Document NNkKGKgYqZqm03QdqrXLBzV18
4
Operation Report Dept. 246 - Aroclor May - 1965
PRODUCTION (Current Month)
Scheduled -
Actual $ of Schedule -
2,480,000#
2,465,335# 99.5$
PRODUCTION SUMMARY (Year to Date)
Aroclor 1242 1248 1254 1260 1262
Current Month 898,'430#'"
555,465
387,103 605,377
18,960
2,405,335#
Year to Date
4,147,955# 3,032,634 2,898,273 2,272,098
54,780
12,405,750#
Average Monthly Production - 2,481,150#
Availabilities
Repair- 99.60$
Process - 93.14$
Other - 91.26$
Total - 84.
Causes for Major Outages
Repair
3 Hrs. (.40$)
Repairs to No. 2 still pump
Process
17 Hrs. (2.28$)
Plugged furnace coil on No. 2 still.
9 Hrs. (1.21$)
Plugged off-gas line on No. 4 chlorinator.
8 Hrs. (1.08$)
Cleaning No. 1 still condenser.
8 Hrs. (1.08$)
Water side of condenser plugged on No. 2 still condenser.
9 Hrs. (5 Hrs.) Operating error prolonged cycle on three
(1.21$)
chlorinator cycles.
(3 Hrs.) Cleaning out bottom of No. 4 chlorinator.
(l Hr.)
Draining scrubbers on No. 1 still vacuum system.
Total Process Outages - 51 Hrs. (6.85$)
Other
39 Hrs. (5.24$)
26 Hrs.
(3.49$)
Insufficient supply of chlorine Changing products.
Total Other Outages - 65 Hrs. (8.74$)
DSW 296453
STLCOPCB4066397
Dept. 246
2
YIELDS
Standard
Actual
YTD
$ Theory on Biphenyl -
95.50$
99.02$
98.73$
Quality
The thermal-chemical stabilities on 1242 Aroclor were higher than usual this month. Two lots were produced with 7 C stabilities of O.56 ppm and 0.68 ppm. The material with the .68 ppm stability was stored in an underground storage tank.
The overall improvement in 1242 stability in 1965 have resulted from the new all aluminum storage tanks and using the distillate at the end of each 1242 run for non-electrical grade material.
The Process Research Group and Technical Services ran a designed experi ment on variables at the chlorination step using the GLC method to measure the quality of Aroclor in the finished chlorinator batches. Excellent quality material was produced in Nos. 2 and 3 chlorinators. Investigation is continuing to determine what factor causes the differ ent quality material in the different chlorinators.
We have been informed by Sales that power factor is becoming increasingly important especially in the foreign market. Foreign competition and MCL produce material with a power factor 10$ of the power factor of WGK material. Since the power factor is reduced easily by earth treatment, this part of our process will be emphasized to insure that the power factor of our material is the lowest possible with existing equipment.
Operations
The HC1 off-gas line back pressure continued to be higher than normal this month. The back pressure was not high enough to significantly affect operations. The off-gas line will be cleaned when inventories are high enough to prevent missing shipments.
The experimental horizontal pump on No. 2 still will be tested next month after the inlet piping has been modified.
The nuclear density gauge on No. 4 chlorinator was not demonstrated by TSD due to higher priority work.
Stock Position
Aroclor
1st of Mo.
Last of Mo.
Whse. Stock Dept. Stock -
1,594,780# 860,081#
2,454,861#
1,458,395# 1,031,311#
2,489,706#
ghw
D. E. Harris
DSW 296454
STLCOPCB4066398