 205
Anticipated hourly productivity was not attained on Corbestos Inline Equipment, due to problem of excessive machine downtime caused by purchased Asbestos Board splitting apart during operation. The vendor has been invited to observe our problem, and investigation has been started to determine the cause of Asbestos splitting to determine whether material acceptance standards should be more stringent.
Department 206
Repair of the Induction Unit completed after three week shut-down. Operating on three shift basis to meet falldown demands. Victocore Inline Machine utilization lower than anticipated due to training of new operators restricting the machine output.
Department 207
Investigating possibility of increased machine capacity with resulting cost re duction on Calendaring Operation.
Department 213
Increased production requirements necessitated the addition of two (2) Punch Press Operators for Victolene Blanking.