Document NNEnKkNkmpGzRqLr7XvOo0O4V

SUBJECT MONITORING SUMMARY REPORT, JULY 1982 ^ Included in this report are the results of monitoring for: Vinyl Chloride Acrylonitrile Lead Highlights The overall plant average of personnel monitoring for VCM was .07 PPM. The OSHA standard for VCM is not to exceed 1 PPM TWA over 8 hours. No samples exceeded the standard. The overall plant average of personnel monitoring for acrylonitrile was .07 PPM. The OSHA standard for acrylonitrile is not to exceed 2 PPM TWA over 8 hours. No samples exceeded the standard. One sample to evaluate airborne lead exposure was collected. The 17.43x<g/ M3 result was well below the OSHA standard of not to exceed 50/(g/M3 The reduced number of personnel monitoring samples and the reduced percent of time 'hat gas chromatographs were in operation reflects the shut down of the plant during .he 4th of July week. A one time only additional catagory of "PERCENT DOWN DUE TO JULY 4 SHUT DOWN" has been added to gas chromatograph operating time section to account for this time. Please note that the gas chromatograph from Building 111 (shut down) has been moved to Bldg. 127. Results will no longer be reported for Bldg. 111. Per request of T. S. Bialke, the number of dual tubes being used to check for break through in VCM monitoring has been increased to a minimum of 50%. 80% of July's VCM samples were run with dual tubes. No breakthrough was experienced. The data provided in this report does not reflect the results of monitoring done by T. S. Bialke during his annual industrial hygiene audit of the plant conducted 7/27/82 through 7/30/82. Results of these samples had not been received at this time. C. W. Keeney cc: E. L. Beeler/H. E. Barrett C. M. Fischer/R. S. Lutz/M. D. Azzara W. C. Fultz/H. J. Kletke/V. W. Roberts L. A. Grady/W. J. Vitt R. J. Grahek/S. T. Brown W. C. Holbrook (Cleveland) D. L. Humphrey/H. E. Sullivan ___ ------r. n. KdLiyiimHVMKlT- S. BiAlWrffflTron) W. G. Pop/M. D. Schrader J. W. Robben P. A. Wagner/G. J. Lynch H. Waltemate (Cleveland) C iI* V i Building 1 " 115 " 121 LPA Malnt. Areas Other Areas PLANTWIDE MONITORING SUMMARY Louisville Plant Month of July 1982 Number of Samples 0 1 3 3 1 2 ____ 10____ VCM MONITORING Average in PPM Percent >1 PPM .10 .17 . 04 .no ___ .no 07 n n n n_ n Cl___ Maximum In PPM Minimum in PPM .10-- 48 12_ -00 .QjQ_____ .4a- ___ JlQ-- 02 00 -OP-- ___ 00-- 00 Building 30 31 122 " 125 " 130 M 131 " 132 " 145 " 403 PLANTWIDE ACRYLONITRILE MONITORING Number of Samples Average in PPM Percent >2 PPM * - __ 2 .00 0 . - 4 .14 0 5 .05 0 __ -_ 11 07 0 Maximum In PPM - .00 . .28 .11 - .28 Minimum in PPM - .00 - .01 .00 - .00 4/ VINYL CHLORIDE Specific Leak Detection - Buildings 1 Number of leaks detected S tagged. JZL Number repaired and tag returned. Number outstanding'at end of month. including those from previous months . 115 0 0 0 121 0 0 0 127 __ Q___ 0 0 Gas chromatograph operating time: B-l Percent of time in operation Percent down due to malfunction Percent down due to calibration Percent down due to July 4 shut down (l) B-l 11 G) B-121 71.20 1.41 .51 27.55% B-127 74.26 0 .50 25.24% Gas chromatograph check using a standard gas. Allowable limit + 1 PPM using a standard gas of approximately 5 PPM. Number of tests Number within limits Number exceeding the limit B-l (T) B-lll G) B-121 23 8 15 B-127 23 21 2 LPA 6 1 5 LPA 71.87 1.85 .54 25.74% LPA 23 23 0 Tajik Farm 1 1 0 Tank Farm 85.38% .20% .28% 14.14% Tank Farm (THA) 27 23 4 Job classification with resuits >i PPM Average Bldg. No. Job Class None Job Description No. of Samples Wearing Respi ra tor Average VCM CC AREA MONITORING Percent of time areas under <1 PPM: Building 1... 115... 121... (T)_____________ 90.92 99.22 LPA......... 98.94 Bid. 127_____ 48.17 Dual tubes to check flasher tube for breakthrough.................... ......................... 8 Percent exceeding the 20% criteria................................................................. ............................ 0 Percent to some degree, less than 20%.......................................................... ............................ 0 Percent showing none or sum of results less than 0.25 ppm.......... ........................100% Q Building 1 shut down - scheduled to re-open in August 1982 for temporary use. (2) Building 111 shut down - Bendix 7000 GC unit moved to Bid. 127 to replace older model Bendix 6000 GC. The Bid. 127 "gas chromatograph operating time" and "GC area monitoring" data sections reflect this change. nc to f cr ACRYLONITRILE Job classifications with results >2 PPM Average Bldg. No, ______ Job Class ______ __________ Job Description__________ ________ None__________________________ No. of Samples _________ Wearing Respirator Average AN Specific Leak Testing - Buildings Number of leaks detected & tagged Number repaired and tag returned. Number outstanding at end of month, including those from previous months. 30 n n 0 106 125 0l n _n n7 131 0 0 1 Lead Monitoring Lead results are reported in micrograms per cubic meter of air (Ag/M^ ). The OSHA standard is not to exceed 50Ag/Mi TWA over 8 hours. Results shown here are for the actual length of sample time. Building # No. of Samples /<g/M3 Average Ag/M^ Maximum Ag/M^ Minimum 20 1 17.43 17.43 17.43 u O VINYL CHLORIDE W* < I :hk X 5?n P t I? IM C M u b* n <?. cwx H 3N I JtJ OS X 04 ALKTUUNI I KIUC. HUT MO. 3 4 1 -2 0 b l t t t U H ORAPM M b l 2 0 X 2 0 W O INCH " "D l t t t D t M C O R P O R A T IO N * * AVERAGE^ YFflP 1QRP ALRYLDNII KILt zD < Cfftt 1T* OU-r 11 IkJ 2 s f*ftt. h o2 ^ f2t 4Si *cn 2x c r. D 2 DfK > YEAR-1982 VIIM 1L Lntumuu ;*o x an ftw in c h Rj--1982