Document NeaeGkqv4bXqN6Rk5OaQRNwGQ
FILE NAME Quigley QUIG
DATE 1973 Nov 15 DOC QUIG031
DOCUMENT DESCRIPTION Memo - Phasing out Asbestos
!
To
Mr. D. R. Thacker
November 15 1973
From
J. J. Marino
Subject Phasing Out Asbestos Products
ze
As a basis for deciding when we should discontinue production of asbestos
based products I have reviewed the sales reports from January 1972 to
The attached graph
Fig
I
Asbestos Product
Sales vs.
asbestos
present
Sales
shows the monthly sales of Panelag and Insulag as well as the asbestos
substitutes Panelex Insulag A
The Panelex series which include
Panelex Panelex T and Panelcote appear to be
of Panelag
Insulag A however does not appear
gaining
to show
acceptance in place any significant in-
roads into the Insulag sales
The reason for this may be that we have not
made any tion
great
attempt
to
switch our
to customers
the asbestos modifica-
Fig II Insulag
shows our and their
Accumulated Average Consumptioonf Abestos
combined total Although Insulag has higher
for
net
has a lower percent of asbestos than Panelag 9.7 vs. 20
This
Panelag
sales it
is why the
asbestos consumption is not appreciably higher
the accumulate average of tonnage per month of
in Insulag asbestos is
Please note that in a definite down
trend
In 1972
Old Bridge In
the average 1973 the 10
was 15.8 tons month average
per month asbestos consumption at year is 13.9 tons per month
In addition
consumes an
asbestos is
to Panelag and Insulag as consumers of asbestos Insulag BOF
average of 1.5 tons per month of asbestos
type T
The type
used in Insulag and Panelag
D
As of Nov. storage at cancelled T
9 1973 69 Old Bridge
tons of A rail
type D car of
For Insulag BOF type D
1
asbestos asbestos asbestos
and D
can
no type T asbestos is
was an order be used as a
and just
substitute
in
to
Based on a monthly consumption of 15.4 tons 13.9 + 1.5 it is anticipated that
*
we can fill orders for Insulag Panelag and Insulag BOF for the next 4 1/2
months or until March 31 1974
It appears that we have three choices on how to phase out of the asbestos
based products
1
Produce products as ordered with a off date of March 31 1974
2 Have a production campaign where all the asbestos is consumed and the
products put into storage
Shipments to continue until March 31 1974
3 Determine a production cut date at which time all remaining asbestos will
be consumed in production of products The products put into storage for
shipments made until March 31 1974
Ex 2
7/25/85 7/25/85 >fl
09 12811
The only reason for choices 2 and 3 is the desire to stop the use of asbestos
at Old Bridge as soon as possible Choice 2 is impracticable due to the un-
on availability of storage space and raw materials at Old Bridge Projecting the
consumption our average sales we would have to produce 346 tons of Insulag
141 tons of Panelag and 44 tons of Insulag BOF
Choice 3 offers a compromise
which is recommended
The recommendation is as follows
ery
Produce Insulag Panelag and Insulag BOF using asbestos D as ordered until
. January 15 1974.
At that time enter into a final campaign and consume all the
asbestos and produce products to be placed into storage In the meantime notify our customers that after March 31 1974 all orders for Insulag Panelag and Insulag BOF will be filled with the asbestos substitutes Panelcote for Panelag
Insulag A for Insulag and the asbestos
yet be developed The final campaign Panelag and Insulag respectively
substitute for Insulag BOF which should be 3 of Insulag BOF
In a meeting with Corporate Safety on November 9 1973 tions were set forth in light of our overall situation
the following recommenda-
described above
If we stop production of following is recommended
asbestos based products by Corporate Safety
by
April
31
1974
then the
1 Schedule cleanups of production area after final production to rid area
of asbestos
2
Discard all wastes
3 On all bags containing asbestos materials appropriate labeling should be
present
The label on the asbestos bag would be adequate
4 Request Mr. Vines to arrange for physicals for Old Bridge employees in the
last quarter of 1974.
These physicals to take form of a mobile ray unit
to conduct chest rays and a lung function study
If we do not stop by April 31 1974 then Corporate Safety feels we should
meet with them to evaluate possible courses of action to assure ourselves all
;
applicable OSHA requirements are being adhered to
.
The above should be require any further
sufficient for a final decision in information please let me know
this
matter
If you
~
) Milici
J. J. Marino
Encl
JJM
CC
Mr. L. Dreyling Mr. R. Galloway Mr. J. Major Mr. W. Herberger
| Dreyling Ex 7/25/857/25/85
:
Ad
no
10010
\ ~/
{ \y Y
\
f
Ponelex
_
Series.
seat og
wet M/gd
b0c0 Jooe 0004 Joso 1,060- 1,00 (+084 13,60 (460 19,00 i600 [Jeo iyco,
4
|
-
4
4
4
12813
FIg
Dreyling
Ex
Dreyling
7/25/85
DreylingDreyling Dreyling
|
7 a
AMAL
VARS
~=>
Lie
wuneas ETns) ls ~ 7 A=
-Trsvleg
>)
myer?
at epgf> e) ANA 09 12813
SOS
f/MENTHA,
|
12814
Amos
RwWARL
Lye?
se
L ~ TAMA MAL Pane
}Total 1973,
INAS
lag
1973
PoneleIsnseleg
Dreyling
-13.9
\
Thte,
Consu ;
28
mp
tion
oF
7
Asbestes
|
.
Aveging iad)
2 /oSVES
A
09 12814