Document NGbMzxkk0oodrQ72By2ekdn3Q

PLAINTIFF'S gXHIBIT;-^ MON-95 CHOCOLATE BAYOU PLANT HISTORY A detailed study group was set up In 1960 to study the feasibility of a more basic Hydrocarbon Plant In Monsanto. In January, 1961, the present 3000-acre site on Chocolate Bayou was acquired and construction began that summer. Ethylene and Co-Products facility and a Phenol Plant of Organic Division went on stream in the fall of 1962 with formal dedication of the plant by Monsanto President, Soimier, In December of 1962. Since 1962, the following changes to the plant have occurred: SAB (Soft Alkyl Benzene) AN Plant No. 2 (Acrylonitrile) Resin Plant AN Plant No. 3 (Acrylonitrile) NTA Plant (Nitrilo Trlacetlc Acid) SAB (Soft Alkyl Benzene) Refining Phenol Plant No. 2 Formalin Plant DPO Plant (Diphenyl Oxide) Sorbic Plant IDA Plant (Imlno Diacetic Acid) Olefins Plant 0&A Operations Transferred to DuPont Phenol/ResIns Shut Down MHBA Plant C 002936 CBV 3109349 P lant Organization