Document NGjKGN5EgYqGz3nEkeb9brwMy

Operation Report Dept. 246 - Aroclor April - 1965 PRODUCTION SUMMARY (Current Month) Scheduled - Actual - . # of^ Schedule - 2,400,000# 2,401,177# 100# PRODUCTION SUMMARY (Year to Date) Aroclor Current Month Year to Date 1242 1248 1254 1260 1262 420,663# 540,741# 0 3,249,535# 2,477,169# , , #2,511,170# 1 666 721 35,820# Total - 2,401,177# 9,940,415# Average Monthly Production - 2,485,100# Availabilities Repair - 93.19# Process - 99.17# Total - 82.92# Other - 90.56# The outages for this month are summarized below. Repair 39 Hrs. (5.42#) Changed No. 2 still pump twice. 10 Hrs. (1.39#) (5 Hrs.) (3 Hrs.) ' (2 Hrs.) Changed No. 2 sill furnace coil. Rate was reduced on one chlorinator because proper rupture disc was not available. Changed outlet valve on No. 2 still. Other 4 34 Hrs. (4.72#) Insufficient supply of chlorine. 32 Hrs. (4.44#) Changing products. Process 5" Hrs. (0.83#) (2 Hrs. ) (2 Hrs.) (2 Hrs.) Operating error at chlorinators Plugged line reduced chlorine supply to one chlorinator. Blew rupture disc when a valve in the off-gas line was inadvertently closed. Yields # Theory on Biphenyl Standard 95.50# Actual 98.25# YTD 98.hb# DSW 296457 STLCOPCB4066401 Dept. 246 (cont.) 2 Quality Two lots of electrical grade 1242 aroclor were produced this month with thermal-chemical stabilities of 0.40 ppm and 0.62 ppm. The practice continued of using the distillate at the end of each 1242 run for non-electrical grade material. The Process Research Group and Technical Services are continuing to study the effect of process variables on aroclor quality. Plans are now being made, to investigate variables at the chlorination step using PR&D's GLC technique to measure quality quickly and easily. Operations The back pressure on the HC1 off-gas line continued to be higher than for the first two months of this year. This is apparently causing no problems since 92.75$ of our HC1 gas was recovered. The high back pressure could be a result of changes in the auto matic distributing system near the HC1 using departments. No' progress was made in putting into service the nuclear density gauge on No. 4 chlorinator. TSD has been asked to demonstrate this device since there is a wide discrepancy between the instru ment and hydrometer readings. Stock Position Aroclor 1st of Mo. Last of Mo Whse. Stock Dept. Stock - 1,566,205# 1,594,780# 860,081# 2,4547861#- ghw D. E. Harris SVV 296458 STLCOPCB4066402