Document NNmN4r7VYpxbB4knvVKeVgDQ
B-l
EXHIBIT B
PCB CONTENT MEASUREMENTS
------------------5H------------------
DUPLICATE-samples
I UMC Capaoltor Plant Bridgeport, Ct. Duplicate samples of approximately one gallon each were taken by EPA Region I personnel. In January 1976, and one set left With us. After mixing thoroughly, I decanted one set Into pre-rinsed one-liter bottles, and sent them to Baron Consulting Co., a laboratory In Milford, Ct. The remainder, still In the bottles supplied by EPA, were sent to WOodson-Tenent, a laboratory in Memphis, Tennessee. The comparative results are tabulated as follows! (Note! The dual numbers for Baron'Consulting for Sample 1 represent a duplicate run.)
Sample Identification
RESULTS PPB
Baron
Woodson . Regional
Consulting ' Tenent
EeP.As
1 Incoming water 1/28/76
0.65/0.58 0.075
0.5
2 Effluent cooling water 1/28/76
1.95
10.51
13.
3 Effluent eoollng water 1/29/76
4 Effluent Sanitary.water 1/28/76
1.71
1.24
0.97 . 62.68
17. 20..
5 Effiuent Sanitary water 1/29/76
6 Effluent Air Compressor Cooling water 1/29/76
8.5
no sample
348.57
no sample
89. 8.3
XX UMC Capaoltor Plant, Totowa, N.J. Duplicate samples were taken by EPA Region XI personnel In February 1976, and one set left with us. The retained sample was sent to Baron Consulting Co. The comparative results are as follows!
Baron Consulting EPA Region II
Influent compositet Effluent composite: Orab sample from waste
collection tank:
None detected 67. ppb
12.6 ppm
0.95 PPb 9.90 ppb 16.2 ppm
This sample contained an extraneous unidentified peak, not PCB.
HONS 0 2 9 8 0 6
EXHIBIT
\
page 2
III City of Bridgeport) Ct. Waste Water Treatment Plant. Samples were taken In May 1976 by EPA Region I personnel. We did not receive a sample, but the following results were reported to me by Mr. Daniel Moon of EPA Region I:
Water Influent to treatment plant Water effluent from treatment plant
1.42 ppb 11.3 ppb
XV These are grab samples wh'leh I took on September 7, and were taken by holding the pre-rlnsed bottles In the stream flow and allowing them to fill simultaneouslyt
Sample ' Identification
RESULTS PPB ___________ Saron Consulting Galbraith Labs Inc.
1, Bpt. Influent Tap Water 9/7/76
Hone detected PP*>
15 Aroolor 1016 3 Aroolor 1254
2. Bpt. Effluent (rat'd to well) 9/7/76
Non? detected
PPb `
16 Aroolor 1016 4 Aroolor 1254
NRC/h
l
HONS 029807