Document NdG2w5NpMM3n52NN7xndzd0Q
( Anniston
J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee
General Offices
H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard W. K. Johnson C. F. Luecke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
COMPANY CONFIDENTIAL
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
APRIL 1971
Specialty Products Test results show that Aroclor from Cumene injection Biphenyl produced in the Polyphenyl Pilot Unit is essentially equivalent in quality to lab synthesized Aroclor 1242 produced from acetone promoted Biphenyl. The Polyphenyl Tubular Unit Cumene Injection Project package was transmitted to Maintenance 12 April 1971. Materials and equipment are on order and will be installed in May '71. The Tentative Process Amendment was issued for approval.
South Second St.
AFE 3718 to remelt and distill Santowax C stored in the pond was revised to $20M expense - zero capital and received verbal approval. The installation will be completed 3 May '71.
A progress report (No. 2 - 009-1104 April 27, 1971) was issued outlining the steps needed to produce low color A-5460. Revised design and costs should be completed in June '71.
P. 0. DeGarmo
Verbal approval was received to order major equipment on Project 3776, Standby Propane Fuel System. All major equip ment items are on order with the exception of the air conpressor.
Other Locat ions
A. H. Forsten Alvin, Texas
D. W. Jackson W.G.K.
W. L. Smull Texas City
Both the Santowax gear meter and the total hydrogen meter for HB-40 were removed from service because of malfunctions. Failure was traced to a ruptured diaphragm in the hydrogen meter due to "surging"; an orifice and a surge tank will be installed to correct the problem. Failure of the Santowax meter was due to scoring of the gear shafts by Raney nickel catalyst which was inadvertently blown back down the line. Both meters have been returned to vendors for repair and re calibration.
The North Plant group (W. E. Voss) assumed responsibility for
manufacturing representation oh the Santowax still expansion,
CEA 2472.
; -------------------
DSW 551605
|iN - 306
!
CONFIDENTIAL INFORMATION
-
"This document contains confidential information which is tha proparty of Monsanto Company. Only those portions of the document relevant to a
duly authorized individual's need to know may be excerpted for him. The report, must not be sent outside the Company without written approval and
the authorized recipient is accountable for its safe keeping, excerpting or otherwise disclosing of its contents and for its proper disposal. The docu>
ment remains the property of Monsanto Company and shall be returned within two months to its author, except upon special authorization to hold
STLCOPCB4090022
2
A PR&D report detailing PCB removal by carbon adsorption was issued on 4- 15-71. Studies on PCB removal by the addition of a powdered adsorbent followed by flocculation-clarification removal of solids are continuing. A revised work plan covering powdered carbon addition will be issued by 5- 10-71.
Ag Division
Work was initiated on a scope and estimate for recycle of still residue to improve Parathion yield and residue handling.
PR&D studies on the recycle of filtered organic residue from 96% chlorinated Ethyl Intermediate into the next thio acid charge were initiated on 4-21-71. This work will complement studies completed earlier on Methyl Intermediate.
Maintenance began installation on the experimental cone tank project to improve Parathion recovery.
Samples of Muriatic Acid from the chlorinator drowning jets (during Ethyl run) were sent to Ag Research for analysis of impurities. Clean-up of the HC1 to produce saleable Muriatic Acid will be investigated when impurities are known.
New chlorine control valves have been installed as part of Project 3713; Optimize Chlorine Input to the Niran Chlorinators. Controller settings necessary to optimize feed rates will be made by 5-7-71.
Quality Control
The plant quality score was 83.4, down 6.1 from March, with a YTD score of 88.7.
Pollution Control
April Aroclor losses were the lowest recorded since the Aroclor clean-up
program began. The average daily loss was 0.65 #/day. The biological
samples which were collected in March
'"
-q% couplete.
/dp
DSW 551606
STLCOPCB4090023
3
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O. Kemp
Complaint Report
Quality Number PL-10-P-71
Material A-5460
Customer United Resin
Reason Black specks
YTD Quality Complaints/100 Shipments 0.33 Target 0.20
DSW 551607 STLCOPCB4090024
1971 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
c
XfQtI)
Lid a
<a
>id< a
e0
r0H
<C3n
f0)t
CO
+ouJ zo>
Q(oU
EXISTING PRODUCT
70
TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS 60
MAJOR PROJECT SUPPORT 50
PROCESS CONTROL IMPROVEMENT
40
PROJECT DESIGN PROCESS MAINTENANCE
30 20 10 10
0
TECHNOLOGY AND TECHNICAL SUPPORT
15 5
TECHNICAL MANPOWER
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
10 0
J___ I_ _ _ _ 1
1icd3 f0t)
4idl a
I 11_ _ _ _ I_ _ _ _ 1___ I___ L_--I_ _ _ 1
M <ft
id a
c0 r0H
`<t3n
f(Ut
CO ..
4oU-*
z>o
o <u
n
DSW 551608
STLCOPCB4090025
4
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Personnel Development 1. E. G. Wright attended E.P.A. hearings on Alabama Water Quality
Criteria in Montgomery, April 6 and 7. 2. Don Dudley transferred from the Maintenance Department to the
group, 4/30/71.
DSW 551609
STLCOPCB4090026
1
Please add my name to the distribution of your monthly report.
W. JL. Smull
i DSW 551610
STLCOPCB4090027