SAFETY AND HOUSEKEEPING ACTION COMMITTEE April 30, 1976 ACTION REQUEST
Over an extended period of time, you have all been involved in a concerted effort to control the installation and use of ball valves. This action request is intended to be a final followup to implementation of our applicable P-Bulletin (P-0134), to verify completion of actions required by previously committed dates (attached) and to solicit comments regarding the effectiveness of our current procedure.
In reviewing actions taken in your applicable areas, check your current status vs. the five key points of the P-Bulletin, as follows:
1. Instrument manifolds design.
2. Proper use in open-ended hazardous services.
3. Use of lockout devices where necessary.
4. Survey to insure open-ended connections are not plugged where removal of a plug could expose personnel to hazardous conditions.
5. Removal or replacement of ball valves in "low-use" services.
The SHAC committee interprets this bulletin to require ready availability within the unit of lockout devices capable of effectively locking ball valves in the desired position during maintenance. Examples of suitable lockout devices are available in several units in the plant and will be on display outside the Cafeteria about mid-May.
While questionnaires are attached to all copies of this request, I expect one answer from each area containing ball valves to be returned to me. The operating supervisor, or equivalent, will be responsible for completing the status report/questionnaire and will return it to me by May 14.
During the guest inspections scheduled in mid-June, inspectors wi11 be specifically looking for implementation of this procedure during the course of their inspection.
gk Attachments
Harold Lacy^^$
Chairman. Safety and Housekeeping Action Committee
SC 13405
LAM014626
CHECKING BALL VALVE HANDLES FOR COMPLIANCE WITH PLANT PROCEDURE P-0134 (12/15/75)
Area
Response
Dept 10
(MH)
Dept. 13-1**
Dept. 15-16
(SK)
Dept. 19-25-27
(RTH)
Dept. 24
(REW)
Dept. 33
(ARW)
Dept. 35
(TEK)
Dept. 44, 45, 46
(CMH)
Dept. 48
(LJP)Ph.
Dept. 50
(NLR)
Dept. 53
(TSH)
Distribution Dept. (JER)
Dept. 56
(JTS)
Central Shop,
Valve Shop,
Garage, and
Sandblast Fac.
(JMG)
Utilities Area
(JBC)
Labs 6 Environmental
Control
(ERH)
Labs
0. W. Cooper
E. R. Beaver
H. Epstein (Res. 2)
J. L. Slate
B. L. Jacob
W. G. Bauer
Plant Air
(REW)
Primary Waste
Water Treatment
(JBJ)
Construction
(GLC)
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Yes Yes
Yes
Yes Yes Yes Yes Yes Yes Yes
Yes Yes
Working
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Yes Yes
Yes
Yes Yes Yes Yes Yes Yes
Yes
Estimated Completion Date
1/30/76 3/31/76 6/76 3/15/76 1/19/76 2/1/76 6/1/76 3/1/76 6/76 6/7/76 1/30/76 6/1/76 1/15/76
Completed 12/31/75 1974 (reinspected 1/13/76)
1/22/76
No valves used in Lab 1205, 1206 2/15/76 1/20/76 1/12/76 MR0 issued to change out 12/29/75 Completed 1/20/76 1/19/76
1/19/76 No valves used in his area of 'capons i b i 1 i ty to-date
*3406
gk 1/27/76
LAM014627
BALL VALVE QUESTIONNAIRE 1. a. Have you completed replacement (where necessary) of ball valves to
fit current requirements? b. If not, what percentage of valves are now in compliance? ___________ c. Are you on target for completing installation as reported 1/27/76
(See attachment) ?
2. Approximately how many valves did you replace within the last year? a. Instrument manifolds . b. Process service .
3. a. Do you have lockout devices available in your unit? b. If so, briefly describe basic design. ____________________________________
c. If not, what are your plans for making these available?
k. Are bull plugs removed from open-ended lines where their use constitutes
a hazard?
5. What do you consider the most serious hazard you have corrected by changing ball valves to conform with our current standard?
6. By changing valve handle design, what difficulties have you encountered in determining ball valve positions, and how have you overcome them?
13407
LA MO 14628
Ball Valve Questionnaire
2- -
7. Any other comments regarding this program?
April 30, 1976
sc 13408
HL
V30/76
LAlV,0l4629
SAFETY AND HOUSEKEEPING ACTION COMMITTEE
5HHL
J. V. Cavender J. A. Glass
2R-21 0-22
C. C. Hebert H. M. Lacy
-- 2Z -- OA-3
G. L. Stacy J. M. Tissue
o-n 0-4
flCTION REQUEST
R. F. Arnold
SMD
"y < E. F. Gorcyca
: J. P. Irwin
1130 Y : SMD
S. E. Knipling
160
D. D. Kos
v 10D y
\YY G. L. Stacy
Y- 0-11
-f
G."FiesingWr'f^35LD
A. J. Bolton C. Jackson : J. F. Carl isle F. E. Grissom P. S. Gupton B . J. Harrell v J. P. Hickman W. E. Repschleger
ID K. H. Morel 1
0A-16
G. A. Orum
0A-5 0A-4
V. P. Osburn W. L. Riddick
OA-16
L. Schwab .
ID >:V- v E. M. Travis Y?
0A-16
P. K. Saunders
11
SS-15 2Z 1Z SS-29 1Z 1Z
-42 Mv'5?-
-' ,1 o fi'-
; L.`J. Povse-
560 i&T.*Ozarchuk '#M&'MP"22 'L' Roberts
J. L. Rasmussen .V:o-6A^;\r|E.;M::Steefe3lMPER
R- Rol ingsori
A. R. Wi Ison D. R. Wise Y; TY
330 -6
Charles Goode ^'Y^OA-18
' J. M. Eason YAv-
FD -
T. J. Shuff , 'VT. C. Singleton
W. A.' Wall : v:OA-19
G. D. Smith
J. E. Bersuder f'V;42D
; H.'L. Schroeder
OA-19
G. L. Tromblee :
R. J. Burkett ' 'l'
42D
C. E. Yoas ' . -v-.-> OA-19
J. C. Trube -
R. W. Ceyanes
42D
'. E. C. Makin :;j
G. V. Hanks . J. L. Kilfoy
. 42D PEL
: E. R. A1britton E. P. Baily
jmg :. G. L. Woffo.rd
2Z ,t
R. T. Eby 'V
R. V. Mullikin
.42 D
W. F. Bridenbaugh SS-18
R. J. Johle
2R-I
N. F. Broussard
SS-17
Bill Birdwell R. C. Martini
J. C. Cook
0-13
CED A. W. Kuehl
2-Z
CED
J. M. Gatewood
cd ;
sc
13404
E. D. Moore R. Medina
f
CED CED
T. A. Harper . ' C. C. Hebert J. H. Jackson
2PD 2Z 42D
L. W. Jones
42D
R. D. Rivero
2PD
T. F. Soruiell
2Z
LAM014625
/