Document NXm6OKLd2gRvn35MX7y03xQR
i
VCM PERSONNEL MONITORING PROGRAM
I. PURPOSE
Compliance with OSHA Regulation. 29 CFR 1910.1017(d).
H. ASSIGNMENT OF PRIORITY
All facets of this program that are necessary to achieve and maintain compliance with the referenced regulation shall receive priority over competing uses for manpower and equipment which are not essential to compliance with other regulations. If it becomes necessary to choose between, or among, this and other regulations, the Environmental Engineers and OSHA Coordinator shall do so.
If obstacles arise which are beyond the scope of responsibility of the above, they shall pursue disposition of the matter with the appropriate managers.
Ill. ASSIGNMENT OF RESPONSIBILITIES^
A. Establish list of persons to be monitored. Update as needed.
R. L. Martin
B. Schedule samples and .technicians. Publish schedules.
C. H. Horrell
C. Conduct sampling.
C. H. Horrell Operating Departments
D. Sample analyses.
W. K. Smith
E. Provide written procedures. Update as needed.
1. Laboratory 2. Data processing 3. Sample collection
W. K. Smith J. W. Robben J. D. Fannin
F. Establish and maintain the necessary inventory of equipment with a reasonable allowance for contingencies.
W. K. Smith C. H. Horrell
G. Provide necessary manpower.
S. S. Michels H. E. Barrett H. H. Striby
H. Verify accuracy of method.
1. Analysis 2. Sample collection 3. Coordinate
W. K. Smith . J. D. Fannin P. E. Mosser
NGC38110
III. ASSIGNMENT OF RESPONSIBILITIES (cont......... )
1. Maintain official files.
. R. L. Martin
IV. APPROVAL -
The assignments listed are basically in existence but may not have been committed to writing. This should be done to insure proper coordination of the monitoring program.
To permit adequate review, this listing will be offered for approval at the VCM Control Team. Meeting on 3/24/76.
sjm
cc: VCM Control Team (Louisville) P. E# Mosser W. K. Smith
. R. R. Taylor
J. D. Fannin
NGC38111