Document NegkoYmX9y0kNJp8JJaGp79Vg

>'tK E. I. DU PONT DE NEMOURS & COMPANY 256 VANDERPOOL STREET NEWARK, NEW JERSEY Stria! No ^-71-17 Copy No* 18 RETURN TO JACKSON LABORATORY FILE ROOM \ \ y \ \- t NEWARK PLANT PIGMENT COLOR RESEARCH REPORT LEAD MELTING AND OVERFLOW SYSTEM Period Covered JUNE 1969 - JUNE 1971 FILE: DATE: 121 6-30-71 NJ 14071 m 71-17 Copy No. 18 1. Numerical Pile 2. Research Office Pile 121 3. Newark Library Pile 121 4. M.Hunt,Pigments, Wilmington 5 W. S. S truve/J.Jackson/A.R.Hanke 6. R.H.Wetzel,Newport (cir. and Pile) 7. B.E. Jaife/E.F.Klenke/B.H. Perkins/Library 8* pJ.Monahan, Newark {Vital Records) 9. N.G.Fisher,Central Research Dept./Wilmington 10. Newark Library - for Central Report Index 11. Newark Library - for Central Report Index 12. W. J.McClure/R.H.Akins 13. R.Gedd/R.B .Horton 14. B.C.Hertz 15. Extra 16. Extra 17. Extra 18. Extra 19. Extra NEWARK PLANT PIGMENT COLOR RESEARCH REPORT TITLE LEAD MELTING AND OVERFLOW SYSTEM PERIOD COVERED! JUNE 1969 - qe.ikSUBMITTED BY: B. c. h eJr t z E 1971 Date Submitted: 6/26/71 APPROVED BY: Date Released: 6/30/71 ABSTRACT: This report covers the design and installation of two electric lead melting furnaces and a heated molten lead overflow system in the lead nitrate area of Hie Newark Plant. These facilities have replaced the single oil fired lead furnace and the manual ladling troughs. K JACKSON HIE DUP050082763 INTRODUCTION Newark melts * 14,000,000 pounds of lead annually for the subsequent manufacture of lead nitrate. The area used an oil fired furnace which consisted of a cast iron pot supported on a masonry fire box. An oil flame was distributed through a brick arch constructed below the pot in order to provide uniform heating and to minimize local hot spots. The combination of external heating and the four ton lead load stressing the pot resulted in frequent pot failure. With failure the molten metal would seep down onto the brick arch and react with the refractory destroying it. A four to six day shut down would be needed to repair the damage. During this shutdown period no chrome yellows or Molybdate oranges could be made, after the lead nitrate in storage was consumed. The lead, once molten, was hand ladled into an open metal trough. The operator manually transferred 20,000 pounds of molten lead per shift at instantaneous lift rates of 700 pounds per hour. Be was constantly exposed to the 1100*p. heat of the pot and the danger of spillage of the molten liquid. Modernization and improvements of these facilities were investigated, and alternate methods selected and installed. PATENT STATUS None -1- DUP050082764 SUMMARY AND CONCLUSIONS The oil fired furnace was an unreliable piece of equipment. Past experience indicated a pot life expectancy of approximately 10.000,000 pounds of melted lead, or less than a single year's use (See APPENDIX). Internal and external gas fired, internal resistance and induct ion furnaces were investigated as replacements. The lowest initial costs favored replacement with internal resistance heating units, and the lowest operating cost favored replacement with internal gas fired units. The relative simplicity of the electric resistance unit vs. the gas fired unit, as well as its ease of maintenance and ability to perform on a limited basis with the burnout of several elements, outweigh the added energy and heating element replacement cost. Size and space limitations had precluded the possibility of constructing a second oil fired furnace in the lead shop area. The electric resistance and the internal gas fired furnaces could be designed to fit two units of the capacity of the oil fired furnace into the area. Two electric resistance units were recommended as replacements and were installed in March of 1971* Startup of the first furnace was uneventful. The second furnace is serving as an installed spare. A heated overflow system was designed and installed in November of 1969 as a demonstration prototype unit. The system was successful and remained in service for a year and a half, until the new furnaces were installed. At this time another heated overflow was designed and installed which overcame some deficiencies in the prototype unit. This system was started up in March, 1971 and has been operating satisfactorily. -2- DUP050082765 IN 8/35 1/37 4/37 2/38 4/43 12/45 5/47 4/48 12/48 4/50 12/50 7/51 5/51 11/52 9/53 3/54 5/55 11/55 2/58 7/58 9/60 7/62 1/64 6/64 12/65 T.RAD POP REPLACEMENT CYCLES MONTHS OPERATED 17 3 10 67 27 17 12 7 16 9 4 1 18 10 7 13 6 27 5 26 22 18 4.5 18 14 *- 3 - APPENDIX LEAD MELTED <*> 7.9 .9 3.0 24.3 9.7 10.3 10.6 4.9 10-0 10.2 3.8 1.4 18.4 11.1 6,3 13.0 7.8 25.5 4.2 23.6 18.7 15.9 4.0 15.9 DU P050082766 Lead Pot Replacement cycles MONTHS IN OPERATED 2/67 11 1/68 6 7/68 ii 6/64 4 10/69 7 Appendix (Cent1d) LEAD MELTED (MM.#) - 10.3 -4 - DUP050082767 ECONOMIC DATA External Induction induction Internal Gas Fired Htd Htd Internal Resistance Unit Commercial Du Pont Gas Fired Htd ID (2) (3) (4) (4) Operating Unit $9,045 $60,000 $10,000 $7,195 $5,900 Standby unit 9,045 60,000 10,000 7,195 5,900 Equipment Installa tion 18,090 120,000 18,000 17,960 11,800 Service Facilities Gas 6,600 Electric . TOTAL 42,780 10.000 250,000 - 10,000 46,000 6,600 -- 38,900 10.000 33,600 Ooeratincr Costs Based on cold Standby Energy $3,500 $6,180 $6,180 $3,500 Maintenance 1,300 4,800 3,000 1,010 Deprec 6% 3.560 15,000 2,750 2,330 TOTAL 7,360 25,980 11,930 6,840 $4,500 2,000 2,020 8,520 Gross ROI-% 12.6 0 0 31.5 Base Investment cost for current appraisal study only not for project preparation. 1. American Gas Furnace company - Quote 2. inductotherm Company - Verbal quote 3. Chambers Works Design - John Branscome estimate 4. C. M. Kemp company - Quote -5 - DUP050082768 Design Data; Induction Heating - 120 watts per foot of pipe at 60 cycle 110 volts to beat pipe to 450c using one turn per inch and three inches of magnesium Oxide insulation* - 3 KVA transformer "Buck or Boost Transformer" GE model #9T5M113 2 volts per foot of pipe at 60 amps* RECOMMENDATIONS The high heat loss from the open top of the lead pot would favor installation of an insulated cover. This would minimize holding losses and reduce energy costs. Molten lead should be ladled from the operating furnace into the standby furnace to a level of four inches. This would cover the heating elements and facilitate an emergency startup of the second unit. REFERENCESi 1. Drawing #d-39820, The C. M. Kemp Mfg* Co. 2. Letter from J. W, McNees, E.S.D. to Barry Hertz dated July 28, 1970. 3. Project No. 7820 -6 DUP050082769