Document NGyB38n4NE7OwxEV5rxaNy3wp
received Repair and Removal of
may i u ,984
Asbestos Insulation
D. A. GOSSELIN
CONTENTS
t. Repair and Removal situations
1. Repair and Removal situations 2. Asbestos-containing products to
which these procedures may apply 3. Prevention of risk 4. Recommended procedures for
repair, encapsulation or cladding
of asbestos insulation 5. Recommended procedures tor the
removal of asbestos Insulation 6. Isolation and enclosure of work
areas 7. Dust extraction equipment 8. Personal protective equipment 9. Disposal of stripped material
10. General
1.1 Asbestos in varying proportions has been widely used in insulation materials, especially lor me tnermai insulation ol steam-generating or process plants; lor heating installations and services; as relractory linings in sleel-makmg. metal
and other industries; and in sites ranging trom the smallest workshop to the largest industrial complexes such as oil refineries and power stations At sea large quantities have been used both for thermal insulation and lor the fire protection of crew, passengers and
cargo it has also been used widely in land transport, in railway locomotives and rolling stock. It has been a favoured material for the reduction of fire hazards in buildings, particularly those where
large numbers ol people assemble. In Ihese buildings it is used in the form of cladding ol the steel structures and the formation of lire breaks It has also been widely used Ior thermal and acoustic insulation,
rQ,Cd/->
L/C',/ y &
1.2 In me course of maintenance, repair, alteration, removal or demolition, many
instances occur which necessitate me repair or removal ot asbestos-containing materials Since by the nature ol their insulating properties such materials are usually ot low density and often found in a very dry stale, their disturbance is likely to result in high concenirations of dust unless suilable precautions are taken.
1.3 The amount ot respirable asbestos dust generated will depend on the nature of the product and the operation to be
performed ll is essential that steps are taken to reduce the level ol dust to the lowest practicable level and to ensure the protection ot all personnel from risk ol inhalation oi harmful quantities ot asbestos or other dusts, altnougn the measures to be adopted will vary according to the nature and extent ol
the work to be carried out This document is designed to assist all those who may be concerned witn the achievement ot these aims
UCC 011590
2. Asbestos-containing products to which these procedures may apply
2.1 Compounds containing asbestos and applied by spray
2.2 Compounds containing asbestos in the form of plastic self-selling mixes lor covering pipes and equipment, olten in conjunction with pre formed insulation materials
2.3 Pre-formed insulation in the form ot pipes, lags or slabs (or (abrrcalions thereol, such as valve and Mange covers)
2.4 Mattresses consisting ot asbestos or man-made cloth covers or envelopes filled with loose asbestos fibre
2.5 Asbestos cloth, tape or paper, often as an outer covering ol the above-mentioned forms of thermal insulation.
2.6 Asbestos rope lagging, usually applied spirally wound onto steam or hot-water lines.
2.7 Refractory blocks or linings.
3. Prevention ot risk
3.1 Regulations in some countries restrict the use ol certain of the above-mentioned products (e g by permitting thee use tor fire protection only). Even where certain uses no longer occur, installations and situations involving such materials will continue to exist for many years, so that the observance of suitable conirol procedures will be necessary tor a long time in the future. Dust generated in demolition, whether or not the materials contain asbestos, is bound to be considerable so that measures tor trie protection of personnel and the prevention of public nuisance will be essential
3.2 It should also be stressed that the removal of installed insulation lor nooiner reason than that it contains asbestos may be ill-advised In many cases the risk created by the removal would lar exceed any which would arise if the insulation were lett m place etteciiveiy sealed. It is not always possible completely to remove all sprayed asbestos; for example, where areas were
sprayed during the construction process and subsequently have become inaccessible. Sometimes, as a result ot impact or vermin attack, a portion ot the surface may become opened up thus releasing fibrous maieriai. in such situations it may well be more etlective to repair the damage and seal tne surface to prevent further release rather than to attempt removal
'4. Recommended procedures lor repair, encapsulation or cladding ol asbestos Insulation
4.1 Where, as described above, a poriion ol Ihe surface ol asbestos theimal insulation has become damaged so Inat (here is a possibility ol me release ol libres, various meihods can oe adopted to prevent suen release Whemer the damage can oe adequately and elfeclively encapsuiaiea is a matter lor judgement, laking into account the lollovying
4.1.1 The nature and condiiion ol the insulation, for exampte .il the material is breaking away from its base complete
removal will probably be unavoidable.
4.1.2 Whemer the insulation is liable lo lurlher damage, e g in me couise of ordinary work trallic
4.1.3 Wheiner (he insulation is accessible or if major structural work would be necessary to allow its removal
4.1.4 Wnat are comparative costs ot removal or effective repair/sealing
4.1.5 If me insulation has been provided lor statutory lire protection, whether this requirement can be met by otner means.
4.2 There are a number of products which may be used to seal, encapsulate Of Clad existing asbestos containing insulation materials, provided tney meet me basic requirement of a continuous impervious surface The main classiltcaiions are as follows
4.2.1 Flexible and semi-flexible polymeric or bituminous coatings These are normally applied by spray as water-based emulsions Dut may be solvent-based. The fimsned surface has low lo medium slrength bul polymeric coatings used in conjunction witn glass fibre fabrics can provide good impacl resistance
4.2.2 Inorganic cementitious materials, normally in tne lorm of fibrous or parhculaie-filied cements activated on site by water Tnese materials trowelled on lo ine surface ol the insulation provide a rigid or semi-rigid hard .'.earing surface which can be addil.onaliy strengtnened witn expanded metal mesn (o give high impact resistance
4.2.3 Pre-lormed sheets, panels or Doards ol metal, plasterboard, etc (e g for latse ceilings and walls! assembled so lhal all pints ate proper./ made and effectively sealed
4.2.4 Cladding materials suen as galvanised metal sneet or r ooea aluminium sheel, or wrapp ng materials such as polythene Sheeting or reinlorced aluminium toil ot suitable gauge, again paying particular attenlion to tne effective sealing ol all pints
4.2.5 Impermeable sealing tape (duct tape, fibre tape) can be cssd for sealing small damaged areas, pa'acularly on pipes
4.3 Selection of Ihe scaling molhod and flte material lor a particular application will depond on tho following factors
4.3.1 T he dogree ol proleclion required,
e g is i( an area vulnerable lo impacl of abrasion?
4.3.2 Conditions of weat; the surface toughness and flexibility required, e.g does the surface tequite lo be regularly decot ateci?
4.3.3 Type of surface. Certain
treatments may impair sound absorption or ann-condensalion characteristics ot adversely affeef the requited spread ol flame' properties.
4.4 Protective procedures Specific precautions will depend upon local situations and the type, extent and condition of the surface lo be repaired. Where the work is minor or tne surface is not being disturbed, it is normally sufficient to erect physical barriers and warning nonces ten metres bom the work.
4.4.1 The area to be sealed should be vacuum cleaned (using an industrial cleaner approved tor use with asbestos) to ensure the removal ot all loose debris and dusl particles lo obtain good adhesion ol (he coaling to be applied.
4.4.2 Damaged areas should be repaired belore encapsulation lo restore the required insulation properties, e g. (ire resistance, and lo provide a suitable base for sealing
4.4.3 If ihe condition ol the damaged area is such mat dust levels may exceed specified safety standards (a) the area should be completely enclosed to prevenl the escape ol dusl to adjacent areas, (b) workers should be provided wilh appropriate protective equipment and follow the work procedures described in subsequent sections ol this guide.
5. Recommended procedures for the removal of asbestos, insulation
5.1 Identification of materials
5.1. t Under certain circumstances there may pe a need lot preliminary sampling ol the materia! to be removed in order to establish precisely tne asbestos content This may not always be obvious by visual examination and in suen cases scrutiny by sophisticated technical apparatus may oe required in order 10 asceriam witn certainty the
nature ot Ihe fibrous conieni. II local regulalions require this, expert advice can be souyni Irom me AIA or from one
ol tis Member Associations
5.1.2 Generally, however, in view ol the inevitable dustiness ol such operations,
lull protective measures can and should be taken as a matter ot course Steps should be taken lor the personal proleclion ol workers involved and lor ine limitation of the contaminated area lo safeguard other workers and to avoid a public nuisance, regardless of me type rtf *rtr > ---
5.2 Selection of method There aru broadly fnruu mam riii/inods
lor Ihe controlled removal ol ar.Uo:.toS insulation
Dry stripping Wei stripping
Slopping by high-pressure jels
In some cases circumstances may call for a combination ol Ihese techniques The circumstances determming me seleciion ol method and the (actors to be considered are dealt with below 5.3 Dry stripping This method is essential where it is necessary 10 remove insulation near live electrical apparalus. II may also be desirable in oiher situations where Ihe presence ol large amounts of water would create difficulties or extra hazards. 5.3.1 Since no dust suppressant can be used, (his method demands a very nigh standard ot respiratory proleclion, (See RCP 9 ) 5.3.2 Enclosure ol Ihe work area must be Ol a very high slandard. with air locks tor access, and maintained under negative pressure to prevent leakage ol dust-laden air. (See 6.1.) 5.3.3 Surfaces Irom which insulation has been removed should be finished off by wire brushing under vacuum and in some cases it may be necessary to seal tne exposed surface. 5.3.4 Thorough vacuum cleaning ol the area on completion ol the work, especially ot the interior surfaces of the screening, is most important but should be easier man with otner meihods since (he material remains dry A linal wet cleaning is also recommended. (See 104 > 5.4 Wet stripping Control by suppression ol dusl with water is most general, bur can only be used where (here is no electrical apparatus, or where such equipment can be isolated At tne end ol tne work it is ol vital importance tnat a competent person should ensure that i( is sale lo restore the electric supply.
UCC 011591
5.4.1 Fcr adequate suppression ot Cost, me insulation material niusl be thoioughly wetted before stripping begins The material needs to be saturated; to this end the lagging should
be pierced al intervals, preferably with hollow probes which will carry the water into the interior ot the insulation material The addition ol wetting agents to water greatly assists penetration
5.5 Stripping by high-pressure
water jets This is a highly specialised technique employing waler jels normally operating
at ptessutes above 750 psi (5.2 MN/mJ)
and usually restricted to lathy large-scale
operations and to siles where access is difficult, e g where the asbestos has been applied by spraying, and where
otner techniques are unlikely to be saiislactory. However it should not be used where electrical apparatus is present which cannot be isolated
5.4.2 Careful use of low-pressure sprays (or tine mist) at the point of operation will help to keep down the dust levels m the immediate working-area.
5.4.3 Care must be taken to avoid an accumulation of wet material and slurry on the floor of the working-area, since this will create a hazard Irom slipping as well as increasing me work ol subsequent cleaning up
5.4.4 It the floor consisls of open-mesh gratings, ihey should be covered, but great care is necessary to avoid the risk ol slipping Floor surfaces wmch could be damaged by water (e g hardwood blocks, tiles) should be covered before operaiions commence
5.4.5 Insulation should be removed by cutting or sawing rather tr.an by breaking with axes or hammers As far as possible material should not be allowed lo fall, but should be placed directly into suitable plastic bags lor ultimate disposal.
5.5.1 This method should only be undertaken by properly trained personnel and under competent and expert supervision, since the use ol such high-powered /els is capable ol causing serious injury
5.5.2 In addition to normal enclosure and warning notices, signs marked Danger: High-pressure Spraying' snouid be displayed.
5.5.3 The specialised equipment must be properly maintained and the jet controlled by a deadman's' control valve so that the hign pressure is shut oft on release.
5.5.4 The slurry produced will be collected by pump into specially designed containers lor disposal and must be diverted Irom drain openings.
6. Isolation and enclosure of work areas
6. t Whichever method of removal is employed, me area where the work is to be earned out should be isolated Irom olher work areas, generally by enclosure within dust-impermeable screening. Strong plastic sheeting, with all pints catelully sealed, provides a most effective form ot screening. Air locks must be provided for access and ventilation provided lo ensure that the work area is maintained under negative pressure to prevent dust leakage
5.4.6 The welted material should not be allowed to dry out, but should be removed while still wet and put into me plastic Dags, re-wetting as necessary with me low pressure sprays
6.2 Warning notices should be
prominently displayed so that workers not directly involved with the removal are warned against, or prohibited Irom. entering the atea as these workots will
nol be equipped with personal protective equipment and probably nol (rained in the procedures lor the control of dust
6.3 In some situations where the operation is limited and well controlled by welling, and is nol immediately adjacent lo areas occupied by other workers, it may be sufficient and practical lor the area ol operation to be roped off Generally, however (and always it dry stripping is to be carried out), it is preferable for the stripping-area to be screened oft.
6.4 Access from the area ot operations to the washing and changing facilities / must also be isolated so that men who have been engaged in stripping do not spread dust from contaminated clothing The most saiislactory arrangement is tor a decontamination area to be sued immediately adjacent to the work area, so ihat workers pass through inis before re-entering the unrestricted part of the location.
7. Dust extraction equipment
7.1 When dry stripping is the melhod employed, reliance must be placed upon a combination ol;
(a) hign-elliciency respiratory protection; (b) comprehensive enclosure ot the dusty area; (c) dust-extraction equipment designed tor use with asbestos dust and adapted tor application to the point ot dust generation. For stripping operations the equipment needs to be high efficiency filtered; transportable equipment will usually be required, although sometimes installed equipmeni may be adaptable for close application to the point of removal
I
UCC 011592
7.2 Dust-extraction devices aiu most elteclivc when thoy are coupled with adequate limilaliofi ol the area ot application by a capture hood concentrating the suction airtlo* close to the point ol dust generation
7.3 For some removal operations, lor example where equipment ol a similar type Irequently requires stripping, it has been found practicable to develop a Custom-built enclosure, coupled with extraction, within which the stripping can take place with no risk ol escape ot dust into the outside atmosphere 8. Personal protective equipment 8.1 Experience indicates that even under wet conditions it is difficult to ensure that dust concentrations will at all times be successfully contained within the recommended levels. It is therefore advisable that personal protective equipment and clothing should always be provided and worn whenever and wherever such work is carried on 8.2 Where small amounts of stripping are called for and water suppressing methods are used, cover-all protective clothing (such as a boiler suit) and asbestos-approved on nasal respirators may be adequate For all otner situations lull protective clothing, including hoods and boots, should be worn, together with positive pressure respirators Where concentrations are expected lo be heavy and sustained (certainly when dry stripping is being carried out) the most sophisticated equipment, such as direct air-line breathing-apparatus. will be required. 8.3 Accommodation must be provided lor the storage of personal clolhing so that it will not become dust contaminated Separate storage must be provided (or proieclive clolhing and equipment when not in use, this clothing and equipment must be isolated from personal clothing by the personal cleansing area
8.4 F.u ilitiu:; must bo provided lor ito dustii ii| mu piotoctivo clothing upon Waving the woik silo Suitably adapted vacuuming equipment should bo used lot preliminary do-dusling bolotu tho pioiectivo clothing is removed Washing facilities, including showers, stioukl be provided lor use alter removal ot the pioteclive cloiltmg and bolore moving into the personal clothing dressing-room. 8.5 Collection ot proieclive clothing lor cleaning must be strictly controlled. (See RCP 9) In heavily contaminated conditions it may be necessary lo change the clothing ai the end ol each work period Certain kinds ol disposable clothing may be suitable 0.6 Detailed recommendations for use, selection, care and training in the use ot personal protective clothing and equipment are contained in RCP 9. 9. Disposal ol stripped material 9.1 As with other forms ol asbestos waste, stripped material must be collected into receptacles horn which dust cannot escape during transit from collecting-point to disposal site. Heavy-duty polythene bags are most convenient and suitable for stripped insulation. It is recommended that these bags carry a warning label -- in some countries this is obligatory.
9.2 It is recommended that bags containing shipped asbesios material be collected into skips, kept separate from other wastes, and regularly cleared from the work site. 9.3 Detailed recommendations for the disposal of alt types of asbestos waste, including control in transit and at tipping sites, are contained m RCP 3 and are applicable lo the disposal ol waste material from stripping operations
9.4 WtK!iUui|li pri.-.: i.i-: k t '.lii|>|"ii`l is employed, resulting m I.it j>r qu.iiililius ot very liquid slurry, il will be nocuv.uiy to pump ttie slurry from colluding tanks into enclosed tankot lyiw vehicles lor transit to approved locations tor disposal in such a way mat (hero is no risk ol drying out
10. General
10.1 Training and supervision. It will be apparent from the foregoing that stripping-crews must consist of personnel who have been selected and trained in the methods and hygiene disciplines required Supervision ol a high standard of integrity and competence is essential, with particular regard lo the efficiency of the technical equipment and security of enclosures.
10.2 Maintenance. Routine inspection of all equipment, enclosures, accommodation and facilities should be scheduled and regularly reported and / recorded. Plant so covered will include;
Extraction equipment Vacuum cleaning equipment Wetting appliances, including hign-pressure jets Enclosures and signs Protective clothing and equipment Hygiene facilities.
10.3 Cleaning. Whatever method of repair ot removal is adopted, final cleansing of the site should be carefully carried out by wet cleaning, ideally in two stages with a 24-hour waiting-period in between to ensure that all dusi Is removed.