Document NeBvbr6KaZnXLp0XBbjV5DM3b
Company! DOW CHEMICAL Process: POLY-B
Node: 19 Page: 1
Node: 19 D-2006 TO DEGASSER
rameter: Flow
Intention:
GUIDEWORDjDEVIATIONj POSSIBLE CAUSES |
CONSEQUENCES
| RECOMMENDATIONS |BY
No
No Flow INSTRUMENT FAIL. FUSE P-2012
EVALUATE PUMP
GC
PLUGGED LINE
HIGH TEMP.AND
AUTO-RESTART
OPERATION
HIGH % SOLIDS IN
PROBLEM
D--2001
OPERATOR TRAINING RF
PUMP TRIP.
QUALITY PROBLEMS
IN THE POST
REACTOR.
More
More Flow TEMP.CONTROL FAILURE.
BYPASS OPEN FLUSH LINE LEFT OPEN.
HIGH LEVEL IN D--2001.
REVIEW LINE SIZES BB INCL.BYPASS
OPERATOR TRAINING RF
EVALUATE TEMP.ELEMENT FAILURE MODE
GC
Reverse
Reverse Flow
NO CONSEQUENCES
AsWellAs
AsWellAs Flow
P-2005 TRIP BACK FLOW FROM R-2002 AND D-2003
SLURRY IN LINE PLUG LINE PRESSURE UP D-2001
EVALUATE CHECK VALVE IN LINE TO R-2002 FROM P-2005.
GC
EVALUATE PUMP AUTO RESTART.
GC
EVALUATE CHECK
GC
VALVE IN LINE
PRO-41801.
(TO D-2003)
H-----------------------------(.-------------------------- --|----------- -------------------------------------- t--------------------------------------- 1--------------------------------------------)------------ i-
00 ^ 121130
CONFrDFNT.TA("
Coni^any: DOW CHEMICAL Process: POLY-B
Node: 19 Page: 2
Node: 19 D-2006 TO DEGASSER
rameter: Pressure
Intention: WITHIN PIPE SPEC. "E"
GUIDEWORD|DEVIATION| POSSIBLE CAUSES |
CONSEQUENCES
| RECOMMENDATIONS | BY
More
Higher
HIGH D-2006 PRESS PRODUCT SPILL DUE EVALUATE
Pressure
TO EQUIPMENT
POTENTIAL OF PUMP
FAILURE.
TO EXCEED PIPE
RATING.
+-------------- +-------------- +--------------------------- +-----------------------------+--------------------------- +
DO A 121134 CONFIDENTIAL