Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
James Way Townhouses
Digitally signed by STEPHANIE
STEPHANIE TOUGAS
From:Stephanie Tougas, InspectorTOUGASDate: 2024.07.-024'060 '
08:40:12
Thru:Andrew Spejewski, Inspector
To:File
I. Facility Information
A. Facility Name:James Way Townhouses
B. Facility Location: 60 City Depot Road
Charlton, MA 01507
C. Facility Contacts: Jay Gadoury, Owner
J Jill Development LLC
Jayg.builds.homes@gmail.com
D. NPDES ID No (s).: MAR1004RG
II. Background Information
A. Date(s) of inspection: June 27, 2024
B. Weather Conditions: clear, 85 degrees F, rain day prior
C. US EPA Representative(s):
Stephanie Tougas
Andrew Spejewski
D. State / Local Representative(s):
None
ED_019088A_00020226-00001
E. Federally Enforceable Requirements Covered During the Inspection:
Construction General Permit
F. Previous Enforcement Actions:
Expedited Settlement Agreement (Docket # CWA-01-2024-0004) for failure
to obtain permit coverage for stormwater discharges.
III. Type and Purpose of Inspection
Evaluation
IV. Facility Description
The entrance to the development is off City Depot Road / RT-31 on the east side. A stream
runs south across the site. The area between the road and the stream is fairly flat; it has
several completed houses with grass lawns and no exposed soil at the time of the
inspection.
East of the stream, the site slopes up steeply to the east. Two houses were near complete
at the foot of the slope.
The north section of the slope was clear of trees and stumps with portions of exposed
earth,. The slope behind the complete houses was hydroseeded with visible vegetation
growth or wood mulch. Where the slope starts to level out, there is a 50-100 foot buffer
of undisturbed vegetation before the edge of the property line along the east perimeter.
The stream flows from the north, under the paved site entrance southwardly for
approximately 0.3 miles until it meets Cady Brook, which is a tributary of the Quinebaug
River.
V. Inspection
I previously arranged this inspection with Mr. Gadoury the week prior. Mr. Gadoury
granted us permission to access and said he would meet us on site.
We arrived at approximately 12:30 PM.
A. Opening Conference
I presented my credentials and explained the purpose of the inspection. I explained that
we had received continued concerns about the site from the Conservation Commission
regarding sediment still being discharged into the wetlands as well as the detention basin
being at capacity. Mr. Gadoury expressed frustration over what he described as
conflicting inspection reports from the Conservation Commission contractors and said he
was trying to control the flow on the site.
2
ED_019088A_00020226-00002
B. Facility Tour
We began the tour by heading counterclockwise, upslope. Mr. Gadoury pointed out the
swale, saying it was working well at controlling water flow on site. Mr. Gadoury pointed
to an inlet at the base of the swale and said it discharged into the detention pond south of
it. We continued walking upslope, and Mr. Gadoury pointed out the area beyond the silt
fence towards the wetland area where EcoTec, Inc. seeded that was now vegetated. We
observed some areas along the silt fence where the wattles were being breached by
sediment, and we conveyed to Mr. Gadoury that these needed to be reinforced. We came
to a portion of the slope along the swale that was not sufficiently stabilized. Mr. Gadoury
said that they plan to remove a lot of this sediment in the coming weeks and are bringing
the grade down by a couple of feet when they build the access road. We explained that
portions of slopes that are not being worked on for 2 weeks or more need to be stabilized.
We continued upslope. We discussed the large, exposed slope that dominates the back
portion of the site. Mr. Gadoury said that he had this slope hydroseeded last winter, but
that the hydroseed would not take due to it being glacial till. We suggested that he use
mulch to stabilize it, and Mr. Gadoury claimed that the Conservation Commission told
him that he could not mulch it. We continued walking upslope and south, walking along
another swale. Inspector Spejewski pointed out that parts of this swale were starting to
fill with sediment and needed to be cleaned out. Inspector Spejewski also suggested that
check dams be installed to dissipate and slow the flow. Mr. Gadoury claimed that he had
installed check dams in this swale, but that the Conservation Commission asked him to
remove the check dams.
We stood at the top of the section of the slope behind the completed house that was
successfully hydroseeded and had portions stabilized by mulch. Mr. Gadoury said that
this slope is not at the final grade and the plan is to cut it down a few more feet.
We walked downslope towards the detention basin at the southeast section of the site.
There was a large, long basin with a smaller pit to the south. Mr. Gadoury said that the
slopes of the basin had been vegetated but then he was instructed to remove the
vegetation by the Conservation Commission. Mr. Gadoury showed us photos of the basin
from the inspection reports written by the Conservation Commission. Inspector
Spejewski said that the photos showed the basin looking very full and that the basin
appeared to not be doing its job at detaining since when the basin is full, the water runs
right out.
The pit to the south had no outlet or control structures with bare dirt walls. Mr. Gadoury
said he had just started rebuilding it and it would include perforated pipe discharging to
the southwest.
We walked behind the basin, closer towards the wetland area and noted an outlet from the
pond discharging water. Mr. Gadoury said that there had been sediment discharged into
this area, but he had since removed it.
3
ED_019088A_00020226-00003
B. Closing Conference
Mr. Gadoury continued to express frustration saying he was receiving conflicting
instructions on how to manage the site and that he was not doing anything wrong.
Inspector Spejewski reiterated that even if the plan is to remove a large portion of the
sediment from the slopes that are not stabilized in a few weeks, the permit says that the
slopes need to be stabilized if not worked on for two weeks or more. We told Mr.
Gadoury that we would have a meeting with the town and would be in touch with a copy
of the inspection report. Mr. Gadoury gave us copies of the inspection reports from the
conservation commission as well as a site plans. We observed two workers hydroseeding
the area around the detention basin as we left.
We thanked Mr. Gadoury for his time and departed at 1:15 PM.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
Picture List:
IMG_0011.JPG-swale along southwest part of site / future access road
IMG 0012.JPG-inlet at bottom of swale
IMG_0013.JPG-slope that could use more stabilization
IMG_0014.JPG-gulleys in large slope
IMG 0015.JPG-sediment accumulation over the wattles
IMG_0016.JPG-looking downslope at future access road
IMG_0017.JPG - - area with sediment accumulation and silt fences needing attention
IMG_0018.JPG-swale along back side of the site above the large slopes
IMG_0019.JPG-area of slope with hydroseed behind completed home
IMG 0020.JPG-swale with water / sediment accumulation
IMG 0021.JPG area in swale that needs to be cleaned out
IMG_0022.JPG-swale leading down to detention basin
IMG 0023.JPG-detention basin
IMG_0024.JPG-water discharge through outlet from basin into wetland area
IMG 0025.JPG-basin with inlet
IMG_0026.JPG-silt fence downslope of basin needing attention
IMG_0027.JPG - - same photo as IMG_0026.JPG
IMG_0028.JPG-silt fence needing attention
*