Document NeVneXY8vL7q0m2wzQE9o4mNw
INTER-C^irs MEMORANDUM,
RESEARCH
Toe 5*. M. Stuspf 'toms ' J. F. O'Rourke
00T4
Dt*s Hay 19, 1967
V! iobjocfe Complaint Investigation at^the thion Carbide Job - Mjjt2.j njir.J , )i i u i
On May 10, the writer visited the Union Carbide job in Harris Plains, H. J., because
Sprayed Fireproofing Contractors had requested my attendance for a job meeting.
Heither Don McFhee or Joe Hardy of Sprayed Fireproofing showed, up at the meeting and
I visited with Mr. William Blanchard, Jr., sen of the general contractor and Mike,
job superintendent. .
,,
The steel deck supplied to the job was supplied by Wheeling Corrugating Company. It is their standard IV steel roof deck and it had a white vinyl primer applied tor the undersurface of the deck. Eecuase of the height, it was difficult to analyte
the surface sheen on the underside, but it did not appear to be of any higher gloss than typical roof decks supplied on jobs. In fact in areas wherein fiber was not being applied, they had already been spray painted with a white latex paint which seemed to cover real well.
From just looking at the areas, it is the writer's honest opinion that perhaps the greatest problem may have been freezing during application since the delaminaticn occurred clean at the bond line with no residual fiber remaining on the underside of the deck. I honestly don't feel that the presence of adhesive would have made that much difference from what I saw on the job. Obviously, the lack of adhesive and the sheen of the vinyl primer surface may have contributed to the failure, but the writer really feels the main problem was with freezing which may have generated a lock of bond at the time of application or freezing of the applied material which when deflected'by walking on the roof, may have severed the bond in sheets.
I explained this to the general contractors and all they want is to satisfy the concern of Union Carbide. Union Carbide wants assurance that when the material is resprayed, that there will not be problems of further delaminaticn.
I suggested that Sprayed Fireproofing Contractors arrange with the general con tractor for a scaffold so that the areas can be checked. Perhaps they may vant to run some bond strength tests and I offered the services of our Research Lab to work with Sprayed Fireproofing Contractors in order to determine the soundness of the material currently in place.
By cepy of this memo, I am asking Harry Gropp to have Allen Bessemer coordinate a
job inspection by the GLFCO contractor with the general contractor. We should know
what the dimensions of the bottom plane of the flute are as well as dimensions of
the crown of the flute so that we can fabricate some templets that can be used to
run some bond strength tests at random. Allen Bessemer should have Sprayed Fire
proofing Contractors send us up a section of the deck to get some measurements
so that we can get the templets fabricated now. Then when the Job inspection occurs,
we can go down with the hot wax and the templets and get a reference as to what the
bond strength characteristics would be. If we find in certain areas that the bond
strength of the ?7pe
to the deck is the same as the bond strength applied to the
beam, then we can pretty much eliminate the possibility that the surface paint finish
was contributing to this problem.
/
a