Document NGk3ZXDKyDb6DDBYLqn3NxXMD
FALL 1968
js^M 4=; /j-->
M A.4
........
. >!
-wv-;.-
"1
KMX 00483
* t'
~
.
> s^
Minerals
In the Past
Throughout history minerals have
played an important role in human
affairs.
'
Past civilizations have flourished and
nations have gained tremendous eco
nomic, political and military power
because of their possession of mineral
deposits, when combined with the
knowledge of how to exploit the wealth
of the earth's crust.
That a relationship between mineral
deposits and national power exists has
been an undisputed fact since ancient
times.
Gold and silver for example have
contributed greatly to the civilization
of the eastern part of the world.
Between 3000 and 4000 B.C., the
prosperity of organized communities
in the valley of the Nile, in Mesopo
tamia, in the Indus River Valley of
India, and in the Yellow River Valley
of China, had a direct relation to the
mineral deposits in those areas.
For her power and glory in the 5th
century B.C. Athens was much in debt
to the mines of Greece. One of the
reasons the Greeks were able to turn
back the Persian invaders was that the
Greek soldiers were armed with bronze
swords and shields, while most of their
enemies still used leather shields and
stone weapons.
In more recent times. Great Britain
offers a good example of the relation
ship between mineral deposits and na
tional power and prosperity.
Britain was able to maintain the
"Pax Britannica'' in the 19th century
because of her industrial, economic and
military supremacy. This supremacy
owed its existence to the fact that Great
Britain was, at one time or another
during the past century, the world's
largest producer of iron, coal, lead and tin.
As an outcome of this production not only did British domestic markets and foreign trade flourish and bring wealth such as no other country in history enjoyed, but the favorable trade balance also enabled her to control Malayan tin, Spanish iron, and many of the mines and oil fields of Mexico, Chile, Iran, Australia, Burma, etc.
In addition, with the defeat of the Boers in South Africa (1899-1902). the British investments were heavy enough to control more than half the world's production of new gold as well as large deposits of chromite, copper, diamonds, asbestos and manganese.
The implication of the lack of min eral deposits for any country, ancient or modern, is obvious. Such lack would undoubtedly be reflected in the nation's economic, political and military posi
tion in world affairs.
1933
Vinnell has been engaged in mining for more than thirty-five years.
Though A. S. Vinneli's interest in min ing goes back to the 1920's, when he was involved in various small but rewarding operations in the minerals field, the actual year that the organization began its min ing activities was 1933. During that year A. S. Vinnell Co. undertook a very sig nificant project at the Cave Canyon (Bax ter) iron deposit, located east of Barstow, California, near the Union Pacific Rail road.
At the time that A. S. Vinnell started the Cave Canyon operation, the use of iron ore as an ingredient for special lowheat cement had created a new market and Vinnell Co. shipped large quantities of iron ore to California Portland Cement at Colton, California. This company used
on one of their early trips. Picture was taken in 1932 and the background shows a gypsum deposit area in southern Nevada.
IflEI&IPI I 2
Published at Alhambra, Calif., by the VINNELL CORPORATION, to acquaint its employees, friends and customers with the news and
activities of the Vinnell Corporation. KIMON SKORDILE5, Edi'cr. Address communications to: Editor. VINNELL, 1145 Westminster
Avenue, Alhambra, California.
SEPTEMBER, 1968, VOL. 10, NO. 2
KMX 00484
1968
it in the manufacture of cement for the construction of Boulder Dam in Nevada. After the Boulder Dam construction was completed, operation of the Cave Canyon deposit continued to supply iron ore to California Portland Cement.
The encouraging outcome of the Cave Canyon operation, as well as the expan sion and diversification of Vinnell's many activities in the following years, led to the formation of an organization which would specialize in the growing mining operations and concentrate its efforts to that end. Thus, the Mineral Materials Co., a partnership between A. S. Vinnell and Clair Dunton, was set up in 1937, with Clair Dunton as General Manager, a position that he has held for more than thirty years.
(Continued on page 4)
Minerals
At The Present
The Industrial Revolution in the 18th century was marked by two im portant events: the discovery, by Ab raham Darby, of the use of coke for smelting iron; and the invention of the steam engine, by James Watt.
Both these discoveries were made possible through the use of minerals, and since then, man has discovered many other uses for these constituents of the earth's crust.
Today's industry is almost totally dependent on these naturally occurring, ready-made, homogeneous substances which have definite chemical and phy sical characteristics and are called min erals.
Rock and soil are aggregates of minerals. But the fact that rocks and soil are all about us doesn't mean that minerals are evenly distributed over the earth's crust. Only a few geological environments favor the formation of mineral deposits. And these environ ments are confined to small areas of the world.
Of the more than two thousand min erals that have been recognized and described by geologists, only about twenty are found in abundance on the earth, and these are unevenly distrib uted in various geological areas. The distribution of minerals and their com mercial values makes the difference between geological areas being rich or poor in mineral resources.
Fortunately, the United States has a well-balanced supply of mineral re sources. These resources have enabled this country to develop the greatest in dustrial power in the world.
Today, because of the many uses to which they can be put. minerals are even more important than they were in the past. It has been estimated that more metal has been mined since 1920 than was mined in all preceding history.
Thus, the mining industry is becom ing more and more important to almost every aspect of life. To this ever grow ing industry, the Vinnell Mining and Minerals Corporation, with its modem equipment and well-qualified personnel, offers its services.
ON THE COVER
Asbestos piont of Coalinga, California, owned by Atlas Asbestos Co., a joint ven ture of Vinnell Mining A Minerals Corp. and California Minerals Corp.
(Picture by Chos. Eaton)
mineral operations in which A. S. Vinnell was engaged steam shovel shown in the picture was an important
The Cave Canyon (Baxter) iron deposit, east of Barstow, California, was the first significant mining project undertaken by the A. S. Vinnell Co. Begun in 1933, this operation marked the entrance of the Vinnell organization into the mining field.
KMX 00485
3
THE YEARS OF EXPLORATION
AND DISCOVERY
A Gardner-Denver oir-trac drill drilling holes at the Oro Grande mine. Explosives will be placed into the holes in order to facilitate the mining of silica quartz.
A Northwest shovel loading silica quartz on a Euclid truck which will transfer the material to the primary crusher.
At this point it should be mentioned that Clair Dunton worked with A. S. Vinnell during his early mining and construc tion activities. He assisted Vinnell and participated many times in trips of the early 1930's, when Vinnell was very much interested in exploring the mineral areas of California, Nevada and Arizona for potentially valuable industrial min erals and ores. Clair was with Vinnell during most of "the years of exploration and discovery" when Vinnell's party was climbing up mountains and going down into gullies looking for and examining the variety of rocks and soils, and trying from the color, composition, density and other physical characteristics of the rocks to recognize the minerals therein and to determine their economic value.
These early trips were very rewarding, in many aspects, for the participants. Be sides gaining valuable experience, they
located a number of properties which subsequently were put into production. It is interesting to note that some of these deposits were later extensively developed and successfully operated.
A year after the Mineral Materials Co. was formed, a contract was signed be tween that organization and the Riverside Cement Co. (presently owned by Ameri can Cement Co.) to furnish silica from Oro Grande in San Bernardino County to the California Portland Cement Com pany's plant at Colton, California. It was during this time that the Mineral Ma terials Co. began quarrying and produc ing silica for delivery to refractory silica, brick and cement manufacturers. The further exploration and evaluation of test cores that followed revealed that the de posits contained several million tons of desirable and recoverable quartzite.
View ot the primary jaw crusher and cone crusher complete with screening unit and stockpiling conveyor at Oro Grande silica mine. Behind the stockpile, at left, is a 350 ton bin used for loading trucks.
4
growth and success of this organization. Hit business foresight, imagination, managerial obil-
ity, hard work and integrity have contributed greatly to the respect and high regard that Min eral Materials Co. has achieved.
*"'* in ,h* ** ,930'* Exploitation of tho property started lat. in 1938 and continued through 1941.
Subsequently, Mineral Materials Co. undertook a contract to quarry and de
liver all the limestone needed by River side's Oro Grande cement plant.
Today, after almost thirty years of operation by the Mineral Materials Co., the production of silica continues from the same deposits by the Vinnell Mining and Minerals Co., formed in 1967 as a wholly-owned subsidiary of the Vinnell Corporation.
After the formation of Vinnell Mining and Minerals Co., a new plant was erected and went into production for the first time last March. This plant has a design capacity of about 200 tons per hour of finished product, crushed to 3/sths of an inch.
During World War II, the Three Kids Mine, located about five miles east of Henderson, Nevada, was a prominent producer of manganese, a mineral urgently needed for war materials.
KMX 00487
First mining camp set up by Mineral Materials Co. in the early 1 940's at the now famous Eagle Mountain mine near Desert Center in southern California. On the left, picture shows the mess building; at right, the first pit. Crushing and screening facilities shown in the picture were put into operation five days after crew and equipment moved into the area -- quite a fast start.
5
A closeup of the magnetic separating plant at Buena Vista mine in Nevada. At the top level of the plant is the primary magnetic separating equipment. Below ore the secondary and tertiary crushers. The plant was constructed and operated by Minerals Materials Co. prior to its being sold to U.S. Steel in 1958.
The silica rock is a quartzite and ranges from white to light buff in color. Drilling and blasting are necessary for its recovers' and mining is by open pit method, on twenty-five foot benches.
Present output of the mine and plant is about 1,600 tons per shift. Besides the cement industry market. Vinnell sells considerable tonnage of silica to the Pul verized Sand Co. of California, which has a grinding plant near Crestmore,
California. An important property with high grade
limestone deposits that attracted the at tention of Mineral Materials Co. during the early years of its operations is the one known as the Cushenbery property, in the Lucerne Valley area of California. Geological studies, test drillings and all the exploratory work convinced the pros pective buyers that the property would become very valuable and in the late 1930's it was acquired by Mineral Ma terials. Good business foresight required that the company plan not only for cur rent but also for future production. Thus, more land was located and purchased and the possibility of a cement plant being
built there was envisioned. In the meantime, operations began and
the first limestone produced was sold to Kennedy Minerals Co. and later to Kaiser Steel Corporation. In 1956, the property was sold to Kaiser Steel, which purchased the huge deposit to supply raw limestone to its affiliate, Permanente Cement Com pany, now Kaiser Gypsum & Cement Co. Permanente erected one of the nation's major modern cement plants, with a pro duction capacity of about 2.5 million barrels of cement a year. This property also supplies the large tonnage of lime stone needed by Kaiser Steel's Fontana plant.
Before World War II, a manganese property located approximately five miles east of Henderson, Nevada aroused con siderable interest on the part of the Min eral Materials Co. This property, known as the Three Kids Mine, was then owned by Major General Walter P. Story and Ray Boggs and Associates. Mineral Ma-
6
^ining and
Minerals Corporation
terials Co. signed a contract with the owners and the U. S. government to mine and supply ore to the large pilot plant at Boulder City, Nevada. When all studies of the mine had been completed, the conclusion was that the Three Kids would be an important operation, and that's just what happened. During the war years the mine became a prominent producer of manganese, a mineral urgently needed for the war effort in both the South Pa cific and in Europe.
One of the major mining operations undertaken by Mineral Materials was the Buena Vista iron mine, twenty-six miles east of Lovelock, Nevada. The land was patented at the turn of the century and was acquired by Mineral Materials Co. in 1940. First studies indicated a limited tonnage of iron ore reserves but later extensive exploratory work con vinced Mineral Materials that the iron deposit there was not only of major pro portions but also that the grade of iron was of high quality.
In the following years, the property was developed and in 1951 was put into
Th* Iron Hat property, leased and operated by Mineral Materials, produced on open hearth grade iron ore sold to Kaiser Steel and a cement grade sold to Riverside Cement Co.
Iron or# from tho Buona Vista mint in Nevada is loaded on a cargo ship at Port Stockton, California for shipment to Japan.
Another good example of Mineral Materials Co. exploratory ability is the Tecuya-Lebec property near Frazier Park, California. After thorough exploration
and geological tests, it was found lo have a substantial tonnoge of limestone of good quality which is always in demand. Today the Tecuya-Lebec prop
erty is considered to be one of the major limestone reserves in southern California. Pictured is a NW6 shovel loading rock lo be hauled from the pit to
the mill where it is crushed for roofing granules.
-
7
production. The ore mined during the first years was shipped directly to the steel mills just as mined, without upgrad ing. It was loaded at the Colada siding of the Southern Pacific Railroad, some twen ty-six miles from the Buena Vista mine.
Late in 1957. the first unit of a mag netic separating plant was completed and went into operation with a capacity of approximtely 300 tons an hour. The main plant consisted of a large primary crusher to reduce the size of the ore be fore it reached the mill, where it was further crushed and screened to various sizes then passed over a series of mag netic separators which sorted the waste material from the magnetic iron ore.
The magnetic concentrate was sold to Japanese steel mills; to Kaiser Steel's Fon tana plant; to U. S. Steel's plants at Ge neva, Utah; to the Los Angeles foundaries: to the U. S. Navy, and also to the U. S. Atomic Energy Commission which uses selected high grade magnetite for shielding against atomic radiation in the construction of nuclear reactors. This property was sold in 1961 to the U. S. Steel Corporation.
Caterpillar front end loader, loading tuff ore into rock truck ot California Portland Cement Co.'s quarry, near Tehachapi, California.
KMX 00490
H. A. KRAMER Superintendent of Mines for Vinnell
Mining and Project Manager,
Coalinga Plant Atlas Asbestos Co.
ELMER LEE Office Manager Coalinga Plant
The White Eagle gypsum mine, which is about six miles north of Henderson. Nevada is one of the mines that Vinnell and Dunton discovered during their early years of exploration. Begun late in the 1930's, exploration of the mine was car ried on through the early 1940's. The property was opened for production in 1947 and in 1949 was sold to the Flintkote Company.
The famous Eagle Mountain mine near Desert Center in southern California, now operated by Kaiser Steel, was first put into production by Mineral Materials Co. in 1944. The property was acquired on a lease option by Harlan Bradt and Edward Foley from the Southern Pacific Railroad Co. and was leased and oper ated by Mineral Materials Co. until 1947 when their interest was purchased by Kaiser Steel. After sale of the mine to Kaiser. Mineral Materials Co. contracted to mine and supply the first blast furnace ore used at Kaiser's Fontana. California mill.
Conveyor system stockpiling products from the crushers ot California Portland Cement Co.'s quarry. The finished material is loaded on trucks and hauled to their cement plant 14 miles away.
8
Allis-Chalmers self-loading scraper is used in delivering background! at Coalinga, California.
ABILITY TO EXPLORE AND DEVELOP NEW DEPOSITS
M. W. (MEL) REDHEAD
Vice-President of Vinnell Mining and Minerals Corporation.
Mel has been with Mineral Materials Co. since 1952 and, through the years, he has worked closely with Clair Ounton to achieve the present growth and status of the company.
The ability of Mineral Materials to ex plore and develop virgin deposits is well demonstrated in the case of the Mt. Ray mond mine, located approximately sixty miles northeast of Fresno, California. The property was acquired by Mineral Materials in 1958 and by the early 1960's a well-planned exploratory program was underway. All the preliminary studies have been encouraging and market feasi bility studies as well as metallurgical tests are being planned.
Also in the 1950's, Mineral Materials Co. contracted with Kaiser Steel for the mining operation of the Silver Lake iron deposits north of Baker, California where the company mined a specialized type of ore for the production of special steels.
A crushing plant was installed and kept busy supplying a fleet of forty-five 22 ton trucks working around the clock to de liver ore to a stockpile fifty miles away at Dunn siding, west of Baker, California.
One of the richest tungsten mines in the United States was the well-known Star Bright, near Barstow, California. This property was acquired by Mineral Materials Co. in 1951. At first it was be lieved to be only a good prospect but further studies proved it a valuable tung sten reserve. The mine was operated at the start by open pit mining methods and later developed by underground shafts and drifts. When the Government's pro
gram of purchasing tungsten tapered off, the operation was discontinued and in
A good illustration of Mineral Materi als' exploratory ability is the TecuyaLebec property near Frazier Park. This property is considered to be one of the major limestone reserves in southern Cali fornia and was acquired by Mineral Ma terials in the early 1950's. Preliminary geological work indicated that there was a substantial tonnage of limestone of good quality, which is always in demand for cement and other lime products, and Mineral Materials went into a program to develop the property. Access roads were built and a primary crushing plant
was set up to reduce the limestone to various marketable sizes. After primary crushing, the product was further crushed for white roofing granules at a nearby installation operated by the Industrial Mining and Milling Co. Because of its proximity to the market as well as to the center of the burgeoning southern California population, this mine is still one of Mineral Materials' most valuable properties.
The dryer at the Atlas Asbestos Co.'s plont at Coalinga, California.
asbestos ore from the pit to the plant (shown in the
Trucks loaded with asbestos material from the Atlas Asbestos Co/s Coalinga plant obout to leave for the Los Angeles area. The building behind the warehouse contains fiberizing and other processing equipment.
1953 the property was sold. In mid 1956, Mineral Materials pur
chased 180 acres of property located north of the city of Boron, California. This property is adjacent to the U. S. Borax and Chemical Corporation mine and thorough exploration by core drilling in the following years proved it to be a good deposit of colemanite, used in the manufacture of solid rocket fuel.
For the last sixteen years, Mineral Ma terials has been operating a pyrophyllite deposit located about fourteen miles east of Victorville. California. The property was purchased in 1950 and after the ex ploratory work was completed two years later, the mine was put into operation. Since then, thousands of tons of this talc like material have been produced and sold as a mineral filler as well as for other uses. It has been estimated that the remaining pyrophyllite constitutes one of the largest known reserves in the western United States.
Although Mineral Materials Co. has now discontinued quarrying and active mining operations, it continues to own active mining properties, as well as claims and leases on other properties. At present, the company's activities are confined to the investigation and exploration of new deposits for possible future development and exploration.
Formation of New Company
In order to meet the steady expansion in mining and mineral operations, the new Vinnell Mining and Minerals Cor poration, a wholly owned subsidiary of Vinnell Corporation, was set up late in 1967.
Soon after, the new company formed a joint venture with California Minerals Corporation of San Diego, and in Janu ary of 1968, the joint venture, known as Atlas Asbestos Co., purchased a plant and began asbestos operations in Coalinga, California.
The asbestos in the Coalinga deposit is of a very high grade, and is unique in its degree of whiteness and its high ab sorption quality.
Although Atlas Asbestos supplies the floor tile manufacturers in the southern California area (such as Armstrong Cork Company, Inc., Kentile Inc.land Lunday
Successful Program
in Niger, Comment
KMX 00492
by U. S., Other Officials
For the last two years Vinnell's Tech nical Services Division has been work ing closely with the U. S. Agency for International Development (AID) in order to advance the technical knowledge of citizens of the West Africa Republic of Niger. And the training program started there by Vinnell in 1966 is now on its way to complete success.
On this occasion, it is interesting to recall that when this program began some serious difficulties were encountered with regard to the general background of
Thaggard Oil Company, a large part of the shipments are made to the East Coast. Also, some of the products are being exported and it is hoped that this market will expand.
Among the other products made from the Coalinga deposit is Drilbestos, an ad mixture used for drilling mud in deep well oil drilling. Studies have recently been conducted to determine changes to be made in the plant in order to increase production and broaden the range of pro ducts offered for sale to other users of asbestos.
In early 1968, Vinnell Mining and Minerals Corporation signed a contract to mine and crush 250.000 tons of tuff ore (pozzolan) for California Portland Cement.Company's plant at Mojave, Cali fornia. The mining and crushing opera tion, located at Tehachapi, California, started last April.
The above brief outline of operations performed does not cover all of the ac tivities of the organization. It does, how ever, illustrate experience and capabilities which have contributed valuable services not only to the mining industry but also to the economic growth and power of America in the past thirty-five years.
the trainees. Students who had been em ployed by the Government of the West Africa Republic of Niger for the purpose of receiving the training had very little formal education and in most cases they lacked any technical experience. This was a major impediment to communication for both trainers and trainees.
On the other hand there were certain encouraging aspects such as the deter mination of the Government of Niger to go ahead with the program, the impor tance that the U. S. AID African Bureau placed on its mission there, and above all the strong desire of the young trainees to learn.
These important facts were recognized by our personnel in Niger and with the combined effort of all concerned, the difficulties were soon overcome and the situation began to improve.
Official Recognition of Results
In his initial inspection of the project which took place last year, the Assistant Administrator of the U.S. AID--African Bureau in Washington, D.C., Mr. R. Peter Straus, expressed his satisfaction with the progress that the Nigerian stu dents were making.
Our personnel in Niger have also been praised for their outstanding work there by the U. S. Ambassador to Niger, Mr. Robert J. Ryan: the Nigerian Minister of Agriculture and Rural Economy, Mr. Maiden Mamoudou: and other govern mental officials of both countries.
Members of the Vinnell team in Niger are: Jack C. Gunther, Jr., team leader and project manager; Bernard LeTourneau, fleet operations and maintenance specialist: Alfred A. Brooks, diesel engine specialist; Jack W. Doane and James L.
Mizzelle, equipment specialists; Raymond J. Ornelas, automotive specialist; and Arthur H. Auvil, spare parts specialist.
From I. lo r.f Jim Mizzelle, Vinnell's heavy equipment specialist; R. Peter Straus, Assistant Administrator, AID African Bureau (Washington, D.C.); and M. Abdoulaye Hamee, equipment repair group leader, during the initial inspection of the project by Mr. Straus. In the picture, at right, is Ray Ornelas, Vinnell s automotive specialist in Niger, explaining the engine analyzer to a group of eager young Nigerian trainees.
10
W. B. Hester HOUSING UNITS, HIGHWAY
Joins Vinnell
WALTER B. HESTER Another step towards the expansion of Vinnell's diversified activities has been taken with the appointment of Walter B. Hester as Vice President of Vinnell Corporation. Walt, a well-known personality in the mining field in the United States and abroad, is in charge of Vinnell's International Mining Division, respon sible for business development in the areas of exploration, stripping, and mining of mineral deposits. A U. S. C. graduate with a B.S. degree in mining engineering, Walt
AMONG NEW PROJECTS
At the end of May, the California Divi sion of Highways awarded to Vinnell's Highway Division of Phoenix, Arizona a contract for the construction of an eight lane freeway near Cajon Pass, San Ber nardino County. California. The contract calls for grading and surfacing the road way with Portland Cement concrete on a cement treated base as well as for the construction of three bridges between Highway 138 (north of Cajon) and Highway 395 (south of San Bernardino).
The project started in July and is scheduled for completion next summer.
Another project undertaken this sum mer by the Highway Division is the Toll House Road near Huntington Lake, Cali fornia. Owner of the project is the U. S. Bureau of Public Roads.
Projects in the Philippine Islands.
A project for the construction of a total of 440 units of family housing for the U. S. Department of the Navy was undertaken this summer by Vinnell's Philippine Division. The contract calls for the construction of one and two story units at the U. S. Naval Station, Langley Point, and at Clark Air Force Base.
The buildings will be both single and duplex housing units of similar type con struction, with concrete masonry exterior walls supported on reinforced concrete foundations. There will be reinforced
roof beams with asphalt shingle roofing over plywood sheathing. Interior walls and partitions will be concrete masonry and gypsum wallboard, with wooden doors and aluminum, awning type win dows.
In addition, the contract calls for elec trical distribution in the housing areas, with street lighting, sewer and water lines, roads, drainage systems and erosion con trol.
Another project undertaken by this division consists of the construction of an approach pier and drydock mooring at the U. S. Naval Base's Ship Repair Facility at Subic Bay. The project is underway and is expected to be com pleted by the end of the year.
Also, Vinnell's Philippine Division was awarded a U. S. Naval contract for im provements of the Receiver Building at Zimbales, San Miguel, on the Philippine Islands. This project should be completed by April, 1969.
brings to the Vinnell organization thirty-four years of experience in all aspects of mining.
Prior to his present appointment, Walt was Chief Engineer for Cerro de Pasco Corporation in Peru; Director of Engineering at Stearns Roger corpora tion, Denver, Colorado; and most re cently, Executive Engineer for Bechtel Corporation's International Division in San Francisco, California.
New Warehouse for United Motor
Service
A. J. Huber, Operations Manager, an nounced that the Building Division re ceived a contract last July from the United Motor Service, a division of General Motors Corporation, for the construction of a large new warehouse and office building in La Habra. Cali fornia. Work on this project started in August, 1968.
QUITE A RECORD
Key personnel of the Amistad Dam project are shown celebrat ing the day the crew finished placing 100,000 cubic yards of cement in a single month on the Mexican side of the dam.
This was quite a record for Mexico, because it was the first time that such an impressive amount of concrete had been placed in a month's time on any job in that country. For this out standing achievement, the crew received congratulations from the Mexican Government.
From I. to r. are: Fernando Cortes, engineer-chief superinten dent; Charles (Chuck) Romano, general superintendent; Oskar Gonzales, resident engineer; and
John J. Feira, engineer, project manager. The construction of the Mexican side of the dam, under taken by "La Victoria y Asociados S.A.," an associated company of Vinnell Corporation in Mexico City, has been completed. The American side of the project, which is being constructed by the joint venture of Perini (sponsor)-VinnellJones-Leavell, is expected to be completed early in 1969.
".i- .
11
^3<x% ('ttotpm ueutt s4ieci
The construction of the Box Canyon Dam and its surrounding recreational facilities is progressing on schedule and the project is expected to be complete early next year.
As of August. 1968 fifty percent of the concrete items had been finished, as well as most of the work in the recreational area. It is estimated that overall progress is about sixty-five percent.
The project, which is located in the beautiful Siskiyou Count> in northern California about two miles southwest of the town of Mt. Shasta, consists of the construction of a concrete gravity type dam, with an earth abutment section on the Sacramento River. It also includes the development and enhancement of the recreational and fishing facilities in the surrounding area.
Concrete bucket dock at the Box Canyon Dam project. The electric "goose car'* is dumping three inch mass concrete into an 8 cubic yard bucket which travels by cableway to one of the main blocks in the dam. In the background is the concrete mixing plant.
And away it goes! The 8 cubic yard bucket full of concrete travelling to one of the dam blocks. Mt. Shasta is viewed in the background.
12
GENERAL VIEW OF THE BOX CANYON DAM PROJECT, height of the dam when completed. The traveling tower the earth embankment section of the dam that ties into
&ec<tote& ^Vacation
KMX 00495
The reservoir covers a total of 430 acres, with a maximum depth of 200 feet. Length of the dam is 1,100 feet and the spillway crest is 141 feet long. The ele vation at the top of the dam is 3.204 feet and that at the crest of the spillway 3,187 feet.
The project started on August 1, 1967 and the first 404 cubic yards of concrete were poured on May 7th of this year. It is estimated that a total of 130,000 cubic yards of concrete will go into the completed structure.
Compared with Vinnell's other current heavy construction projects, such as John Day Dam, Little Goose Dam, etc., the Box Canyon Dam job is of a lesser mag nitude. Regardless of its size, however, the job -- as is the case with any job -- has had its problems and headaches.
View of the upstream face of the Box Canyon Dam at the Sacramento River headwaters. At the
center of the pictures, an 8 c.y. cableway concrete bucket is placing concrete. At the bottom of the
structure are the two diversion pipes through which the river is flowing.
At center, a cableway lowering on 8 cubic yard bucket of concrete to the pour in progress. At right a completed section of the structure shows the eventual of cableway is visible at the far right. At the far left are the concrete batch plant, aggregate storage and shop areas. Trench at the left center will contain the concrete retaining wall being constructed at the left of the concrete dam.
13
KMX 00496
Among them was the time needed for the preparation of the irregular and weathered foundation rock to receive the first concrete .pours. This process was a very slow one and caused a great deal of anxiety among Vinnell personnel, who were eager to keep the- job going. An other delaying factor was the high river water which prevented an early start on the work on the river bottom.
Size not indicative of the problem.
"Though Box Canyon is considered a
small dam project, its size is certainly not
indicative of the many problems one
must solve", said Dean Lodmell, Vinnell's
project engineer. And Lou Mace, Sr.,
general superintendent, concurred. "This
project is interesting to build but a little
tough", he said.
_
In any case, the personnel on the job
try to solve the problems one by one as
they come along, and the project is pro
gressing according to schedule.
The construction of the recreational
area includes the following: entrance
station building, concession building,
comfort stations, access and service
roads, family and camping units, beach
area and dressing rooms, boat and park
ing areas, and water and sewer systems.
It is expected that the recreational
area will be open to the public in the
spring of next year, allowing overnight
campers as well as vacationers to enjoy
the scenic beauty and relaxing atmos
phere of the Mt. Shasta country.
A beautiful spot for a vacation.
The Siskiyou County, with its cool, clean mountain air, is an ideal place for year-round vacationers and offers pleas ure and relaxation vitally needed. At an elevation of 3,500 feet, the summer days are warm, with an average daily tempera ture of sixty degrees, and nights are cool enough to be enjoyable. Mt. Shasta, the glacier-covered extinct volcano, rises to an altitude of 14,162 feet and is a pic-
PROJECTS COMPLETED BY
VINNELL DIVISIONS
This summer, Vinnell's Highway Divi sion of Phoenix, Arizona, completed two of its projects in Utah and California.
The project in Utah, a 14.049 mile highway in Emery County, is a part of the Interstate Highway 70 system. It will provide a more direct route between Den ver, Colorado and Los Angeles, Califor nia. Owner of the project is the State Road Commissioner of Utah.
The other completed project is located 25 miles north of Coalinga, California and is a 28 mile divided highway on In terstate 5. Owner of the project is the State of California Division of Highways.
Also, Vinnell's Building Division fin ished two of its projects in southern California.
Bridges for Standard Oil Co.
The first project, consisting of the in stallation of free standing heavy duty steel supports and bridges for a major pipeline at El Segundo, California, is owned by the Standard Oil Co. of Cali fornia, Western Operations, Inc. Most of the job had to be built over existing pipe fields, which created a problem regard ing installation of the large concrete foundations. In some areas, the excava tions for these foundations were ten feet deep and ten feet wide, with the only access between existing pipe that lay on
ture of scenic beauty, particularly in winter time when covered by snow. It provides the finest and largest skiing area in the whole western region. Shasta coun try is a year-round playground and the completion of the Box Canyon recrea tional dam will be an additional asset to the area.
According to the owner's representa tives, McCreary-Koretsky-Engineers of San Francisco, the Box Canyon project is the first of a series of recreational dams to be built in the State of California.
the ground, allowing only twenty inches of crawl space to get into the holes and remove the dirt. In some locations the pipes were red hot steam lines making the job even more difficult.
However, the job was completed on time because, as Fete McAlpine points out, "We try to anticipate the difficulties to be encountered on each project, and find solutions ahead of time." Vinnell representatives on the job were: Paul Maag, job superintendent: Dave Powell, project engineer: and John Schalliga, owner's field representative.
Office and warehouse
The second project, owned by the Big Three Industrial Gas & Equipment Co. of California, consists of the construction of one prefab metal building approxi mately 4,800 square feet, with installation of offices, including all finish cabinets, paneling carpentry and suspended ceil ings.
The Big Three office and warehouse project is located at 5901 Paramount Blvd., North Long Beach. California. Owner's chief engineer was Cyril Adams, with Bob Houston as field representative. Vinnell's field foreman was Elmer Han sen.
Both projects were under the direct supervision of Pete McAlpine, manager of the Southwest Section of Vinnell's Building Division.
CONTRACT SIGNED
FOR NEW PIPELINE
Harold Pope, Vice President and Gen eral Manager of Vinnell's Underground Division, announced in August, 1968 that his division had been awarded a con tract from the Metropolitan Water Dis trict of Southern California to construct a 9.81 mile pipeline, from a point near Temecula, west of Highway 395 in River side County, to Fallbrook in San Diego County.
The project is the second pipeline to be constructed on the second San Diego Aqueduct. The job includes the laying of 52,655 lineal feet of 88 inch diameter, rubber gasket, concrete lined and steel coated pipe.
It is anticipated that pipelaying will begin early next year with completion of the project scheduled for the summer of 1970.
Vinnell personnel ot the Box Canyon Dam project include, from I. to r.: Bruce Merriman, purchasing agent; Lowell Whitley, engineering aide; Don Lelange, accountant; Cal Carpenter, office manager; (now enroute to Korean projectsl; Bill Lofland, equipment superintendent; Phil Barnes, field engi neer; Whitey Condaux, carpenter superintendent. Back row, I. to r.: Bernie Moore, payroll-costs; Jim Bell, excavation superintendent; Bob Jenks, project manager; Dorothy Osborne, secretary; Jim Fox, concrete superintendent; Dean Lodmell, project engineer; and Lou Mace, Sr., general superintendent.
FORMER EMPLOYEE
GOODWILL AMBASSADOR
Wallace Dunton. who in 1946 succeeded A1 Kirkland as project manager on Vinnell's first Asian project in the Marianna Islands of the Pacific, left at the end of August for a three week good will trip to Europe. Hr is with a group of eighteen United States citizens who are participating in a People to People tour in France. Hungary, Italy. Spain. Romania and the Soviet Union.
Good luck on your mission, Wallace.
14
Ouz Peopie and *Jheiz Work
It has been the policy of Vinnell Corporation, through the years, to offer equal opportunity employment to all qualified persons without regard to race, creed, color, sex or national origin. This basic policy has been extended to all aspects of employment including, but not limited to, placement, upgrading, transfer, layoff or termination, etc.
JOHN NELSON
Vinnell Project Manager in Vietnam
** .
' ,2
CHIRAPHAN CHULAKASEM
Typist at Vinnell office in Thailand
ALEXANDER POWERS
Vinnell Project Manager in Thailand
NEW FACILITIES FOR EXPANDING OPERATIONS AT HOME OFFICE
RUDY L. ZEGARAC
Asst. Project Manoger, Marine Operations. Cam Ranh Bay
Dean Lodmell. Vinnell project engineer on the Box Canyon Dam. won the annual Mt. Shasta Golf Tournament at the Weed golf course last August.
Phil Barnes, field engineer on the same project, placed third in the same event.
Congratulations. Dean and Phil.
To provide space for additional ad ministrative officers and staff members, a 120 foot long modular building was in stalled by Vinnell's Steel Division. The building was comprised of 12 prefabri cated ten foot modules which took two weeks for installation. The building houses the accounting staff and the em ployees lounge. It provides an account ing area, a reception room and five indi vidual offices for W. J. Breer, fiscal manager; H. H. Uyeda. controller; Ralph Dickenson, George Coats and Don ald Stapleton, administrative accountants.
Vinnell Steel has built this type of structure since 1964. Used primarily for public schools, there are in excess of one thousand of these pre-built class rooms in California alone. The buildings are prefabricated in the Oakland Plant and trucked to the jobsite on specially de signed trailers. They are then installed and are ready for use within three days to two weeks. The buildings are generally
HOME OFFICE BOWLING LEAGUE
Early in August, Vinnell employees at the Alhambra office formed a thirty-eight player league to participate in inter-organ izational bowling games.
The league consists of six teams of five players each. President of the league is Gary L. Farris; vice-president is Marie Zurbriggen; and secretary-treasurer is Russell F. Vatcher. All are from the accounting de partment.
Vinnell Corporation has sponsored the league, and has provided shirts and winner's trophies.
KMX 00497
less expensive and much faster to build than on-site construction, and can easily be relocated should the need arise.
The Executive Building
The Vinnell Corporation's executive building on Westminster Avenue, where the accounting personnel has been housed for the past fifteen years, has been re modeled to provide additional office space for M. L. Brockmeyer, assistant vice president, administration; Lynn Carlson, assistant vice president, finance; and By ron Thompson, manager-contract admin istration.
HOW TO PREVENT A RIOT
As you may know, it gets rather hot in Pomeroy, Washington during the summer and with the town's only public swimming pool needing repairs in order to become op erational, Willis Woomack, the pool chair man, was faced with a problem. The town treasury lacked (he necessary funds for the repairs, which meant that the pool would have to remain closed during the summer. He feared "civic discontent"--particularly on the part of the children.
Warren Cassens, an employee of Vinnell's Little Goose Dam project, and a resident of Pomeroy, heard all about the problem and discussed it with John Heckart, project man ager. In a move to "preserve the peace" Heckart offered the use of a sandblasting machine. Other Vinnell employees headed by Bob Plumb and Kenneth Slaybaugh offered their labor to assist the town crew, and Robert Shacher. a painter at the dam. applied two coats of paint over the entire pool for a modest sum.
Pomeroy enjoyed a long, cool summer and peace and order were maintained.
15
VINNELL CORPORATION
1145 Westminster Ave., Alhambra, Calif. 91802
KMX 00498