Document Nemgn7zB7K7pw2VenJBaqJ0rR

Catalyst Seal Bnlsslona froblm . s SnlBBion from catalytic converter asbestos seals during assembly at Monroe and supplier facilities. Reference Ford Monroe Plant was visited on November 9, 1973 in order to observe the assembly of the asbestos seals on the catalytic converter end to observe the collection of an air sample by Industrial hygiene during the esseably operation. Background MSD and outside fabricators have registered complaints of employees coughing and of particulates present in the assembly area. IftarJtetofr . The only protective covering offered are gloves. No separate laundering is provided. . Fibers are visible on employes clothing and on assembly counter tops. . Fibrous waste falls into a container through holes in the counter during assembly A fan is focused on the seme area to cool employees. . Fibers could also be emitted during welding of the metal casing that encloses the catalytic converter assembly. . There are no restrictions on smoking, eating or drinking in the assembly area. . Bnployes are currently not receiving medical -:\<urs. (Labor Relations stated that employees have inquired when they wou*d :ece-ve tneir exams after viewing a report on asbestos on the T.V. program "60 Kinutes''. Required Action______ 1. Determination of the exposure level a) NI03H method b) Scanning Electron Microsoope Analy sis, (SEM) St-'.us" a) 2-L weeks for test results (12-73) b) 2-6 weeks for test results (12-78) Although the NJOS? fiber/ee level may be low, under SBi conditions, the count eeuid be 10001 and repre sent those fibers vnich are actually carcinogenic (i.e., fibers u.ess than 3 urn in length). EtBOO} 1575 SCF-FORD-1628 Required Action 2. Reoamznend the following! a) Protective clothing be provided. ~b) No smoking, eating or * drinking be allowed. c) A vacuum system for vaBte be installed. Statue 3. Implementation of a clear coat on the part. 3. Meeting scheduled for 11/15/78. Raybestos - Man hattan. Industrial Hygiene. Catalyst Engrg.. and VME were represented. Completion of Engineering Specification (12-78) . Submission of cost figures (12-78) . Visit planned to facility (1-79) h, Elimination of asbestos material. k. Engine Engineering is assessing substitutes. (However, does not appear feasible at this time) Vehicle Materials Engineering November, 1978