PVC PLANT SAFETY & HEALTH MANUAL ABERDEEN, MS noco) ITEM 7 Conoco Chemicals Company Conoco Inc. P. O. Box 91, New Highway 25 Aberdeen, Mississippi 39730 (601) 369-8111 SUBJECT: WORK ENVIRONMENT HAZARD CONTROL PROGRAM I. INTRODUCTION Operation of the Aberdeen PVC Plant involves the presence of the work environment hazards described below. Each hazard may be damaging to the human body if controls are inadequate. This program establishes the minimum controls required for that purpose. A. Chemicals A wide range #f chemicals are required for plant operation. Many of them are toxic or otherwise hazardous. In those cases, harm to people may occur via inhalation, ingestion, or direct skin/eye con tact, depending upon the specific chemical and conditions present. B. Noise Inherently noisy equipment exists throughout the plant. Excessive exposure to the resulting noise may produce temporary or permanent hearing loss. c* Low Light Levels Safe plant operation requires adequate work area lighting. Loss of this light, regardless of cause, greatly increases the risk of per sonal injury and other accidents. D. Biological Hazards Plant breakrooms, restrooms, and trash containers represent locations where biological hazards may develop. The presence of vermin attrac ted to these areas Increases the risk of incurring illnesses. 3/16/84 Section 1.510 Page 1 DTH 000042862 PVC PLANT SAFETY AMD HEALTH MANUAL PAGE 2 II. HAZARD IDENTIFICATION AND CONTROL Any employee who discovers what he believes to be a new work environ ment hazard Is expected to eliminate the hazard If It Is within his authority to do so. If this is not possible, he should take preventive action to insure that the risk of personal injury due to the hazard is kept at a minimum until further corrective action can be taken. The preventive action necessary may range from something as simple as closing a valve to shutting down an entire process. If the employee cannot eliminate the hazard, he must report it to his super visor. III. HAZARD EVALUATION A. New Chemicals 1. General Any new chemical will not be used in the plant until: a. All hazards associated with the intended use of the material have been identified by the using department and the Safety Department. b. Protective measures, including the acquisition of personal protective equipment, have been taken to cope with the hazards. 2. Material Safety Data Sheets Any person who causes a new chemical material to be introduced into the plant must also insure that a material safety data sheet is obtained from the vendor prior to the use of the chemical. A copy of the sheet is to be given to the Safety Supervisor, who is responsible for maintaining an up-to-date file of vendor safety data sheets for all chemical materials used in the plant. Should the attempt to obtain a vendor data sheet before use of the chemical fail, the Safety Supervisor should be contacted. He is to determine the hazards and other information pertinent to the chemical by whatever means are appropriate. This will include a direct contact with the material vendor. It may also involve communication with Conoco industrial hygienists, toxi cologists, or other person(s) who can supply information regarding potential exposure problems as well as necessary con trols for safe use of the material. 3/16/84 Section 1.510 Page 2 DTH 00004288 PVC PLANT SAFETY AMD HEALTH MANUAL PAGE 3 III. HAZARD EVALUATION (Continued) B. Routine Dosimetry The Safety Department will conduct effective, on-going dosimetry programs for the following hazards. Each program will comply with the requirements of regulation pertinent to each hazard: 1. VCM Worker TWA VCM exposures will be routinely determined, using REAL "Minimonitors". Sample analysis will be done by the laboratory, using a Perkin-Elmer '^42" head-space analyzer, or other equivalent analytical instrument. As sooq as analysis is complete, the Plant Nurse or the Safety Supervisor will notify each department of any overexposures. On weekends, the Laboratory will perform the notification. Following notification, the department supervision will then: 1. Investigate and determine the causes and circumstances of each overexposure. 2. Discuss 1. with the overexposed employee. 3. Report their findings to the Safety Supervisor. 2. Lead Worker TWA lead exposures will be routinely determined, using Bendix Mod. BDX-44 pumps, operated at 1.5 liters per minute, and either Gelman #4337 filters or Mlllipore MAWP037AM filters. Analysis will be done by Research Services, using atomic absorption analysis. When analysis is complete, the Safety Supervisor will calculate the exposure results and advise each department of any overexposures. The department will conduct follow-up investigations as with VCM. 3. Total Dust Worker TWA total dust exposures will be routinely determined, using Bendix Mod. BDX-44 pumps, operated at 1.5 liters per minute, and Millipore MAWP037AM matched-weight, dual filters. Analysis will be done by using a 5-place analytical balance. When analysis is complete, the Safety Supervisor will calculate the exposure results and advise each department of any overexposures. The department will conduct follow-up investiga tions, as with VCM. 4. Noise Worker noise exposure will be routinely determined, using audio dosimeters which comply with the requirements of OSHA noise regulation. 3/16/84 Section 1.510 Page 3 DTH 000042834 PVC PLANT SAFETY AND HEALTH MANUAL PAGE 4 III. HAZARD EVALUATION (Continued) C. VCM Area Monitoring The Hofieyvell contlnous monitoring system will be used to reduce the risk of VCM overexposures in areas where high concentrations may occur. The system will be maintained and used under the direc tion of Process and Mechanical Engineering. D. Special Studies 1. VCM The Safety Department will conduct VCM exposure studies of high-exposure-risk jobs, as they become evident. This may involve area sampling, dosimetry, or a combination of both, as needed to define exposure levels and corrective action required for their control. 2. High Volume Use Chemicals As with VCM, the Safety Department will conduct exposure studies involving other high-volume-use chemicals as needs arise. This includes occasional rechecks of exposure levels and studies of unique conditions that may develop. 3. Noise The Safety Department will conduct an on-going program of area noise level measurement. This work will be aimed at determin ing noise reduction and hearing protection needs, as required by OSHA 1910.93. They will be assisted by outside personnel, as required. 4. Lighting Work area lighting deficiencies will be determined at night by department heads and the Safety Director during the annual safety audits of each operating area. Particular emphasis will be given walking surfaces where slips/trips could result in severe injury. A light meter will be used, as needed. 5. Restrooms, Breakrooms, and Washrooms The Plant Nurse will conduct quarterly inspections of all plant breakrooms, washrooms, and restrooms to insure adequate clean liness standards are being maintained. 3/16/84 Section 1.510 Page 4 DTH 000042865 PVC PLANT SAFETY AND HEALTH MANUAL PAGE 5 E. leports [. General The tlnely reporting of work environment hazards is essential to their effective control. Any employee who discovers a hazard suspected of representing a serious danger must report it immediately to his supervisor. Additionally, Interim measures must be taken to control the hazard until further action can be taken. This is a responsibility borne by each employee. The reporting of hazards to non-plant personnel will be confined to that established by local manager policy. . Routine Reports The following reports will be routinely made: a. Weekly Results of Chemical Dosimetry The Plant Nurse will issue weekly reports of the results of routine chemical dosimetry. This includes VCM, lead, and total dust. b. Weekly Results Of Noise Dosimetry The Plant Nurse will issue weekly reports of the results of noise dosimetry during the times when noise doimetry is being done. c. Overexposure Notices The Plant Nurse will issue reports to employees found to have been overexposed during routine chemical and noise dosimetry, notifying them of their overexposures. In the absence of the Plant Nurse, the reporting will be done by the Safety Supervisor. d. Monthly Industrial Hygiene Report The Plant Nurse will issue monthly reports which summarize the results of all: (1) Routine chemical dosimetry, including the details pertinent to overexposures. (2) Work area ventilation checks. (3) Special chemical exposure studies, including VCM. (4) Noise measurement, including dosimetry. (5) Dosimetry equipment evaluation, maintenance and cali bration. (6) Industrial hygiene program changes, including plans. 3/16/84 Section 1.510 Page 5 DTH 000045'.866 PVC PLANT SAFETY AM HEALTH MANUAL PAGE 6 III. HAZARD EVALUATION (Continued) 2. Routine Reports (Continued) e. Annual Dosimetry Sampling Frequency Plan Hie Safety Supervisor will review the results of all routine chemical dosimetry at the end of each year. Based on those results, he will then issue an up-dated sampling frequency plan for the following year. IV. EMPLOYEE COMMUNICATIONS AW) TRAINING A. Hazardous Material Control Prior to the use or handling of new, hazardous materials, each employee involved will be advised of the associated hazards and trained in the steps to be taken to control them. Additional information and training will be provided when required by regulation pertinent to each hazard. B. Noise Work areas having hazardous noise levels will be posted with warning signs that require the use of hearing protection. Employees are required to use such protection while in posted areas. C. New Employees 1. Initial Orientation The Safety Department will provide general orientation training on VCM, lead, and similarly regulated materials to new employees. 2. On-the-Job Further training on the use and handling of hazardous mate rials will be provided to new employees by the employee's immediate supervisor. All training of this nature will be documented by a training meeting report at the time of occurrence and the reports distributed to the Manager, Plant Superintendent, the Operations Superintendent, Safety Director, and Plant Nurse. D. Annual Health Training Each plant department will conduct an annual health training session for department employees. The session will include a review of plant work environment hazards and their control. Special emphasis will be given to OSHA-regulated materials, including VCM, lead, noise, and asbestos. Technical support will be provided by the Safety Department. 3/16/84 Section 1.510 Page 6 DTH 00004286'7 PVC PLANT SAFETY AW) HEALTH MANUAL PAGE 7 IV. EMPLOYEE COmPNICATIONS AND TRAINING (Continued) E. Respirator Training 1. New Bnployees The Safety Department will conduct basic respirator training for each aew employee as a part of the orientation in C.l, above. The instruction will include explanation of the functioning of each respirator, a demonstration of its correct use, and employee practice. 2. Refresher Training The Safety Department, in conjunction with Operating and Main tenance Departments, will conduct annual respirator refresher training for all employees whose job duties require the use of respirators. The training will be done by using 1st line supervisors as assistant instructors and will include negative face piece fit seal checks, using a test environment. V. ENGINEERING CONTROLS Whenever possible or practical engineering controls will be used to control environmental hazards. When hazards are present and adequate engineering controls have not been implemented. Interim measures of other types mast be used to protect employees from the hazard. VI. VENTILATION A. General Ventilation systems in use must be maintained and used as designed and intended. Should system failure occur, employees normally pro tected by ventilation must be removed from the area(s) of the hazard unless other equally effective protective measures are provided. B. Building Ventilation System The Compound Department is responsible for daily monitoring of the compound ventilation system and the issuance of work orders or other measures needed to correct system deficiencies. The Safety Department will conduct quarterly measurements of venti lation system airflow and immediately alert the Compound Department of any serious deficiencies found. 3/16/84 Section 1.510 Page 7 000042B68 dth PVC PLANT SAFETY AND HEALTH MANUAL PAGE 8 VII. HOUSEKEEPING AND SANITATION A. General To the degree possible, employees are expected to maintain their areas of responsibility in a state of order and free of trash, litter, and other materials which might produce biological hazards. B. Breakroom and Restroom Cleaning The Mechanical Department is responsible for insuring the timely cleaning and maintenance of breakroom and restroom facilities throughout the plant. C. Vending Machine Cleanliness The Administrative Services and Safety Departments will be responsible for liason with food vendors for the purpose of correcting any vending machine health hazards. D. Breakroom/Restroom Inspection The Plant Nurse will conduct quarterly inspections of all plant restrooms, washrooms and breakrooms to insure adequate sanitary conditions are being maintained. E. Personal Hygiene All employees are expected to exercise care to minimize unneces^ sary or prolonged hand, face or skin contamination with chemi cals of any.type. It is especially important that employees throughly clean their hands and face prior to eating, drinking or smoking following the handling of chemical materials. VIII. PERSONAL PROTECTIVE EQUIPMENT Employees exposed to environmental hazards that require the use of personal protective equipment must be provided with and required to use such devices. The equipment must be effective and have Safety Department approval. When doubt arises about what; hazards are present or what personal pro tective equipment is needed, the Safety Department should be contac ted. IX. CHEMICAL DISPOSAL Process Engineering will conduct an on-going program for the safe dis posal of hazardous materials. Appropriate State and Federal regula tions must be complied with. X. MEDICAL SURVEILLANCE PROGRAM An employee medical surveillance program, performed under the guidance of the Medical Division, will be maintained and all employees encour aged to participate. 3/16/84 DTH 000042869 Section 1.510 Pase 8