Document NGvgzjxXGz9DQ89qgMyyxQ39p

INTERNAL CORRESPONDENCE IH Yxs UNION CARBIDE CORPORA DON TECHNICAL CENTER PO BOX 836 1 SOUTH CHARLESTON WV S63C3 ....... H. E. Rucker c,-.. ... ?QQ9 " 51? ccd, 10 Avashia, M.D. - 512/23 W. L. Browning - 2009 R. E. Coyner - 2009 D. B. Matthews - 2009 C. P. Maxwell - 701/2 8. R. McMakin - 2009 Dw-e July 23, 1987 rK,.n*.yr),tWTS _ HS&EA PLAINTIFF'S EXHIBIT A,'Ga Industrial Hygiene Asbestos Exposure Monitoring Attached are the results of asbestos monitoring for two days on insulators at the Institute Plant while removing asbestos from lines in the tank farm between number two and number three docks on the river bank. Approximately 195 feet of 3-inch steam line was stripped. Glove bags and enclosures were not used because of heat involved in stripping the steam line melting the plastic. Amended water was used to wet the asbestos as soon as it was pulled away from the hot pipe. All personal exposure samples were below the 0.1 fiber/cc action level. Employees should be ammended for the professional manner that was employed in this asbestos removal project. Exposure monitoring may not be needed on a continuous basis if other monitoring levels remain below the action level. Monitoring may not be needed if supplied air respirators in a positive pressure mode are used in asbestos removal projects. We encourage the use of supplied air respirators as much as possible in the asbestos abatement procedures. Employees wore no street clothes, two pair of coveralls, headcovers, boots, gloves and A0 R-57-A half-face HEPA cartridge respirators. They showered before lunch and at the end of the workday before leaving the plant. Please inform P. K. Snodgrass, B. J. Agosti, S. R. Erskine and C. B. Clendenin of their exposure monitoring results as soon as possible. Have them sign and date this report and return it to M. A. Patel at Building 701-330. UCC 024434 Asbestos Monitoring - continued -2- July 23, 1987 If you have any questions or if we can be of further assistance, please call us on extension 4779 or 3750. WORK BY: APPROVED BY: 1L. / vance E. Stover & Howard J//Kirible Attachment VE5:HJK:MAP:rab 2524P A Manhar A. Patel UCC 024435 Carp. Ref. W2241 W2242 ASBESTOS EXPOSURE MQNITORINS Date Sample Type/ Employee Name Sampling Time Air Cone, fibers/cc TWAg fibers/cc CCftENTS 5-20-87 Personal/ P. K. Snodgrass 7hrs 8nin 0.040 5-20-37 Personal/ B. J. Agosti 7hrs 5min 0.043 5-20-87 Personal/ S. R. Erskine 7hrs 5rrrin 0.062 5-20-87 Personal/ C. B. Clendenin 7hrs Omin 0.076 6-1-87 Personal/ P. K. Snodgrass 6hrs 58rrin 0.073 6-1-87 Personal/ B. J. Agosti 6hrs 5anin 0.104 6-1-87 Personal/ C. B. Clendenin 6hrs 58nin 0.110 0.036 0.038 0.055 0.067 0.063 0.090 0.096 Stripped, bagged and vacuumed approx. 120 feet of line at tank farm between #1 and #2 docks. Stripped, bagged and vacuumed approx. 120 feet of line at tank farm between #1 and #2 docks. Stripped, bagged and vacuumed approx. 120 feet of line at tarik farm between #1 and #2 docks. Stripped, bagged and vacuumed approx. 120 feet of line at tank farm between #1 and #2 docks. Stripped, bagged and vacuumed approx. 75 feet of line at tank farm between #1 and #2 docks. Stripped, bagged and vacuumed approx. 75 feet of line at tank farm between #1 and #2 docks. Stripped, bagged and vacuumed approx. 75 feet of line at tank farm between #1 and #2 docks. 2524P UCC 024436