Document NeDGMbG13BKNbm3kekoNb5rDD

lU-S'V-D MAR 2O'986 wluam L. McCLWM PATRICIA L. NORTON SECRETARY OFFICE OF AIR QUALITY AND NUCLEAR ENERGY March 13, 1986 CERTIFIED MAIL - RETURN RECEIPT REQUESTED P 669 936 930 GREG I. GASPERECZ ASSISTANT SECRETARY cc * <SH Pty1 Jci Mr. R. A. Conrad Plant Manager Vista Chemical Company P. 0. Box 605 Westlake, LA 70669 Dear Mr. Conrad: The Air Quality Division is in receipt of your 76.18 letter dated March 10, 1986 relating to a VCM release on February 28, 1986. Our mandate under La. R.S. 1089 I is to make a determination of preventability for each VCM release covered under 76.18. Accordingly we would appreciate a response to this letter 15 days after receipt. To help us with our determination, please supply the following information: - A sketch of the entire system involved, to include instrumentation, pumps, valves, vessels, etc. Please make specific reference to the VCM recovery system at the Shiploading Facility since our file information indicates this equipment to be activated carbon absortion beds, and - if possible tie in the pressuring up of the system with a copy of the PRC or PI chart reading, and - a copy of your unit supervisor's log book entry relating to this event, and - the size, material of construction, the manufacturer, and specification for the rupture disk protecting the VCM Product Loading Bauxite Dryer SRV, and a copy of your calculations attesting to the quantity of ^VCM released, and - a completed copy of your internal investigative report relative to this event. VVV G0G0172I3 MR QUALITY DIVISION P.O. BOX 4409ft - RATON ROUGE. LOUISIANA 70RCW PHONE (5fl4U42-1 206 Mr. R. A. Conrad March 13, 1986 Page Two Thank you for your cooperation in this matter. questions, please call. Sincerely Should there be WHD:aa File: 12.40.5 Willvatff'H. Davis Chief, LESHAP Unit WVV OOOOl